【正文】
.................................................................... 14 引水設(shè)備 ...................................................................................................................... 14 計量設(shè)備 ...................................................................................................................... 14 起重設(shè)備 ...................................................................................................................... 15 排水設(shè)備 ...................................................................................................................... 15 12 泵房的建筑高度和平面尺寸的確定 .......................................................................................... 15 13 設(shè)計二級泵站平面圖及剖面圖 ................................................................................................ 16 主要參考文獻(xiàn) .............................................................................................................................. 18 結(jié) 論 ..................................................................................................................................... 17 附件一 ......................................................................................................................................... 18 附件二 ......................................................................................................................................... 20 附件三 ......................................................................................................................................... 21 送水泵房設(shè)計 2 某給水泵房設(shè)計 摘 要 :水泵選型是泵房工程設(shè)計中的重要問題,選型合理與 否,直接關(guān)系到泵站工程的投資、建成后的運(yùn)行費(fèi)用和供水安全。水泵選型必須根據(jù)工程具體情況,確定合適的水泵型號和臺數(shù)。選型的基本依據(jù)是泵站工程規(guī)劃中所確定的設(shè)計參數(shù),即所在泵站的流量、揚(yáng)程及其變化規(guī)律。本文對給水泵站的設(shè)計參數(shù)確定及水泵選型問題進(jìn)行了討論,提出了設(shè)計參數(shù)的確定及水泵選型的方法。 關(guān) 鍵 詞 :給水泵房 ; 流量 ; 揚(yáng)程 ; 水泵選型 A water supply pump station design Abstranct:Pump selection is an important issue in the design of pumping station project, the selection is reasonable or not is directly related to the pumping station project investment, after the pletion of the running costs, and water safety. The pump selection must be based on project specific circumstances, to determine the appropriate pump type and number of units. The selection is based on the design parameters determined by the pumping station project planning, that is where the pump station flow, head, and its variation. Determine the design parameters of the pump station and pump selection problems are discussed, the determination of design parameters and pump selection. Keyword: Pump station。 flow。 head。 pump selection 1 基本設(shè)計資料 設(shè)計一供水能力為 萬 m3/d 的取水泵 房 , 原水水質(zhì)符合飲用水規(guī)定。 給水管網(wǎng)設(shè)計的部分成果如下: 根據(jù)用水曲線確定二泵站的工作制度,分兩級工作。 第一級,從 6: 00到 20: 00,每小時占全天用水量的 %。 送水泵房設(shè)計 3 第二級,從 20: 00 到 6: 00,每小時占全天用水量的 %。 城市給水管網(wǎng)的設(shè)計最不利點的地面標(biāo)高為 133m,建筑層數(shù) 5 層,自由水壓為 24m。 給水管網(wǎng)平差得出的二泵站至最不利點的輸水管和配水管網(wǎng)的總水頭損失 。 消防流量 144 m3/h,消防時的總水 頭損失為 。 清水池所在地地面標(biāo)高為 125m,清水池最低水位在地面以下 4m。 城市的冰凍線 。 泵站所在地土壤良好,地下水位為 7m。 泵站具備雙電源條件 。 2 水泵機(jī)組的初步選擇 二級泵站的特點 : 二級泵站通常設(shè)在凈水廠內(nèi),經(jīng)水廠凈化后的水進(jìn)入清水池儲存,清水池中水經(jīng)管道自流入吸水井,水泵從吸水井吸水,經(jīng)加壓后送入城市輸配水管網(wǎng)。其工藝流程如:清水池 — 吸水井 — 送水泵站 — 輸配水管網(wǎng) — 用戶。 基本特點:泵站埋深較淺,通常建成地面式或半地面式,為了 適應(yīng)用戶水量、水質(zhì)的變化,需要設(shè)置多臺水泵機(jī)組,