【正文】
城鄉(xiāng)一體化安置小區(qū)建設(shè)工程可行性研究報(bào)告城鄉(xiāng)一體化安置小區(qū)建設(shè)工程可行性研究報(bào)告cover for outdoor use, where the rain and flooding of the electrical equipment shall be necessary for drying insulation tested before they can be used. 4, the distribution box must be strong, full, close and lock, door painted red danger signs, box no debris and numbered. 5, landed the distribution box should be flat on the ground to prevent flooding, soil, no debris piled up near the distribution box. 6, laying construction site lighting circuits apart from the protection line, separate or pipe laying, Office lighting set switch control, work shed, ground tap control, light bulbs from the ground . 7, where the use or operation of electric machinery and professional and technical education must be safe, learn about electrical knowledge, know how its performance, correct methods of operation. 8, must be healthy, sane, responsible workers engaged in electrical work, operating machinery and equipment must have a certificate. 9, before the use of electrical equipment, electrical wiring running correctly passed to the operations personnel. 10, electrical personnel should be required to wear insulating footwear and protective equipment, correct use of insulated protective equipment or appliances. 11, end, or work stoppage for more than an hour, to switch box power off, lock, protect power cord and tool. 12, onduty electrician certificates. (C) the fire safeguard measures 1, construction site must adhere to the putting prevention first and bining prevention approach, careful followup of the People39。s Republic of China Fire Services Ordinance, step by step implementation of the responsibility system for fire protection, using a variety目 錄第1章 概述 1 1 2 2第2章 項(xiàng)目建設(shè)背景和必要性分析 3 3**市政府決定全面推進(jìn)城鄉(xiāng)一體化建設(shè) 3**城市建設(shè)背景 3**全力加快**開(kāi)發(fā)和建設(shè) 4 5,實(shí)現(xiàn)產(chǎn)業(yè)的轉(zhuǎn)型升級(jí)的需要 加快城市化進(jìn)程的需要 5 6第3章 項(xiàng)目區(qū)域分析 8第4章 項(xiàng)目規(guī)劃建筑設(shè)計(jì) 11 11 12 12 12 13 14第5章 項(xiàng)目實(shí)施進(jìn)度計(jì)劃 16第6章 投資估算和資金籌措 17 17 17 18第7章 社會(huì)效益分析 1增加就業(yè) 19 19 20第8章 結(jié)論 21附件1:**安置小區(qū)**工程估算表 22附件2:**安置小區(qū)**總平面圖 231城鄉(xiāng)一體化安置小區(qū)建設(shè)工程可行性研究報(bào)告第1章 概述項(xiàng)目名稱(chēng):建設(shè)單位:?jiǎn)挝坏刂罚喉?xiàng)目聯(lián)系人:電 話:傳 真:電子信箱:郵政編碼: 本項(xiàng)目以**為建設(shè)主體,負(fù)責(zé)建設(shè)農(nóng)民安置房用以安置當(dāng)?shù)乇徊疬w居民。(1)基本情況**為新成立的有限公司,**年**月**日成立,目前公司注冊(cè)資金**億元,實(shí)收資本**萬(wàn)元。(2)公