【正文】
1 Dec 2023 Port of Loading Lianyungang Vessel A Date : 2 Dec 2023 Port of Loading Nanning Vessel A Date : 4 Dec 2023 Port of Discharge Singapore Port of Discharge Singapore Port of Discharge Singapore LC states : Any Chinese Port to Singapore Partial shipment not allowed. NO Partial Shipment ? Same means of conveyance ? Same journey ? Same destination The shipment date= Latest date of the BLS (4 Dec 2023) 3 sets BL presented 信用證操作實(shí)務(wù) 20 Port of Loading Shanghai Vessel A Date : 1 Dec 2023 Port of Loading Shanghai Vessel B Date : 1 Dec 2023 Port of Discharge Singapore Port of Discharge Singapore LC states : from Shanghai to Singapore Partial shipment not allowed. Partial Shipment ? More than one means of conveyance ? Same mode of transport ? Same day ? Same destination 2 sets BL presented 信用證操作實(shí)務(wù) 21 如開證時(shí)設(shè)定分批的裝運(yùn)日程表,受益人要注意 ?按裝運(yùn)日程表準(zhǔn)時(shí)付運(yùn); ?如信用證規(guī)定在指定的時(shí)間段內(nèi)分期支款或分期發(fā)運(yùn),任何一期未按信用證規(guī)定期限支取或發(fā)運(yùn)時(shí),信用證對(duì)該期及以后各期均告失效 信用證操作實(shí)務(wù) 22 Q:提單:集裝箱提單經(jīng)常會(huì)有批注,什么樣的批準(zhǔn)是不清潔的?什么樣的又是清潔的? 關(guān)于單據(jù)的問題 —— 提單 A:載有明確聲明貨物或包裝狀況有缺陷的條款或批注的提單不可接受。 :42:2120:42Jan2331Jan23 ? 1故人江海別,幾度隔山川。 , January 31, 2023 ? 很多事情努力了未必有結(jié)果,但是不努力卻什么改變也沒有。 2023年 1月 31日星期二 8時(shí) 42分 21秒 20:42:2131 January 2023 ? 1空山新雨后,天氣晚來秋。 2023年 1月 31日星期二 下午 8時(shí) 42分 21秒 20:42: ? 1最具挑戰(zhàn)性的挑戰(zhàn)莫過于提升自我。勝人者有力,自勝者強(qiáng)。 。 2023年 1月 31日星期二 8時(shí) 42分 21秒 20:42:2131 January 2023 ? 1做前,能夠環(huán)視四周;做時(shí),你只能或者最好沿著以腳為起點(diǎn)的射線向前。 , January 31, 2023 ? 雨中黃葉樹,燈下白頭人。開證行付款。 支付條件 單證相符 單單相符 3 貨物 出口商 (受益人) 進(jìn)口商 (申請(qǐng)人)