freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

福特汽車-fpds系統(tǒng)介紹(ppt16)-汽車-閱讀頁

2025-08-30 19:10本頁面
  

【正文】 ring disciplines)pleted ?Powertrain design (including P/T control system strategy) pleted 12 PRProduct Readiness (Designs Ready for CP Builds) Adequacy of post PRresources verified and staffing issues resolved Package patibility (interference, service, assembly, occupant/cargo) issues resolved Analytical signoff of vehicle performance versus requirements and specifications ?Management drive amp。 robustness for priority systems(including campaignable items) demonstrated Campaign prevention verification “Deep Dive” review (engineering disciplines) pleted CP confirmation tests analyzed Design FMEA documents, in support of preliminary engineering signoff, updated Preliminary Engineering Signoff pleted —Initial CP durability testing and initial set of road tests pleted —Known changes from CP containable for 1PP —Design is at Job1 levelno further design changes except”No Builds” —Engineering confidence that objectives will be met and assessed —Management drive pleted ? Graining/Final Colors approved ?Supplier mitment to support 1PPwith PSW parts ?Production level P/T calibration available ?CP post durability”Fresh Eyes” review pleted 15 LR Launch Readiness (Engineering SignOff Complete) Adequacy of post LR resources verified and staffing issues resolved Production build (1PP) readiness assessment pleted 100% PSW parts available for 1PP Final Engineering Signoff including: —Functional objectives satisfied and final road tests pleted —100% CP durability testing pleted —Design Certification based on CP lab/rig certification/ homologation test results —Readiness to proceed to assembly Tool TryOut(TTO), 1PP and Job 1 ?Hard Tooled Functional Build (HTFB) issues resolved ?All production assembly tools functioned at tool source or in homeline ?Color/textures/gloss signoff pleted 16 LS Launch Signoff (Ready to Launch) ?Vehicle assembly Tool TryOut(TTO) amp。 process verification pleted including aids amp。 final quality indicators meet program objectives ? Field Evaluation Unit (FEU) drive pleted ?Emission certification received ?Campaign prevention “Fresh Eyes” of process validation pleted ?Campaign prevention “Fresh Eyes”review of FEU, IB and J1 builds pleted
點(diǎn)擊復(fù)制文檔內(nèi)容
試題試卷相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1