【正文】
hed. Which also meet the provisions of ventilstion, lighting and sunlight. The height of floor, gridding of column, place and dimension of the stair are fixd according to the require ments of the Code for Design of Library’s buildings. Then the architectural shop drawings must be done. Besides, the structural layouts are subsequently carried on and reinforced concrete frame is served as the main structural type. To begin with determing the directions of the frame ,the calculating uint and plan are gained. After summing up the dead loads and live loads of each floor, the internal forces of frame under the vertical load are calculated by means of employing the method of bending moment distribution, whose results are adjusted at both sides of sides of the beam. The basic wind pressure is referred from the load code for the design of building structures and internal forces are puted via Dvalue method. Furthermore, the horizontal displacement is checked to suffice the need。 通過(guò)對(duì) 車庫(kù) 樓層平面圖、剖面圖、構(gòu)造圖的繪制和結(jié)構(gòu)的設(shè)計(jì),熟悉了設(shè)計(jì)的全過(guò)程,掌握了結(jié)構(gòu)設(shè)計(jì)計(jì)算的基本方法,順利地完成了畢業(yè)設(shè)計(jì)任務(wù)??蚣苁芰︿摻钪饕捎芒蚣?jí)鋼筋,箍筋主要采用Ⅰ級(jí)鋼筋 。 本方案主體結(jié)構(gòu)為縱橫向承重框架。根據(jù)設(shè)計(jì)要求,設(shè)防烈度為 7 度,抗震等級(jí)為三級(jí),設(shè)計(jì)時(shí)按構(gòu)造設(shè)計(jì)。建筑設(shè)計(jì)是在總體規(guī)劃的前提下,根據(jù)設(shè)計(jì)任務(wù)書的要求,確定設(shè)計(jì)方案,畫出建筑施工圖;結(jié)構(gòu)設(shè)計(jì)是在建筑物初步設(shè)計(jì)的基礎(chǔ)上確定結(jié)構(gòu)方案,繪制結(jié)構(gòu)施工圖;基坑支護(hù)設(shè)計(jì)則是基于車庫(kù)施工時(shí)采用明挖法而設(shè)計(jì)的便于施工主題的輔助結(jié)構(gòu),也繪出了施工圖。河南科技大學(xué)畢業(yè)設(shè)計(jì) I 湖畔地產(chǎn)中心廣場(chǎng)地下車庫(kù) 建筑結(jié)構(gòu) 設(shè)計(jì) 摘 要 本畢業(yè)設(shè)計(jì)題目為“湖畔地產(chǎn)中心廣場(chǎng)地下車庫(kù) 建筑結(jié)構(gòu)設(shè)計(jì)”。設(shè)計(jì)的內(nèi)容包括建筑設(shè)計(jì)、結(jié)構(gòu)設(shè)計(jì)、基坑支護(hù)設(shè)計(jì) 三 部分。 該設(shè)計(jì)采用 鋼筋混凝土現(xiàn)澆 框架結(jié)構(gòu),地下兩層 。 根據(jù) 任務(wù)書定出各層平面圖及平面布置。在進(jìn)行荷載計(jì)算和構(gòu)件截面估算后, 選取了一榀框架 進(jìn)行計(jì)算 ,計(jì)算內(nèi)容包括框架梁柱截面尺寸的選取及線剛度的計(jì)算;恒載、活載、水土壓力作用下梁端、柱端彎矩、剪力的計(jì)算;框架梁柱配筋計(jì)算;樓梯配筋計(jì)算及基礎(chǔ)配筋計(jì)算。整個(gè)方案設(shè)計(jì)基本符合設(shè)計(jì)和結(jié)構(gòu)要求,具有一定的合理性。同 時(shí),對(duì)大學(xué)所學(xué)的專業(yè)知識(shí)和基本概念有了更深的理解,從而提高了分析和解決實(shí)際問(wèn)題的能力。The antiseismic design and fortification measures are got via the method of bottomshear force. Afterwards, the bination of internal force can be made by using the Excel and ward software, whose purpose is to find one or several sets of the most adverse internal force of the column and coterminous girders,which will be the basis of sectional reinfocements. The floor 河南科技大學(xué)畢業(yè)設(shè)計(jì) III panel and roof slab are considered as twodirection board according to plastic theory 。 Lastly, with making reference to the geological conditions, the form of base is determined as independent foundation. Then ,not only the foundation bearing capacity and deformation checking are design , but also carrying on the infrastructure design on the basis of Code for Design of Building foundation. KEY WORDS: Frame Structure, Architectural design, Construction design, Foundation pit support design 河南科技大學(xué)畢業(yè)設(shè)計(jì) IV 目 錄 前 言 ................................................... 6 第 1 章 設(shè)計(jì)的基本資料 ................................... 7 設(shè)計(jì)資料 .................................................... 7 結(jié)構(gòu)選型 .................................................... 