freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

lvhmlowvolume-highmix(ppt20)-經(jīng)營(yíng)管理-在線瀏覽

2024-10-19 15:09本頁(yè)面
  

【正文】 e workcell staffing requirements. ? Automate data processing. ? Enhance forecast and demand analysis. ? Strengthen constraint analysis (plan the constraints first). ? Optimize production scheduling. ? Shorten the mit process. ? Measure impact and liabilities. ? Configure for flexibility. ? Focus on asset utilization. ? Program to reduce changeover (not cycle time). ? Manage process gate/bottleneck constraints. ? Consolidate floor material storage. ? Monitor WIP status and maintain WIP buffers. LVHM Detailed Solutions (con’t) ? Minimize inventory and keep it accurate. ? Verify and record setups electronically. ? Streamline the first article process. ? Take test processes offline. ? Leverage alternate test strategies. ? Configure locations in Enterprise Resource Planning (ERP) to manage material by build. ? Aggressively reconcile inventory through a robust return to stock process. ? Design systems for rapid physical and systematic movement ? Enhanced ECN processes. ? Promote velocity in Receiving Inspection through a modified skip lot process. Additional LVHM Challenges ? Premium Transportation Costs ? Purchasing Management ? Metrics Management ? Human Resource Considerations ? Changing our mindset
點(diǎn)擊復(fù)制文檔內(nèi)容
教學(xué)課件相關(guān)推薦
文庫(kù)吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1