【正文】
acuation design, seismic is designed to coordinated with the surrounding environment. Structure design contains six parts: calculation of the size of column, beam and slab, load putation, the frame side rigidity putation, the frame internal forces of the portal frame construction and the side displacement under the horizontal load action and vertical load action, internal force binations, reinforcing putation. Because the structure’s height is lower than 40m, the equivalent base shear method is used under the level of seismic loading. Key words: Office building。結(jié)構(gòu)設(shè)計(jì)分六部分:梁、板、柱截面尺寸估算,荷載計(jì)算,框架側(cè)移剛度計(jì)算,橫向水平荷載作用下框架結(jié)構(gòu)的內(nèi)力和側(cè)移計(jì)算,豎向 荷載作用下框架的內(nèi)力計(jì)算,內(nèi)力組合,配筋計(jì)算??拐鹪O(shè)防烈度 7 度,場(chǎng)地類(lèi)別Ⅱ類(lèi)。底部層高 米,標(biāo)準(zhǔn)層高 米。大慶石油學(xué)院本科生畢業(yè)設(shè)計(jì)(論文) I11 層辦公樓建筑設(shè)計(jì)問(wèn)題,依據(jù)規(guī)范對(duì)其進(jìn)行了建筑功能、結(jié)構(gòu)構(gòu)件、結(jié)構(gòu)主體進(jìn)行了設(shè)計(jì)、計(jì)算。該辦公樓建筑總長(zhǎng) 米,總建筑面積 11000m2。主體采用樁基礎(chǔ),裙房采用柱下獨(dú)立基礎(chǔ)。 設(shè)計(jì)主要包括建筑和結(jié)構(gòu)兩大部分,建筑設(shè)計(jì)方面進(jìn)行 了建筑平面,立面及剖面設(shè)計(jì),功能分區(qū)設(shè)計(jì),防火疏散及抗震設(shè)計(jì),與周?chē)h(huán)境協(xié)調(diào)設(shè)計(jì)。由于總建筑高度 米,對(duì)于水平地震作用采用 底部剪力 法 。 Frame structure。 Pile foundation. 大慶石油學(xué)院本科生畢業(yè)設(shè)計(jì)(論文) III 大慶石油學(xué)院本科生畢業(yè)設(shè)計(jì)(論文) IV 目 錄 第 1章 建筑設(shè)計(jì) ................................................................................................... 1 總體設(shè)計(jì) .................................................................................................... 1 平面設(shè)計(jì) .................................................................................................... 1 立面設(shè)計(jì) .................................................................................................... 1 剖面設(shè)計(jì) .................................................................................................... 2 交通防火設(shè)計(jì) ............................................................................................ 2 構(gòu)造設(shè)計(jì) .................................................................................................... 2 樓、電梯的布置 ........................................................................................ 2 交通與疏散 ................................................................................................ 2 抗震分析 .................................................................................................... 3 第 2章 結(jié)構(gòu)設(shè)計(jì) ..................................................................................................... 4 結(jié)構(gòu)布置 .................................................................................................... 4 構(gòu)件 基本 尺寸 的初步估算 ........................................................................ 5 重力荷載的計(jì)算 ........................................................................................ 6 橫向側(cè)移剛度和縱向側(cè)移剛度計(jì)算 ........................................................ 7 橫向水平地震作用下框架內(nèi)力計(jì)算 ...................................................... 13 橫向 風(fēng)荷載 作用下框架 內(nèi)力 計(jì)算 .................................................