freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

預(yù)應(yīng)力簡支t梁(20m)優(yōu)秀畢業(yè)設(shè)計(jì)計(jì)算書(文件)

2025-07-10 12:45 上一頁面

下一頁面
 

【正文】             式中:——局部受壓面積上的局部壓力設(shè)計(jì)值,本設(shè)計(jì)中,每束預(yù)應(yīng)力筋的截面積為,張拉控制應(yīng)力,則;——張拉錨固時(shí)混凝土軸心抗壓強(qiáng)度設(shè)計(jì)值,當(dāng)混凝土強(qiáng)度達(dá)到設(shè)計(jì)強(qiáng)度的90%C40=C35,查《公預(yù)規(guī)》; ——混凝土局部承壓修正系數(shù),混凝土強(qiáng)度等級為C50及以下時(shí),本設(shè)計(jì)預(yù)應(yīng)力張拉時(shí)混凝土強(qiáng)度等級為C35, ;   ——混凝土局部承壓強(qiáng)度提高系數(shù);   ——局部受壓時(shí)的計(jì)算底面積,按《公預(yù)規(guī)》; ,——混凝土局部受壓面積,當(dāng)局部受壓有孔洞時(shí),為扣除孔洞后的面積,為不扣除孔洞的面積;對于具有喇叭管并與墊板連成整體的錨具,可取墊板面積扣除喇叭管尾端內(nèi)孔面積。則:      C40混凝土。由《公預(yù)規(guī)》:已知:; ; 滿足要求。由橋規(guī)可知=,=。根據(jù)公預(yù)規(guī),板內(nèi)應(yīng)設(shè)置垂直于主鋼筋的分布鋼筋,直徑不應(yīng)小于8mm,間距不應(yīng)小于200mm。 跨中橫隔梁的受載圖示縱向一列輪重對中橫隔梁的計(jì)算荷載為:汽車荷載(2)繪制中橫隔梁的內(nèi)力影響線在上面已經(jīng)算得①號主梁和②號主梁的橫向影響線豎坐標(biāo)值為:;①繪制彎矩影響線P=1作用在①號梁軸上時(shí): P=1作用在②號梁軸上時(shí): P=1作用在③號梁軸上時(shí):此三個(gè)豎標(biāo)值和已知影響線折點(diǎn)位置(即所計(jì)算截面的位置)。解方程,得到:,由于太小,則取。 橫梁正截面含筋率:均大于《公預(yù)規(guī)》%。板式橡膠支座,+2,設(shè)計(jì)荷載為公路—Ⅱ級,無人群荷載?;钶d的布置要使各種效應(yīng)組合為橋上最不利情況,求出支點(diǎn)最大反力作為蓋梁的活載。當(dāng)集中荷載作用在蓋梁中線時(shí)為最為不利(4)汽車沖擊力(5)汽車制動(dòng)力汽車制動(dòng)力是汽車在橋上剎車時(shí)為克服其慣性力而在車輪與路面之間發(fā)生滑動(dòng)摩擦力。(7)支座摩阻力相鄰兩孔跨徑相等,由溫度產(chǎn)生的支座摩阻力可相互抵消,故不考慮支座摩阻力影響。橋臺的蓋梁計(jì)算,一般可不考慮背墻與蓋梁共同受力,此時(shí)背墻僅起擋土墻作用。在配筋時(shí),還應(yīng)計(jì)算各控制界面扭矩所需要的箍筋及縱向鋼筋。由《公預(yù)規(guī)》。④縱向和橫向風(fēng)力:由于風(fēng)力相對于樁的影響非常小,可不予考慮。對于混凝土護(hù)壁的大直徑挖孔樁,計(jì)算單樁豎向承載力時(shí),其設(shè)計(jì)樁徑取護(hù)壁外直徑。 ①樁身彎距          式中無綱量系數(shù),可由表格查得。樁的換算面積: 樁的換算截面模量為:為樁的計(jì)算長度,當(dāng)時(shí),取。經(jīng)試算,當(dāng)時(shí),從表中查得A=,B=,C=,D=。漿砌塊石 整體重力式U型橋臺。 重力式橋臺的計(jì)算包括橋臺的截面強(qiáng)度驗(yàn)算、整體穩(wěn)定性驗(yàn)算、基底應(yīng)力和偏心距驗(yàn)算等。 ⑤縱向和橫向風(fēng)力:由于風(fēng)力相對于樁的影響非常小,也可不考慮。滿足要求。滿足要求。 基底偏心距驗(yàn)算為了使恒載基底應(yīng)力分布比較均勻,防止基底最大拉壓應(yīng)力與最小壓應(yīng)力相差過大,導(dǎo)致基底產(chǎn)生不均勻沉陷和影響橋墩的正常使用,在設(shè)計(jì)時(shí),應(yīng)對基底合力偏心距加以限制,在基礎(chǔ)縱向和橫向,其計(jì)算的荷載偏心距應(yīng)滿足規(guī)范要求,由《橋梁工程》表5—2—1可知。而對路面使用壽命影響最嚴(yán)重的當(dāng)屬縱向裂縫。2產(chǎn)生縱向裂縫的原因水泥混凝土路面在運(yùn)營過程中發(fā)生縱向開裂的原因是多方面的但是其主要原因是強(qiáng)度問題。路床的基礎(chǔ)可分為兩類,一類是零填或挖方段,路床直接座落在天然土層上;另一種是填方路段,路床座落在路堤上。(2)半填半挖及舊路改建路基半填半挖及舊路改建的路在新建的路在新填的一側(cè)與挖方七舊路基一側(cè)的接茬處,如果處理不好,往往在此處出現(xiàn)縱向裂縫。就普通土而言,天然狀態(tài)下的土的干密度只有最大干密度的80%左右。水泥混凝土路面板強(qiáng)度低主要有兩個(gè)方面的原因,一是混凝土強(qiáng)度達(dá)不到設(shè)計(jì)值;二是由于施工攤鋪的原因而使混凝土板強(qiáng)度達(dá)不到設(shè)計(jì)值。二是在拌和時(shí)計(jì)量不準(zhǔn)改變了混凝土的設(shè)計(jì)配合比。