freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

交通土建工程-云南省某一級公路綜合設(shè)計(已修改)

2024-12-22 10:48 本頁面
 

【正文】 云南省某一級公路綜合設(shè)計 設(shè)計說明書 長沙理工大學(xué) 07級自考交通土建工程畢業(yè)設(shè)計 編制: 審核: 1 全套 CAD 圖紙 +計算書 +設(shè)計說明書,聯(lián)系153893706(完整優(yōu)秀成績論文) 摘 要 云南省某一級公路綜合設(shè)計 [摘要 ]: 本次設(shè)計是 一級 公路的初步設(shè)計,其主要包括路線,路基及排水設(shè)計,路面及排水設(shè)計 , 小橋涵洞的設(shè)計 以及交通工 程及沿線設(shè)施的設(shè)計 。首先在等高線地形圖上初步擬定路線方案,定出導(dǎo)線并確定線形指標,計算中樁坐標,繪制平曲圖;縱斷面設(shè)計,依據(jù)各中樁高程反復(fù)試坡,繪制縱斷面圖。設(shè)計時要注意縱曲線與平曲線的搭配。路基橫斷面設(shè)計,測出路基橫向一定范圍內(nèi)的地面高程,利用標準模板對橫斷面進行“帶帽子”,并據(jù)此進行土石方的計算。排水設(shè)計依據(jù)排水設(shè)計規(guī)范和相關(guān)地質(zhì)情況進行設(shè)計。同時進行路面結(jié)構(gòu)層的設(shè)計,路面結(jié)構(gòu)設(shè)計中包括瀝青混凝土路面、水泥混凝土路面兩種路面設(shè)計,瀝青路面設(shè)計以彈性層狀體系理論為基礎(chǔ)。首先將已知交通量轉(zhuǎn)換為標準軸載計算累 計當(dāng)量次,并求出設(shè)計彎沉值。利用已確定的材料的參數(shù)以及設(shè)計彎沉值初步擬定各方案中的路面結(jié)構(gòu)層厚度,并對各結(jié)構(gòu)層進行拉應(yīng)力驗算,面層還要進行抗剪強度驗算,水泥混凝土路面設(shè)計以彈性地基板體系和理論為基礎(chǔ)。依據(jù)換算后厚度的標準軸載次數(shù)可確定公路等級,設(shè)計年限及累計作用次數(shù),初擬幾種面板尺寸及基層底基層結(jié)構(gòu),通過對初擬方案的荷載疲勞應(yīng)力及溫度應(yīng)力驗算,經(jīng)反復(fù)調(diào)整得到最終設(shè)計成果,確定面板尺寸后再對面板進行接縫及配筋設(shè)計。方案確定后應(yīng)以經(jīng)濟、施工難易程度等多方面綜合比較。從而得出各路面方案中最優(yōu)方案,進行排水及施工設(shè) 計。 [關(guān)鍵詞 ]:路線;路基;路面;排水 . ABSTRACT The preliminary design of freeway in Yunnan Province [Abstract]: This design is the highway preliminary design, it mainly includes theroute, the roadbed and the draining water design, the road surface and the draining water design as well as the bridge culvert design. Firstinitially draws up the route plan in the surface contour map, decideson the wire and the determination linear target, in the putationthe pile coordinates, draws up the even tune chart。 vertical section thedesign, rests on each center pile elevation repeatedly to try theslope, the plan profile diagram. When design must pay attention to thevertical curve and plane curve matching. The roadbed cross sectiondesign, determines in the roadbed crosswise certain scope the groundelevation, the use standard template carries on the belt hat to thecross section, and according to the above carries on the cubic meterof earth and stone the putation. The draining water design carries on the design based on the drainingwater design standard and the correlation geology situation. Simultaneously carries on the pavement structure level the design, inthe pavement structure design including the asphalt concrete roadsurface, the cement concrete road surface two kind of pavementdesigns, the bituminous pavement design take the elastic layeredsystem theory as the foundation. First transforms the known volume of traffic for the standard axleload putation accumulates equivalent, and