【正文】
of the goods are found, or the specifications and/or quantity are not in conformity with the stipulations in this Contract, except when the responsibilities lies with Insurance Company or Shipping Company, the Buyer shall, within _____ days after arrival of the goods at the port of destination, claim against the Seller, or reject the goods according to the inspection certificate issued by CCIB. In case of damage of the goods incurred due to the design or manufacture defects and/or in case the quality and performance are not in conformity with the Contract, the Buyer shall, during the guarantee period, request CCIB to make a survey.19. 索賠(Claim):買方憑其委托的檢驗機構(gòu)出具的檢驗證明書向賣方提出索賠(包括換貨),由此引起的全部費用應(yīng)由賣方負(fù)擔(dān)。The Seller shall guarantee that the modity must be in conformity with the quatity, specifications and quantity specified in this Contract and Letter of Quality Guarantee. The guarantee period shall be ______ months after the arrival of the goods at the port of destination, and during the period the Seller shall be responsible for the damage due to the defects in designing and manufacturing of the manufacturer.18. 檢驗(Inspection) (以下兩項任選一項):(1)賣方須在裝運前__日委托______檢驗機構(gòu)對本合同之貨物進行檢驗并出具檢驗證書,貨到目的港后,由買方委托________檢驗機構(gòu)進行檢驗。在CFR術(shù)語下,賣方應(yīng)在裝船前2天以____方式通知買方合同號、品名、發(fā)票價值及開船日期,以便買方安排保險。在貨物越過船弦并脫離吊鉤以前一切費用和風(fēng)險由賣方負(fù)擔(dān)。(2) 標(biāo)有合同編號、信用證號(信用證支付條件下)及裝運嘜頭的商業(yè)發(fā)票一式__份;Signed mercial invoice in ______copies indicating Contract No., L/C No. (Terms of L/C) and shipping marks。Documents against payment: After shipment, the Seller shall draw a sight bill of exchange on the Buyer and deliver the documents through Sellers bank and ______ Bank to the Buyer against payment, D/P. The Buyer shall effect the payment immediately upon the first presentation of the bill(s) of exchange.(3) 承兌交單:貨物發(fā)運后,賣方出具以買方為付款人的付款跟單匯票,付款期限為____后__日,按即期承兌交單(D/A__日)方式,通過賣方銀行及______銀行,經(jīng)買方承兌后,向買方轉(zhuǎn)交單證,買方在匯票期限到期時支付貨款。賣方應(yīng)在每個包裝箱上用不褪色的顏色標(biāo)明尺碼、包裝箱號碼、毛重、凈重及“此端向上”、“防潮”、“小心輕放”等標(biāo)記。The packing of the goods shall be preventive from dampness, rust, moisture, erosion and shock, and shall be suitable for ocean transportation/ multiple transportation. The Seller shall be liable for any damage and loss of the goods attributable to the inadequate or improper packing. The measurement, gross weight, net weight and the cautions such as Do not stack up side down, Keep away from moisture, Handle with care shall be stenciled on the surface of each package with fadeless pigment.8. 嘜頭(Shipping Marks):9. 裝運期限(Time of Shipment):