【正文】
rtificate in _______copies (Terms of CIF);(7)____簽發(fā)的產(chǎn)地證一式__份;Certificate of Origin in _________copies issued by____;(8) 裝運(yùn)通知(Shipping advice): 賣方應(yīng)在交運(yùn)后_____ 小時內(nèi)以特快專遞方式郵寄給買方上述第__項(xiàng)單據(jù)副本一式一套。裝運(yùn)船只按期到達(dá)裝運(yùn)港后,如賣方不能按時裝船,發(fā)生的空船費(fèi)或滯期費(fèi)由賣方負(fù)擔(dān)。The Seller shall, 30 days before the shipment date specified in the Contract, advise the Buyer by _______of the Contract No., modity, quantity, amount, packages, gross weight, measurement, and the date of shipment in order that the Buyer can charter a vessel/book shipping space. In the event of the Seller‘s failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for the Seller‘s account.(2) CIF或CFR交貨方式賣方須按時在裝運(yùn)期限內(nèi)將貨物由裝運(yùn)港裝船至目的港。The Seller shall ship the goods duly within the shipping duration from the port of loading to the port of destination. Under CFR terms, the Seller shall advise the Buyer by _________of the Contract No., modity, invoice value and the date of dispatch two days before the shipment for the Buyer to arrange insurance in time.16. 裝運(yùn)通知(Shipping Advice):一俟裝載完畢,賣方應(yīng)在__小時內(nèi)以____方式通知買方合同編號、品名、已發(fā)運(yùn)數(shù)量、發(fā)票總金額、毛重、船名/車/機(jī)號及啟