extracts the design deflection value. Using already the material parameter as well as thedesign deflection value value which determined initially draws up in variousplans pavement structure level thickness, and carries on the tensilestress to various structures level checking putations, the surface layer also mustcarry on the shearing strength checking putations, the cement concrete pavementdesign take the elastic foundation plate system and the theory as afoundation. After the basis conversion thickness standard axle loadnumber of times may determine the highway classification, the designfixed number of years and the accumulation function number of times,initially draws up several kind of kneading boards sizes and the basicunit under basicunit structure, through to initially draws up the plan theload weary stress and the temperature stress checking putations, after repeatedlyadjusts obtains the finally design achievement, after the definitekneading board size the counter plate carries on the joint again andmatches the muscle design. After the plan determination should by theeconomical, the construction difficulty degree and so on the varioussynthesis parison. Thus obtains in various road surfaces plan themost superior plan, carries on draining water and the executiveproject. [Key word]: Route。 Roadbed。 Road surface。 Drainin gwater. 云南省某一級公路綜合設(shè)計 設(shè)計說明書 長沙理工大學(xué) 07級自考交通土建工程畢業(yè)設(shè)計 編制: 審核: 2 目 錄 序號 圖表名稱 圖號 (編號 ) 頁數(shù) 備 注 序號 圖表名稱 圖號 (編號 ) 頁數(shù) 備 注 中英文摘要 1 15 水泥路面結(jié)構(gòu)設(shè)計圖 S22 4 目 錄 1 16 水泥路面排水設(shè)計圖 S23 1 第一篇 總說明書 1 17 瀝青路面工程費用計算 4 1 設(shè)計總說明書 4 18 水泥路面工程費用計算 4 2 道路中軸線圖 S1 1 第 四 篇 橋梁 、涵洞 1 3 道路縱斷面縮圖 S2 1 1 橋梁、涵洞設(shè)計說明 1 第 二 篇 路線 1 2 橋型布置圖 S24 1 1 路線設(shè)計說明 2 3 涵洞布置圖 S25 2 2 路線 方案 設(shè)計 圖 S3 4 第五篇 交通工程及沿線設(shè)施 3 路線平面圖 S4 4 1 交通工程及沿線設(shè)施設(shè)計說明 1 4 路線縱斷面圖 S5 2 2 標線設(shè)計圖 S26 1 5 直線、曲線及轉(zhuǎn)角表 S6 1 3 標志版面布 設(shè)圖 S27 2 6 縱坡、豎曲線表 S7 1 4 護柱設(shè)計圖 S28 1 7 逐樁坐標表 S8 1 5 刺鐵絲隔離柵設(shè)計圖 S29 1 8 公路用地圖 S9 4 6 安全設(shè)施設(shè)置一覽表 S30 1 第三篇 路基 、路面 及排水 1 第六篇 總結(jié)、參考文獻 1 路基及排水設(shè)計說明 1 1 設(shè)計總結(jié) 2 路基標準橫斷面圖 S10 3 2 參考文獻 3 路基橫斷面設(shè)計圖 S11 5 4 路基設(shè)計 表 S12 3 5 路基土石方數(shù)量表 S13 1 6 排水 系統(tǒng)布置 圖 S14 4 7 排水 一般 結(jié)構(gòu) 構(gòu)造圖 S15 1 8 邊溝排水溝設(shè)計表 S16 1 9 路基防護工程 設(shè)計 圖 S17 5 10 路面及排水設(shè)計說明 18 11 瀝青混凝土路面標準橫斷面圖 S18 1 12 水泥混凝土路面標準橫斷面圖 S19 1 13 瀝青路面結(jié)構(gòu)設(shè)計圖 S20 2 14 瀝青路面排水設(shè)計圖 S21 1 云南省某一級公路綜合設(shè)計 設(shè)計說明書 長沙理工大學(xué) 07級自考交通土建工程畢業(yè)設(shè)計 編制: 審核: 3 第 一 篇 總說明書 云南省某一級公路綜合設(shè)計 設(shè)計說明書 長沙理工大學(xué) 07級自考交通土建工程畢業(yè)設(shè)計 編制: 審核: 4
點擊復(fù)制文檔內(nèi)容
研究報告相關(guān)推薦
文庫吧 www.dybbs8.com
公安備案圖鄂ICP備17016276號-1