用振搗棒插點(diǎn)式振搗和平板振搗器振搗,振搗的點(diǎn)位和振搗時(shí)間完全由人來控制,在施工的外界環(huán)境和操作手人為等因素的影響下,很難做到布點(diǎn)均勻,振搗時(shí)間適度。一旦裂縫出現(xiàn),則在裂縫的兩端就會發(fā)生應(yīng)力集中現(xiàn)象,所以,裂縫就很快向兩端延伸加長,同時(shí),縫寬也逐漸增加。(1)填方路堤在填方路堤施工時(shí),必須按規(guī)范和設(shè)計(jì)要求分層填筑,分層碾壓,壓實(shí)度必須達(dá)到設(shè)計(jì)要求。(3)半填半挖路段半填半挖及舊路加寬路基施工,心須認(rèn)真處理填方部分與舊路基或原山坡的接茬,在山坡上或舊路基邊坡上從填方坡腳向上挖成向內(nèi)傾斜的臺階。振動(dòng)棒是在攤鋪寬度內(nèi)等距離均勻布置,其振幅、頻率和功率都是可調(diào)的,克服了人工攤鋪不均勻的缺點(diǎn)。各種原材料的各項(xiàng)技術(shù)指標(biāo)都必須滿足設(shè)計(jì)和有關(guān)規(guī)范要求。4裂縫的處理水泥混凝土路面縱向裂縫的處理可采用局部處理和全部處理的辦法。如果是由于基礎(chǔ)開裂 而引起的路面開裂,則應(yīng)在新澆混凝土板的全寬范圍內(nèi)加設(shè)單層或雙層鋼筋網(wǎng),鋼筋網(wǎng)的規(guī)格一般用A10的鋼筋制成20*20cm間距即可。槽底要清洗干凈,在槽底鋪設(shè)用A10mm鋼筋綁扎的10*10cm的鋼筋網(wǎng),然后澆筑與原路面混凝土強(qiáng)度相等的小石子混凝土,保濕養(yǎng)生28天后開放交通。 As a result of this crack is through the thickness, so the rain will be along the crack under the Baptist the grass roots and the embankment, resulting in decreased strength of the foundation, and finally lead to the destruction of the entire road. 2Have vertical cracks Cement concrete pavement occurs during the operation of the vertical cracks are many reasons but the main reason is the question of intensity. Based on the longitudinal surface cracks caused by cracking The basis of the road is the road bed. Road, the road bed under the dead load generated, but also came under pressure from street traffic load. The basis of strength in the load, the inevitable occurrence of longitudinal cracking, if the roadbed vertical cracking occurred, it will reflex to the road up. The basis of the road bed can be divided into two categories is zero filling or excavation above the road bed is located directly on the natural soil。 and then manually drag the horizontal vibration plate vibration device, and finally by the artificial drag of the surface vibration of beam vibration. Interpolation points with rods vibrated vibrated and tabletstyle device vibration vibration, vibration and the vibration of the point of time solely by the people to control the external environment during the construction and manmade factors such as operator under the influence, it is difficult to do points to even moderate vibration time. In this way, the cement concrete slab can not be too dense to even. As we all know, the degree of paction 。 