【正文】
Application, GB/ T14370 《硅酸鹽水泥、普通硅酸鹽水泥》 GB175 Portland Cement and Ordinary Portland Cement, GB175 《用于水泥和混凝土中的粉煤灰》 GB1596 Fly Ash Application in Cement and Concrete, GB1596 《建筑工程施工質(zhì)量驗(yàn)收統(tǒng)一標(biāo)準(zhǔn)》 GB503002020 Standard on Construction Quality and Acceptance Inspection of Building Work, GB 503002020 2. 混凝土工程質(zhì)量控制點(diǎn) Quality Control Point 序號 質(zhì)量控制點(diǎn) 控制內(nèi)容 控制方法 等級 參 加 單 位 控制表格 驗(yàn)收表格 評定表格 施工總承包商 監(jiān)理 PMC 業(yè)主 政府部門 1 技術(shù)準(zhǔn)備 施工現(xiàn)場質(zhì)量管理應(yīng)有相應(yīng)的施工技術(shù)標(biāo)準(zhǔn),健全的質(zhì)量管理體質(zhì),施工質(zhì)量控制和質(zhì)量檢驗(yàn)制度;有施工組織設(shè)計(jì)和施工技術(shù)方案,并經(jīng)批準(zhǔn) 審查現(xiàn)場質(zhì)量管理體質(zhì),審查施工組織設(shè)計(jì)和技術(shù)方案、分包資質(zhì) B X X X 工程開工/復(fù)工報(bào)審表、施工組織設(shè)計(jì)報(bào)審表、分包單位資格報(bào)審表 2 鋼筋、鋼筋機(jī)械連接用鋼套筒等原 材料進(jìn)場、報(bào)驗(yàn) 檢查物資出廠質(zhì)量證明文件及檢測報(bào)告是否齊全;對有抗震設(shè)防要求的框架結(jié)構(gòu),其縱向受力鋼筋的強(qiáng)度應(yīng)滿足設(shè)計(jì)、規(guī)范要求;物資表觀質(zhì)量符合要求,按規(guī)定須抽檢的材料、配件是否及時(shí)抽檢; 按施工方編制的見證取樣計(jì)劃進(jìn)行取樣復(fù)試; 審查質(zhì)量證明文件,目測材料外觀是否合格 全數(shù)檢查 按施工方取樣計(jì)劃 30%抽檢 B X X X 工程材料/構(gòu)配件/設(shè)備報(bào)審表、材料、構(gòu)配件進(jìn)場檢驗(yàn)記錄、物資出廠合格證、質(zhì)量保證書、商檢證、鋼材性能檢測報(bào)告、鋼材試驗(yàn)報(bào)告、 XX 報(bào)驗(yàn)申請表 3 地基驗(yàn)槽 符合設(shè)計(jì)、規(guī)范要求 全 數(shù)檢查 A X X X X 釬探記錄、隱檢記錄、地基難槽記錄、XX 報(bào)驗(yàn)申請表 4 平面放線 軸線位置、底模表面標(biāo)高、截面內(nèi)部尺寸、預(yù)埋件位置、標(biāo)高,預(yù)留鋼尺檢查及測量儀器觀測 B X X X 工程定位測量記錄、基槽驗(yàn)線記錄、樓層 洞大小、位置、標(biāo)高等 平面、標(biāo)高放線記錄、分項(xiàng)/分部工程報(bào)驗(yàn)表、 XX 報(bào)驗(yàn)申請表 5 鋼筋加工 鋼筋的彎鉤和彎折符合規(guī)范要求,鋼筋調(diào)直方法、加工的形狀、尺寸符合要求 鋼尺檢查 每工作班同類型鋼筋、同一加工設(shè)備抽查不少于 3 件 B X X X 鋼筋加工檢驗(yàn)批質(zhì)量驗(yàn)收記錄表、 XX 報(bào)驗(yàn)申請表 6 鋼筋連接 縱向受力鋼筋的品種、規(guī)格、數(shù)量、位置等;鋼筋連接方式、接頭位置、接頭數(shù)量、接頭面積百分率等;箍筋、橫向鋼筋的品種、規(guī)格、數(shù)量、間距等;預(yù)埋件的規(guī)格、數(shù)量、位置等 目測、尺量、檢查產(chǎn)品合格證、接頭力學(xué)性能試驗(yàn)報(bào)告等 C X X 施工檢查記錄(通用)、鋼筋接頭的試驗(yàn)報(bào)告等 7 鋼筋驗(yàn)收 縱向受力鋼筋的品種、規(guī)格、數(shù)量、位置等;鋼筋連接方式、接頭位置、接頭數(shù)量、接頭面積百分率等;箍筋、橫向鋼筋的品種、規(guī)格、數(shù)量、間距等;預(yù)埋件的規(guī)格、數(shù)量、位置等符合設(shè)計(jì)要求 目測、尺量 條全 數(shù)檢查 B X X X 分項(xiàng)/分部工程施工報(bào)驗(yàn)表、隱蔽工程檢查記錄、鋼筋安裝工程檢驗(yàn)批質(zhì)量驗(yàn)收記錄表、 XX 報(bào)驗(yàn)申請表 8 模板配板 模板及其支架應(yīng)根據(jù)工程情況設(shè)計(jì),應(yīng)具有足夠的承載能力、剛度和穩(wěn)定性,能可靠承受施工荷載 審查施工方案,全數(shù)檢查 B X X X 施工組織設(shè)計(jì)報(bào)審表 9 模板支設(shè) 模板支撐滿足施工要求、模板隔離劑不得沾污鋼筋和砼接槎處、模板接縫不漏漿,按設(shè)計(jì)要求起拱,不遺漏固定在模板上的預(yù)留孔洞,安裝偏差滿足規(guī)范要求等 目測、尺量、水準(zhǔn)儀或拉線鋼尺檢查 C X X 施工檢查記錄 (通用) 10 模板驗(yàn)收 模板支撐滿足施工要求、模板隔離劑不得沾污鋼筋和砼接槎處、模板接縫不漏漿,按設(shè)計(jì)要求起拱,不遺漏固定在模板上的預(yù)留孔洞,安裝偏差滿足規(guī)范要求等 目測、尺量、水準(zhǔn)儀或拉線鋼尺檢查 支撐 。 