freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

福特汽車-fpds系統(tǒng)介紹(ppt16)-汽車-在線瀏覽

2024-10-17 19:10本頁(yè)面
  

【正文】 ategy (PALS) defined ?Preliminary manufacturing, assembly, reusability, and modularity strategies defined ?Prelim. brand profiler, mkt. research plan, and customer experience research pleted ?Customer, corporate, and regulatory requirements defined ?Benchmark and Ford parator vehicles identified 6 PreSI 2 (Target Ranges Assessed) Adequacy of postSIresources verified and program staffing plan updated ?Initial strategies developed and preliminary target ranges for vehicle attributes assessed ?Potential vehicle alternatives and assumptions defined ?Vehicle assembly plant location confirmed and VOSI cost analysis pleted ?Sourcing workplan pleted amp。 assumptions Vehicle Design Spec.(VDS),including patible vehicle point targets pleted Subsystem (level 1) target agreements signed Campaign prevention awareness sessions pleted ?Manufacturing and assembly location for each derivative confirmed ?Implementation Readiness (IR)for new powertrain technology signedoff ?Vehicle/system /subsystem(level 1) targets mitted ?Powertrain lineup selected and powertrain package envelope pleted ?All supplier’s sourced and part of team ?Initial Attribute Prototype (AP) plan is pleted and VPP[timing plan]signedoff 9 PH Proportions amp。people and cargo package frozen 10 PAProgram Approval (All Targets Bee Objectives) Adequacy of post PA resources verified and staffing issues resolved PMT/PAT work plans for current and future milestones updated Affordable business structure to reflect patible objectives amp。 enditem) Design Specifications (CDS) patible with program objectives Enditem / ponent target agreements signed Program technology application report pleted Program specific FMEA’s pleted Subsystem Level 2 amp。 CP prototype vehicle builds pleted Program Parts List (PPL), including service parts, pleted ?All targets(. function, cost, etc.)bee objectives and are patible 11 (ST) Surface Transfer (Interior/Exterior Surface Provided) Adequacy of post (ST) resources verified and staffing issues resolved Design Manufacturing and Assembly Readiness (DMAR) patibility pleted: —Interior/Exterior Class IA surfaces transferred to eng./manuf.(+/ mm) —All hardpoints frozen Campaign prevention”Deep Dive” Review (of enginee
點(diǎn)擊復(fù)制文檔內(nèi)容
試題試卷相關(guān)推薦
文庫(kù)吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1