the stability of poor letter of appointment. Therefore, dead load on the road and the role of motor vehicles under the dynamic load, basic first vertical cracks. Cement Concrete Pavement strength Cement Concrete Pavement can not be sufficient if the arrival of the ability to engage in bending, then the role of load in the car, the inevitable destruction of produce, such as longitudinal cracking. Cement Concrete Pavement with low intensity, there are two major reasons, one degree less than concrete Taiwan design value。Cement Concrete Pavement On The Prevention Of Vertical Cracks 1 Preface Cement concrete pavement cracks a variety of forms. There is prima facie net crack, horizontal cracks, vertical cracks and so on. Life on the road most affected among the longitudinal cracks. Such cracks are usually the central line of the lane, in the event that a few or dozens of pieces of concrete slab for cracking, and cracks throughout the thickness。但采用這種方法處理,費(fèi)用較大。這種處理方法是將已開裂的混凝土板全部清除,保留橫向連接鋼筋。其次是混凝土拌和時(shí)控制施工配合比,各種材料計(jì)量必須準(zhǔn)確。,保證混凝土質(zhì)量加強(qiáng)施工管理是確保混凝土質(zhì)量的重要途徑之一。采用水泥混凝土路攤鋪機(jī)進(jìn)行施工是提高混凝土板的均勻性、密性、保證其質(zhì)量的最有利辦法之一。(2)零填及挖方路段在零填及挖方路段的基礎(chǔ)處理時(shí),如果路槽范圍及路槽以下是普通土或松土?xí)r,處理深度不應(yīng)僅限于上路槽,對于下路槽(路槽頂面以下30~80cm范圍)也必須處理,其壓實(shí)度應(yīng)與上路槽相同。3縱向裂縫的預(yù)防措施水泥混凝土路面縱向裂縫 的預(yù)防必須從治本開始。眾所周知,混凝土的密實(shí)程度 直接影響其強(qiáng)度。兩種施工方法的本提上的差異是振搗工藝,而影響混凝土板強(qiáng)度的主要原因是攤鋪中的振搗工藝。一是原材料質(zhì)量不合格。所以在路面恒載和汽車動(dòng)載的作用下,基礎(chǔ)首先出現(xiàn)了縱向裂縫。(3)零填及挖方路基這類路基如果出現(xiàn)縱向開裂 主要是基礎(chǔ)處理不當(dāng)或不徹底,基礎(chǔ)強(qiáng)度達(dá)不到應(yīng)有的承開能力。(1)填方路堤縱向開裂的主要原因是路基的填筑高度從原地面至路床頂面的距離大于80cm這類路基的路基壓實(shí)度達(dá)不到設(shè)計(jì)或規(guī)范的要求。路床承受著路面所產(chǎn)生的恒載,同時(shí)還承受著由路面?zhèn)鱽淼男熊嚭奢d。水泥混凝土路面縱向裂縫是比較嚴(yán)重的一種病害。, 參考文獻(xiàn):[1]GB/JTG D60-2004,公路橋涵設(shè)計(jì)通用規(guī)范[S].北京:人民交通出版社,2004.[2]GB/JTG D62-2004,公路鋼筋混凝土及預(yù)應(yīng)力混凝土橋梁設(shè)計(jì)規(guī)范[S].北京:人民交通出版社,2004.[3]GB/JTG D63-2007,公路橋涵地基與基礎(chǔ)設(shè)計(jì)規(guī)范[S].北京:人民交通出版社,2007.[4]趙明華.基礎(chǔ)工程[M].北京:高等教育出版社,2003.[5]白寶玉.橋梁工程[M].北京:高等教育出版社,2005.[6]萬德臣.路基路面工程[M].北京:高等教育出版社,2005.[7]趙樹德.土力學(xué)[M].北京:高等教育出版社,2001.[8]朱伯欽.結(jié)構(gòu)力學(xué)[M].上海:同濟(jì)大學(xué)出版社,2004.[9]寧仁岐.土木工程施工[M].北京:中國建筑工業(yè)出版社,2006.[10]范立礎(chǔ).預(yù)應(yīng)力混凝土連續(xù)梁設(shè)計(jì)[M].北京:人民交通出版社,2000.[11]陳忠延.土木工程專業(yè)畢業(yè)設(shè)計(jì)指南[M].北京:中國水利水電出版社,2000.[12]林元培.斜拉橋[M].北京:人民交通出版社,2000.[13]沈蒲生.混凝土結(jié)構(gòu)設(shè)計(jì)原理[M].北京:高等教育出版社,200
點(diǎn)擊復(fù)制文檔內(nèi)容
語文相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1