freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

地下grp管道施工方案-在線瀏覽

2025-06-15 01:44本頁面
  

【正文】 r and Digital infrared thermometer for curing(if required)? Measuring tape and Barcol hardness tester for lamination test.? Mobile drum cradle, spill decks, plugless tap and steel gantries for resin store.? Glass cutting table, rolling tubes, knives, blades and scissors for glass prepare.? Buckets, Liquid storage containers, platform balance, stirrer, spill trays for resin measure and mixture.? Dispensing bottles(or similar tools) and chemical agent bottles for measuring and bringing catalyst to site.? Brass bristles, plastic brush, cleaning basin, duster cloth for tools cleaning.6. lamination Process SequenceMaterial receivingExcavation and bedding(by civil)TransportationAnd Arrange SpoolCutting(if required)GrindingInside cleanness Inspection and Fit uplaminating of JointVisual inspectionBarcol hardness testFull water testCoordinate and elevation measurement7. Bonding MaterialsUsed ponents RESIN: Epoxy vinyl ester resin supplied from Amiantit, and to be mixed it with catalyst.CATALYST: Methyl ethyl ketone peroxide .Mat amp。 wrap joint lamination3. Reference1 The drawing of 080036AADA100201~400207 U/G Composite DWG2 Specification:080036AASG007 Specification for Underground Piping amp。 wrap joint laminationACWDGAANA4”Butt amp。Method Statement Underground GRPPiping Installation WorksTitle:Underground GRP Piping Installation ProcedureTCC Prepared ByName : Position :Signature :Date :DAELIM ApprovalName :Position :Signature :Date :Approved By ClientName :Position :Signature :Date :Rev. 0This Document is the property of TCC. Issued to, and used by others needs the written approval of the TCC Quality Manager. CONTENTS Purpose Scope Reference Responsibilities Equipments and Tools Lamination Process Sequence Bonding Materials Receiving Handling and Storing of Pipe Arrange Pipe in Trench Joint Laminate Procedure Quality Requirements Safety Precaution Attachments 1. PurposeThis method statement is to guide butt joint wrap lamination work of U/G GRP piping system in the Arabian Chlor Vinyl Project.2. ScopeThis Method Statement covers the field lamination joints installation method of underground GRP piping. This procedure is applicable to all U/G GRP pipe diameters.Related data of U/G piping GRP part is as following:System descriptionMaterial classDiameter rangeConnection MethodW WDGAANA4”,6”,8”,10”,12”,20Butt amp。 wrap joint laminationPCSDGAANA4”Butt amp。 Surface Drainage080036XHSG003 Specification for piping construction080036XZSG001 Specification for Piping Design080036QZPL001 Project Quality Plan080036XHSG006 Specification for Identification of Piping Material080036XHSL005 Specification for Piping Material AMIANTIT document:Field Butt amp。 WOVEN ROVING: glass reinforcement for joint structure.BONDING MATERIALS STORAGE and USAGE:Details see attachment A: Field Butt amp。 glass reinforcement container as show in figure 71 Figure 71Storage outline of chemical container details see attachmentF: Interior layout for Amiantit Resin amp。 resanding of the l
點擊復制文檔內(nèi)容
公司管理相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1