【正文】
ystem is stopped and at rest the status of the valves will be as follows: 輸灰系統(tǒng)停運(yùn)或初始狀態(tài)時(shí),各閥門(mén)狀態(tài)如下: Control air 控制氣 Off 關(guān) Control air 控制氣 On 開(kāi) Control air 控制氣 On 開(kāi) Electrical power 電源 Off 關(guān) Electrical power 電源 Off 關(guān) Electrical power 電源 On 開(kāi) PLC mode PLC模式 Off 關(guān) PLC mode PLC模式 Off 關(guān) PLC mode PLC模式 Run 運(yùn)行 DensPhase MDPump Inlet Dome Valves MD 泵進(jìn)口圓頂閥 last position* 上一位置 closed 關(guān) closed 關(guān) DensPhase MDPump vent valves MD 泵排氣閥 last position* 上一位置 closed 關(guān) closed 關(guān) Inline Dome Valve 管路圓頂閥 last position 上一位置 Open 開(kāi) Open 開(kāi) Air Blend valve (PV14)混氣閥 Closed 關(guān) Closed 關(guān) Closed 關(guān) Fluidising air valve (PV15)流化空氣閥 Closed 關(guān) Closed 關(guān) Closed 關(guān) The DensPhase MDPumps should be empty and at zero pressure. MD 泵應(yīng)該為空,壓力為零。沒(méi)有控制空氣壓力時(shí),閥門(mén)不會(huì)密封。 The start / stop / purge switch at the HMI is set to “START” or “PURGE”. 主電控屏幕上的啟動(dòng) /停止 /吹掃開(kāi)關(guān)置于“啟動(dòng)”或“吹掃”位置。 Conveying pressure is barg (PT25). 輸送壓力 barg (PT25)。(詳見(jiàn)輸送管路控制一節(jié)) Space is available in the target reception silo (As defined in the section on conveying route control). 目標(biāo)終端灰?guī)炜捎?。(?jiàn)報(bào)警條件匯總) Client interlock is healthy (if available) 客戶(hù)連鎖正常(如果可用)。 Providing the above conditions are true a conveying cycle will be initiated and will proceed as follows: 如果上述條件滿(mǎn)足,輸送循環(huán)將啟動(dòng)并按如下步驟運(yùn)行: Step 1第一步 The master vessel inlet/vent Dome Valves will be opened by energising solenoid (EV01). The slave 1 inlet/vent Dome Valve open delay timer (0 second), the short fill timer (600 seconds), and cycle watchdog timer (945 seconds) will be started. Material will fall under gravity into the master DensPhase MDPump. 主泵進(jìn)口閥、排氣閥由相應(yīng)的電磁閥 (EV01)得電開(kāi)啟, 1號(hào)付泵進(jìn)口閥、排氣閥開(kāi)啟延遲定時(shí)器( 0秒)、短填充定時(shí)器( 600秒)、循環(huán)監(jiān)視定時(shí)器( 945秒)打開(kāi)。 Step 2第二步 CBM Project No/Issue: C06151/1 Date: January 2020 Section 2 Page 9 of 62 Sheet Rev No. 00 When the slave 1 inlet/vent Dome Valve open delay timer has expired the slave vessel 1 inlet/vent Dome Valves will be opened by energising the solenoid (EV01) and the slave 2 inlet/vent Dome Valve open delay timer (0 second) will be started. Material will fall under gravity into the slave 1 DensPhase MDPump. 當(dāng) 1號(hào)付泵進(jìn)口閥、排氣閥開(kāi)啟延遲定時(shí)器完成, 1號(hào)付泵進(jìn)口閥、排氣閥由電磁閥 (EV01)得電開(kāi)啟。物料在重力作用下落入 1號(hào)付 MD 泵 。出口泵進(jìn)口閥、排氣閥開(kāi)啟延遲定時(shí)器( 0秒)打開(kāi)。 Step 4第四步 When the outlet vessel inlet/vent Dome Valve open delay timer has expired the outlet vessel inlet/vent Dome Valves will be opened by energising the solenoid (EV01) and the inline Dome Valve close delay timer (1 second) will be started. Material will fall under gravity into the outlet vessel DensPhase MDPump. 當(dāng)出口泵進(jìn)口閥、排氣閥開(kāi)啟 延遲定時(shí)器完成,出口泵進(jìn)口閥、排氣閥由電磁閥 (EV01)得電開(kāi)啟,管路圓頂閥關(guān)閉延遲定時(shí)器( 1秒)打開(kāi)。 Step 5第五步 When the inline Dome Valve close delay timer has expired, the inline Dome Valve will be closed by energising solenoid (EV03). 