freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

土木工程專業(yè)英語結(jié)課論文-展示頁

2025-08-03 18:57本頁面
  

【正文】 atment method, key point is observed in examining trough and drill detecting trough inspection principle and method. Analyzes the principle of foundation reinforcement and strengthening method.[ Key words ] observation check slot, drilling trough inspection.1, introduction :toward a building body foundation is very important, however, do a good job in the basic pit trough inspection before we do, only accurate data before we can get trough inspection of existing land production based scheme, then know need foundation reinforcement, such as the need to be effective fast ripe reinforcement so as to ensure the followup work smoothly, shorten time limit for a project is not necessary, in order to save costs.2, foundation trench inspection If the foundation reinforcement treatment for must be natural foundation, when the pit ( groove ) dig to base design elevation, the construction unit must in reconnaissance, design, inspect manage unit and owner jointly check slot, eligible and rear for foundation engineering construction.I, observation check slot Observation of trough inspection inspection pit ( groove ) in addition to the position, section size, elevation and slope and so on with the design requirements, the key should the pit ( groove ) bottom soil prehensive observation.①soil and the color is the same。③soil moisture content is abnormal or not, there is no too dry or wet。②preparation of hammer and drill rod, a drill diameter engineering should be consistent, the heavy hammer is consistent。④drilling, requirements to consistent, hammer drop distance consistent. Each penetration30CM ( called step ),
點擊復(fù)制文檔內(nèi)容
高考資料相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1