【正文】
project schedules can result in A、 an extended project duration. B、 reduced slack. C、 increased risk of being late. D、 all of the above E、 (B) and (C) above 4. 題目: When the minimum slack heuristic is used, resources would be assigned to A、 activities requiring the most resources first. B、 the activities with the smallest duration. C、 critical activities. D、 all of the above E、 none of the above 5. 題目: Splitting or multitasking should be A、 avoided at all costs. B、 used freely to resolve resource allocation problems. C、 used when the activities do not involve large startup costs. D、 used when the activities do not involve large shutdown costs. E、 (D) and (C) above 二、 判斷題 一共 5 題 每小 題 10 分 1. 題目: Failure to schedule project resources increases the risk of understating the project pletion time. 正確 錯(cuò)誤 2. 題目: Resourceconstrained and timeconstrained projects utilize slack (float) to set project schedules. 正確 錯(cuò)誤 3. 題目: Scheduling resources using heuristic rules will provide you with an optimal project resource schedule. 正確 錯(cuò)誤 4. 題目: Outsourcing project work is a mon method for resolving multiproject resource problems. 正確 錯(cuò)誤 5. 題目: A project manager should always assign his best workers to the most difficult tasks. 正確 錯(cuò)誤 Chapter 9 一、 單選題 一共 5 題 每小題 10 分 1. 題目: In time/cost analysis you begin the process by pressing the activity on the critical path A、 with the lowest direct cost per unit of time. B、 with the lowest indirect cost per unit of time. C、 that allows for the most pression of time. D、 all of the above E、 none of the above 2. 題目: Brooks39。s and 7039。s. 正確 錯(cuò)誤 2. 題目: SWOT analysis is an examination of the internal operations of the firm. 正確 錯(cuò)誤 3. 題目: Financial measures are recognized as the best method for prioritizing and selecting projects. 正確 錯(cuò)誤 4. 題目: Cause and effect diagrams are useful as instruments to demonstrate a need for a project priority system. 正確 錯(cuò)誤 5. 題目: Project priority schemes should include risk analysis so the project portfolio is balanced with high and low risk projects. 正確 錯(cuò)誤 Chapter 3 一、 單選題 一共 5 題 每小題 10 分 1. 題目: A disadvantage of a matrix structure is that A、 it lends itself to conflict and petition for scarce resources. B、 decision making can bee bogged down. C、 it can be very stressful working with more than one boss. D、 (A) and (C) above E、 all of the above 2. 題目: An advantage of the dedicated project team is A、 a high level of cross functional integration. B、 a concentrated project focus. C、 a tendency for projects to get done quickly. D、 (B) and (A) above E、 all of the above 3. 題目: The metaphor that is used to describe the relationship between anizational culture and project management is A、 culture is the river and the project is the boat. B、 culture is the country and the project is the city. C、 culture is the drummer and the project is the guitarist. D、 culture is the tree and the project is a leaf. E、 culture is the engine and the project is the headlights. 4. 題目: An anization39。 law states that A、 it39。s performance could involve collecting information from A、 team members B、 functional managers C、 the director of project management D、 customers E、 all of the above 標(biāo)準(zhǔn)答案: E、 得分: 10 二、 判斷題 一共 5 題 每小題 10 分 1. 題目: Research points to poor project definition as a major barrier to project success. 標(biāo)準(zhǔn)答案: 正確 得分: 10 2. 題目: When conducting a performance review a project manager should draw parisons to other project members. 標(biāo)準(zhǔn)答案: 錯(cuò)誤 得分: 10 3. 題目: It is a good idea to bine performance reviews with pay reviews. 標(biāo)準(zhǔn)答案: 錯(cuò)誤 得分: 0 4. 題目: The major goal of the audit report is to improve the way future projects are managed. 標(biāo)準(zhǔn)答案: 正確 得分: 10 5. 題目: Project audits should be random to ensure no one can predict when the audit will occur. 標(biāo)準(zhǔn)答案: 錯(cuò)誤 得分: 10 。s better to crash late rather than early on a project. E、 none of the above 3. 題目: In order to determine the optimum costtime point for a work one needs A、 direct costs for crashing the work. B、 indirect costs for the project. C、 both direct and indirect costs. D、 contingency costs. E、 (A), (B), and (D) 4. 題目: Which of the following is an example of indirect costs of a project? A、 administrative costs B、 the project manager39。s celebration E、 retrofitting an oil refinery 標(biāo)準(zhǔn)答案: D、 得分: 10 2. 題目: Which factor has the greatest impact on the project if defined poorly? A、 scope B、 work breakdown element C、 work package D、 activity E、 cost account 標(biāo)準(zhǔn)答案: A、 得分: 10 3. 題目: The WBS A、 is the database for planning, scheduling, and monitoring the project. B、 provides development of progress reports for different levels of management. C、 uses c