當(dāng)管路圓頂閥關(guān)閉延遲定時(shí)器完成,管路圓頂閥由電磁閥 (EV03)得電關(guān)閉。 Step 6第六步 When the cycle start override button (HS01) on the HMI has been selected 當(dāng)在主電控盤(pán)上選擇了循環(huán)啟動(dòng)強(qiáng)制按鈕 (HS01) OR或 The short fill timer has expired 短填充定時(shí)器已到時(shí) OR 或 The minimum cycle period timer has expired and either “PURGE” has been selected or one or more of the DensPhase MDPump high level probes (LSH02) have been covered. 最小循環(huán)周期定時(shí)器到時(shí),同時(shí)“吹掃”按鈕被選擇或一個(gè)或多個(gè) MD 泵高料位計(jì) (LSH02)被覆蓋 The overfill timer ( seconds) will be started. 過(guò)量填充定時(shí)器( )將打開(kāi)。 Step 7第七步 When the overfill timer has expired all inlet Dome and Vent Valves will be closed and the Inline Dome Valve will be opened by deenergising solenoids (EV01) and (EV03) respectively. Simultaneously the minimum cycle period timer (475 seconds) will be reset and started. 當(dāng)過(guò)量填充定時(shí)器到時(shí),所有的進(jìn)口閥和排氣閥由電磁閥 (EV01)失電關(guān)閉,管路圓頂閥由電磁閥 (EV03)失電打開(kāi)。 Step 8第八步 When all of the inlet Dome and Vent Valves (PS01) and (PS05) have closed and sealed, the Inline Dome Valve has opened (ZSO03) and all conveying start offset timers have expired, the master vessel fluidising air valve and air blend valve will be opened by energising solenoid (EV15) and (EV14) respectively. Conveying air will be introduced in to the conveying line by piloting off from the master fluidising air. Simultaneously the Outlet vessel fluidisation delay timer (0 seconds) and this systems conveying start offset timer (20 seconds) will be started. 當(dāng)所有的進(jìn)口閥 (PS01)和排氣閥 (PS05)關(guān)閉并密封,管路圓頂閥 (ZSO03)已打開(kāi),所有的輸送啟動(dòng)偏移定時(shí)器已到時(shí),主泵流化空氣閥 (EV15)和混氣閥(EV14)分別由電磁閥得電打開(kāi)。同時(shí),出口泵流化延遲定時(shí)器( 0秒)和系統(tǒng)輸送啟動(dòng)偏移定時(shí)器( 20秒)打開(kāi)。 Step 9第九步 When the Outlet vessel fluidisation delay timer has expired the Outlet MDPump fluidising valve (PV15) will be opened by energising solenoid (EV15). Simultaneously the last Slave vessel fluidisation delay timer (0 seconds) will be started. 當(dāng)出口泵流化延 遲定時(shí)器到時(shí),出口泵流化閥 (PV15)由電磁閥 (EV15)得電打開(kāi)。 CBM Project No/Issue: C06151/1 Date: January 2020 Section 2 Page 12 of 62 Sheet Rev No. 00 Note: If the conveying cycle is in steps 8 to 13 inclusive and the conveying pressure rises to greater than barg (PT25), the air blend valve (PV14) and fluidising valves (PV15) will be closed. The fluidisation delay timers will be reset and the conveying cycle will restart from Step 8 once the pressure has fallen below the barg. 說(shuō)明:如果輸送循環(huán)進(jìn)行到第八步至第 13 步,輸送壓力 (PT25)上升至 以上,混氣閥 (PV14)和流化閥 (PV15)關(guān)閉。 Step 10第十步 When the last Slave vessel fluidisation delay timer has expired the last Slave MDPump fluidising valve (PV15) will be opened by energising solenoid (EV15). Simultaneously the next Slave vessel fluidisation delay timer (0 seconds) will be started. 當(dāng)上一個(gè)付泵流化延遲定時(shí)器到時(shí),付泵流化閥 (PV15)由電磁閥 (EV15)得電開(kāi)啟。 This process will continue until the Slave 1 MDPump fluidising valve (PV15) is opened by energising solenoid (EV15). Simultaneously the convey secure timer (20 seconds) will be started. The material will be conveyed through the pipeline to the