8 梁柱截面尺寸和線剛度的確定 ................................. 8 梁的截面尺寸 ......................................... 8 柱的截面尺寸 .......................................... 8 現(xiàn)澆板厚 ............................................. 8 墻厚 .................................................. 8 框架結(jié)構(gòu)的布置 .............................................. 9 第 2 章 荷載統(tǒng)計(jì)與計(jì)算 .................................. 10 恒載標(biāo)準(zhǔn)值統(tǒng)計(jì) ............................................ 10 頂板自重 ............................................ 10 水土壓力 ............................................. 10 樓板自重 ............................................. 10 底板自重 ............................................ 10 梁自重 ............................................... 10 柱自重 ............................................... 11 墻自重 ............................................... 11 活荷載標(biāo)準(zhǔn)值統(tǒng)計(jì) .......................................... 11 結(jié)構(gòu)荷載計(jì)算 ............................................... 12 第 3 章 豎向荷載作用下框架內(nèi)力計(jì)算 ...................... 18 豎向恒載作用下的框架內(nèi)力分析 .............................. 18 豎向活載作用下的框架內(nèi)力分析 .............................. 27 豎向特載作用下的框架內(nèi)力分析 .............................. 33 第 4 章 水平荷載作用下框架內(nèi)力分析 ...................... 39 水平恒載作用下的框架內(nèi)力分析 .............................. 44 水平活載作用下的框架內(nèi)力分析 .............................. 46 水平特載作用下的框架內(nèi)力分析 .............................. 48 河南科技大學(xué)畢業(yè)設(shè)計(jì) V 第 5 章 內(nèi)力組合 ........................................ 50 框架梁的內(nèi)力組合與調(diào)整 .................................... 50 框架柱 的內(nèi)力組合與調(diào)整 .................................... 55 第 6 章 配筋 ............................................ 57 框架梁的配筋 ............................................... 57 框架柱的配筋 ............................................... 62 板的配筋 ................................................... 66 設(shè)計(jì)資料 ............................................. 66 荷載計(jì)算 ............................................. 66 水平板配筋 ........................................... 68 側(cè)墻板配筋 ........................................... 73 樓梯的配筋 ................................. 錯(cuò)誤 !未定義書簽。題目為“ 湖畔地產(chǎn)中心廣場(chǎng)地下車庫(kù)建筑結(jié)構(gòu)設(shè)計(jì) ”。 畢業(yè)設(shè)計(jì)是大學(xué)本科教育培養(yǎng)目標(biāo)實(shí)現(xiàn)的重要階段,是畢業(yè)前的綜合學(xué)習(xí)階段 ,是深化、拓寬、綜 合 教和學(xué)的重要過(guò)程 ,是對(duì)大學(xué)期間所學(xué)專業(yè)知識(shí)的全面總結(jié)。在畢業(yè)設(shè)計(jì)中期,我們通過(guò)所學(xué)的基本理論 、專業(yè)知識(shí)和基本技能進(jìn)行建筑、結(jié)構(gòu)設(shè)計(jì) 。 畢業(yè)設(shè)計(jì)的三個(gè)月里,在指導(dǎo)老師的幫助下,經(jīng)過(guò)資料查閱、設(shè)計(jì)計(jì)算、計(jì)算書撰寫以及外文的翻譯,加深了對(duì)新規(guī)范、規(guī)程、手冊(cè)等相關(guān)內(nèi)容的理解。在繪圖時(shí)熟練掌握了 AutoCAD,天正 , 及 PKPM 輔助軟件 .以上所有這些從不同方面達(dá)到了畢業(yè)設(shè)計(jì)的目的與要求。由于自己水平有限,難免有不妥和疏忽之處,敬請(qǐng)各位老師批評(píng)指正。 二、建設(shè)地點(diǎn) : 河南省洛陽(yáng)市。 四、水文資料 地下水位 。 表 11 工程地質(zhì)資料表 層序 土層名稱 埋深( m )層厚(m)重度 內(nèi)摩擦角內(nèi)聚力C(kpa)地基土承載力f(kpa)① 填土 ② 1 褐黃色粘土 ② 2灰色砂質(zhì)粉土夾粘土 ③灰色淤泥質(zhì)粉質(zhì)粘土 ④灰色淤泥質(zhì)粘土 ⑤ 1 灰色粘土 ⑤ 2灰色粉質(zhì)粘土 ⑥暗綠 草黃色砂質(zhì)粉土 ⑦ 1草黃色砂質(zhì)粘土 ⑦ 2 灰黃色粉沙 )/( 3mKN?)( 0?六、材料選用 混凝土:梁 、 柱 、 板 、外墻 均使用 C40 水下 混凝土。 頂板、外墻采用聚乙烯防水卷材。 內(nèi)墻采用水泥空心磚,其尺寸為 290mm 290mm 140mm, 重度 2/ mkN?? 。 二 .頂板結(jié)構(gòu):采用現(xiàn)澆鋼筋混凝土肋形頂板,厚 250mm。 四 .樓梯結(jié)構(gòu):采用鋼筋混凝土梁式樓梯。 六 .基礎(chǔ)結(jié)構(gòu)形式:樁筏基礎(chǔ),厚 ,樁為抗拔樁,承受土層負(fù)摩阻,以抵抗未承受使用荷載時(shí)車庫(kù)受到的地下水浮力。 根據(jù)《人民防空地下室設(shè)計(jì)規(guī)