The approved construction anization plan and technical proposal should be available. Review contractor’s Site Quality control System, construction anization plan and technical proposal, and subcontract qualification B X X X Contractor’s Request for Review/Approval of Work Commencement/ Resumption, Request for Review/Approval of Review of Construction Organization Plan, Request for Review/Approval of Subcontract qualification 2 Delivery and Inspection of Ining Rebars, Steel sleeves for mechanical connection of rebar, etc. Check material exwork quality proofing document and test report for the pleteness。 Material Warranty document。 Request for inspection of xxxxxx. 3 Foundation Pit Inspection Conform to design and Code requirement A X X X X Compactness test record, work coverup record, foundation pitch inspection record, and xxxxxx inspection record 4 Plane Setting Out Axial line position, elevation of bottom formplate。 foundation pitch inspection record。 Rebar connecting method, location, quantity, and percentage of connecting area etc.。 Type, specification, quantity, spacing of hoop and lateral reinforcement。 Rigidity and stability should meet the requirement. Review contractor’s construction proposal B X X X Form of Request for Review/Approval of Construction Organization Plan 9 Formplate Erection Per construction requirement, isolating agent should not contaminate rebar and concrete interface, no mortar leaking in the formplate joint, arch camber should follow design requirement, no miss of precast holes in formplate, installation deviation should meet code request. Visual inspection, ruler metering, level gauging or pull wire ruler inspection. C X X Construction inspection record (for general application) 10 Formplate acceptance inspection Per construction requirement, isolating agent should not contaminate rebar and concrete interface, no mortar leaking in the formplate joint, arch camber should follow design requirement, no miss of precast holes in formplate, installation deviation should meet code request. Visual inspection, ruler metering, level gauging or pull wire ruler inspection. B X X X Divisional/subdivisional work inspection record。 deviation of material for each weight meet engineering requirement. Material testing report and calculation sheet of total content of chloride and alkali。 raw material weighing. B X X X Application of concrete pour。 Total time period for shipping, pouring and time interval should not exceed the initial setting time of concrete。 Request for acceptance inspection of xxxxxx material 15 Formplate Removal Deforming strength meets the engineering and code requirement。 Acceptance record of solid concrete strength of subdivisional work of concrete struc