【正文】
f ( 2), ask questions, a dd a central argume nt. For example: of the thinking a nd doi ng for dreams and deat h of the argum ents. (3) cases, a ccording t o the experi ence of a life poi nt (4), draws from the story pr obl ems, argument s (5), the central arg ument put forward in some way. For insta nce , metaphor, pari ng element s of the se cond: the argume nts argument : the material to pr ove point. (Authentic) 1, argument type ① facts ... 建筑工程一級注冊建造師繼續(xù)教育選修課 考試時間 (120 分鐘 ): 01:38, 未超過 1 分鐘請不要交卷。 c talk pr ocess in the sharp pr oposed。 opi nions, vie ws and ide as. (Right, disti nct) Note: essays generally have only one argument, some around the central argume nt put forward sev eral arguments, arg uments are use d to justify central argume nt. Find argume nt of method: a to see article s of title II to note argume nt in article s in the of location ⑴ title reveals。1, coa l mines, mi ne are i n charge of the water control work responsi bility, and (b) specifically re sponsible for t he te chnical ma nagement of water preventi on a nd control w ork. A, Chief E nginee r, mine b, c, geol ogy, geol ogical survey V ice Presi dent d se ction 2, coal mine s, mine shoul d be the prepa ration of the me dium and longterm planning a nd control water (a) pla ns, a nd t heir impleme ntation. A, year b, quarters c, 3, coal mi nes, mi ne should be (a) for water education and traini ng to e nsure empl oyees have the ne cessary k nowledge of water control, im proving water control w ork ski lls and t he ability to resist water damage. A, b, c, grassroots lea ders, l eaders of workers d, head of mine main w ell 4, mi ne and industrial site i n the elevation of the buil ding ( d) local t he hig hest flood l evel, constructi on of dams, canal s or other w aterproofing and drai nage measures. A, is e qual to b, no hig her tha n c, higher tha n d, l ess t han 5 , mine mai n pumping station shoul d be at least (b) exits, an exit with incli ned roa dway int o the well bore , over and above the pump House floor 7m. A, 1 b, 2 c, 3 d, 4 6 mi ning area water Chamber, the effective capa city shoul d be a ble to hol d (b) normal infl ow in mining area. A , 2H b, 4H c, 6h d, 8h 7, short sump capa city should be maintaine d at a total ca pacity of (b) above. A, 40% b, 50% c, 60% d, 70% 8, i n the year before the rai ny season, shoul d plete over haul (a), and all pumps a nd back up pumps w ere 1 joi nt tests and found the problem an d deal with it. A, 1 b, 2 c, 3 d, 4 9, plex and very pl ex hydroge ologi cal conditions of mine on the ground coul d not be i dentified whe n mine hy droge ological conditi on a nd water filli ng factors should be persisted, (d) the principl e of strengtheni ng the w ork of survey water. A, diggi ng after the first b, c mi ning, after the first ha d the suspect s will find d, excavations w ill be 1 0, pe rating expl oration of goaf water, karstic water a nd drilling wate r, water dril ling group layout, and in t he roa dway in front of the hor izontal plane a nd verti cal pla ne fansha ped. Drill hole locations to meet horizontal di stance (d) as the sta ndard, thick coal seam in the bore hole offset must not exce ed . A, 1 M b, 1 .5M c, 2m d, 3M 1 1, seam, prohibiti on in principle survey water pre ssure above (c) MPa water filling fault water, a quifer water and karstic wate r. If nee ded, y ou can waterpr oof wall a nd gate wall withi n survey water. A, b , 0 .8 c, 1 d, , 12 a nd up the Hill when the water, dual roa dway, one of the leadi ng water and catchment, a not her to withdraw se curity men. Double r oom every (b) 1 m excavation conta ct La ne , and retaini ng walls . A, 10 30 b, 30 50 c, 507 0 d, 70 10 0 13, dow nhole survey water should use a de dicate d ... Exam exam elements 1. find out the Central the sis of the arti cle 2: i dentify type s of arguments summarize d the argume nts of the mai n content 3. i dentifi cation of the methods use d in thi s paragraph or sentence, a nd its benefits. 4. (this paragraph) dem onstration (process) w hat is it? 5. taste the be nefits or effects of some w ords in a se ntence. 6. for an articl e to add a fact or reasona ble argume nt 7. do you agree with t he aut hor? Plea se explai n the rea sons. Argume ntative is talking a bout as the mai n expression of style. Throug h facts and reason, use l ogic to show that the a uthor39。s views and attitudes to a n issue and analysis on some phenomenon of insights a nd i deas. Three el ements of argume ntation elements: argument 1, arg ument: arg ument: a uthors 39。 b begi nni ng proposed。 d e nd a ntibody。 一,單選題 ,本題型每題有四個備選答案,其中只有一個答案是正確的,多選,不選,錯選均不得分。 A. 權(quán)益 B. 義務(wù) C. 責(zé)任 D. 風(fēng)險 2. 在沖突識別模型中,主要包括( )。 A. 成本增加風(fēng)險 B. 技術(shù)風(fēng)險 C. 行為主體風(fēng)險 D. 環(huán)境風(fēng)險 4. 解決沖突問題的積極、有效策略是( )。 1, coa l mines, mi ne are i n charge of the water control work responsi bility, and (b) specifically re sponsible for t he te chnical ma nagement of water preventi on a nd control w ork. A, Chief E nginee r, mine b, c, geol ogy, geol ogical survey V ice Presi dent d se ction 2, coal mine s, mine shoul d be the prepa ration of the me dium and longterm planning a nd control water (a) pla ns, a nd t heir impleme ntation. A, year b, quarters c, 3, coal mi nes, mi ne should be (a) for water education and traini ng to e nsure empl oyees have the ne cessary k nowledge of water control, im proving water control w ork ski lls and t he ability t o resist water damage. A, b, c, grassroots lea ders, l eaders of workers d, head of mine main w ell 4, mi ne and industrial site i n the elevation of the buil ding ( d) local t he hig hest flood l evel, constructi on of dams, canal s or other w aterproofing and drai nage measures. A, is e qual to b, no hig her tha n c, higher tha n d, l ess t han 5 , mine mai n pumping station shoul d be at least (b) exits, an exit with incli ned roa dway int o the well bore , over and above the pump House floor 7m. A, 1 b, 2 c, 3 d