【正文】
re the Purase Contract was executed.解決合同糾紛方式如出現(xiàn)質(zhì)量問題和工延后問題按合同執(zhí)行或雙方協(xié)商解決。b. ange of Material: if Buyer need to ange the pourable material that Buyer has stipulated in the tender documents due to tenical issue, Buyer and Seller would discuss and determine to the adjustment of the Contract Price after verifying the price of the material in the market.材料變更:對(duì)于甲方在中認(rèn)定的澆注材料如因甲方技術(shù)原因需要變更經(jīng)核實(shí)材料價(jià)格后甲方與乙方協(xié)商對(duì)合同總價(jià)進(jìn)展變更和確認(rèn)。9. Contract price and adjustments 合同價(jià)款及調(diào)整:(1) Contract price: The contract price is FFP (Firm Fixed Price), include tender documents, tenical requirement, drawings, site inspection, risk premium, etc. The contract price will not be adjusted at settlement and during the whole project, if Buyer would not ange the design and sign site visa. Contract price will not be adjusted and neither party could ange it during contract execution. except the factor listed in Sub article 2.合同價(jià)款:合同價(jià)款采用固定合同總價(jià)的方式確定、技術(shù)要求、圖紙、現(xiàn)場(chǎng)考察、風(fēng)險(xiǎn)費(fèi)等等全部包干甲方不提出設(shè)計(jì)變更現(xiàn)場(chǎng)簽證結(jié)算時(shí)合同價(jià)款不予調(diào)整。(4) In case of the site construction in Iran, Buyer will be responsible for visa, roundtrip fares and traveling expense, food and acmodation, and 30 US Dollar daily subsidies for ea of Seller’s construction personnel on Iran Site. All of the cost will be paid by T/T within 10 working days after the construction pleted and Buyer received related bills provided by Seller and accepted these bills..假設(shè)需乙方前往伊朗工程現(xiàn)場(chǎng)施工甲方負(fù)責(zé)乙方施工人員的簽證、往返車費(fèi)、食宿并補(bǔ)助乙方每人30美金/天。6. Standard and method of acceptance inspection: Subject to the requirement in the Attaed Tenical Agreement.驗(yàn)收、: 按照技術(shù)協(xié)議的要求進(jìn)展驗(yàn)收。(4) The start time of the construction shall be subject to the order to mence by Buyer. Seller shall unconditionally follow the overall project sedule of Buyer. Buyer shall be entitled to evaluate and adjust Seller’s construction plan