freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

站內(nèi)露空管道系統(tǒng)安裝方案k03(參考版)

2025-05-06 07:24本頁面
  

【正文】 Pipe prefabrication shall have the transportation and installation into consideration and reserve adjustable movable opening. Prefabricated pipe section should firstly clean its inside, close the orifice to avoid entering of foreign matters.(5)預(yù)制組合件不允許長期處于臨時(shí)固定狀態(tài)。磨工應(yīng)佩戴面罩和手套等附加 PPE。Onepiece mechanical processor (one time of forming for cut off and bevel)and pipe cutting machine will be applied for mechanical cutting.C 切割后的管段,對沒有標(biāo)識的,應(yīng)對應(yīng)原管段標(biāo)識進(jìn)行移植。When cutting straight pipe is required, torch cutting or mechanical cutting (heat treatment pipe) will be applied according to pipe material and requirements of welding procedure. The identification will be transplanted after cutting.A 火焰切割采用手持式火焰割俱和半自動(dòng)機(jī)械割俱進(jìn)行切割,然后采用打磨機(jī)或坡口機(jī)進(jìn)行加工坡口。尺寸/ 標(biāo)簽錯(cuò)誤應(yīng)根據(jù) 《不合格品控制程序》CDB0000QACPCDSC20000000700 處理。Limited pipe prefabrication will be performed by Constractor in temporary fabrication facilities on construction site。All open ends shall be blanked properly using plastic endcaps, plastic sheets or plywood covers to prevent entry of foreign material and damage to bevel ends, threads and flange faces during transporation and storage.? 所有管道預(yù)制件都應(yīng)標(biāo)注所屬裝置及管道編號。 For pipe prefabrication, it will be done by mechanical processing and conventional manual welding. ? 預(yù)制管段應(yīng)清潔并采取適當(dāng)?shù)姆绞教幚恚缬晒芄ねㄟ^刷磨,以保證其內(nèi)外都無焊接碎屑,弧擊和異物。站內(nèi)露空管道系統(tǒng)安裝方案Method Statement for Installation of Exposed Pipeline in Well Pad and Gathering Station7Handling, Storage, Packaging And Handover Procedure CDB0000QACPCDSC20000000900 has detailed the acceptance, storage, issuance, maintenance and record of pipe fitting and piping materials. 管道預(yù)制前應(yīng)進(jìn)行防腐涂裝,涂裝方式按照《現(xiàn)場噴砂除銹及油漆噴涂施工方案》 CDB0000TECPLN SC20000001000 執(zhí)行。After acceptance, acceptance inspection record should be done for equipment and piping ponent. 所有設(shè)備、材料、管道組成件等進(jìn)場物資首先進(jìn)行外觀質(zhì)量、規(guī)格參數(shù)檢查、做好標(biāo)識,并對其備件及相關(guān)資料登記。Check HIC and SSC reports of pipe fitting of each heat number, and check heat treatment report of each pipe fitting.管件外觀和幾何形狀尺寸檢查按照不同廠家到貨數(shù)量的 10%進(jìn)行抽查,且不得少于 3 件,若有不合格,應(yīng)全部檢查。The appearance of steel pipe should not have crack, bump, stratification, overburn, lap, inclusion and other defects, sampling ratio is 10% as per system as well as not less than five pieces, if unqualified, all of them should be fully checked.鋼管表面有銹蝕、麻點(diǎn)或劃痕等缺陷時(shí),其深度不應(yīng)大于該鋼材厚度負(fù)允許偏差值 1/2。 Welding無損檢測NDT管道試壓PressureTesting管道吹掃Blowing熱處理HW熱處理HW無損檢測NDT. 材料檢查及驗(yàn)收 Acceptance Inspection of Check 材料到場后,SPC 會同 SPCS、CDB 質(zhì)量工程師進(jìn)行驗(yàn)收檢驗(yàn),如下列材料: When materials arriving on site, SPC, SPCS and CDB quality engineers jointly inspect and accept them. Materials are as following:(1) 鋼管 Steel Pipe鋼管尺寸和形位應(yīng)符合其產(chǎn)品標(biāo)準(zhǔn)的要求,抽查比例為 10%,且不少于 1 件,若有不合格,應(yīng)全部檢查。Construction relationship coordination: Prior to start of construction, it will confirm with CDB, supervision unit and other coworking unit on construction scope, construction operation area, construction operation boundary and other especial issues, so as to guarantee successfully development and shift of this project. ? 落實(shí)現(xiàn)場的用水用電以及施工場地的平整,施工區(qū)域的清理等。材料報(bào)審合格后才能使用。 construction personnel must pass orientation training, certified and be reported prior to work on site. ? 施工技術(shù)準(zhǔn)備:按施工程序要求先后完成施工圖會審、設(shè)計(jì)交底和施工技術(shù)交底,并組織相關(guān)人員熟悉設(shè)計(jì)要求和相關(guān)技術(shù)質(zhì)量標(biāo)準(zhǔn)與規(guī)范。All personnel will be made aware of the environmental aspects of the works through toolbox talks and where necessary training sessions on the certain aspects of the works affected by the environment.5. 工藝 PROCESS. 施工準(zhǔn)備 preparation for construction? 施工機(jī)具和人員的準(zhǔn)備:所有機(jī)具設(shè)備齊全完好,經(jīng)過 CDB 檢查合格且報(bào)審后方可進(jìn)場使用;施工人員必須經(jīng)過入場培訓(xùn)合格且報(bào)審后才能進(jìn)場施工。Operators of special works must obtain relevant qualification certification of corresponding works and qualified in verification before work.? 操作人員進(jìn)場施工前應(yīng)參加 CDB 的 HSE 培訓(xùn),并取得相關(guān)證件。并且按照所有人員在進(jìn)場施工前都必須經(jīng)過入場訓(xùn)且合格。08183951111救護(hù)中心聯(lián)系電話(南壩境內(nèi))Emergency center( in Nanba) 15182812999;08185520999救護(hù)中心聯(lián)系電話(開縣境內(nèi))Emergency center (in Kai County) 13509457111;023526632224. 培訓(xùn)和人員資質(zhì) TRAINING AND COMPETENCY OF PERSONNEL? 承包商應(yīng)對方案里描述的工作執(zhí)行情況負(fù)責(zé)。聯(lián)系人先后順序的選擇應(yīng)本著對處理事件或傷者最有利的方式。If emergency happens in construction, report procedure will be accordance with Accident Management Procedure CDB0000HESPCDSC20000001400.? 應(yīng)急救援按照《應(yīng)急總預(yù)案》CDB0000HESPLNSC20000000100 執(zhí)行。急救箱內(nèi)包含的內(nèi)容應(yīng)符合川東北項(xiàng)目要求。Warning sign, tag board will be set up at work area。 Check the power cable in good condition and arrange it properly on site.? 工作場所應(yīng)設(shè)置警示、標(biāo)識牌,必要時(shí)設(shè)置硬維護(hù)以防止擅自入內(nèi)。Contractor shall be responsible for execution of activities described in this Method Statement.? 現(xiàn)場應(yīng)安排專職安全檢查員,應(yīng)制定警戒線和樹立警示牌,并安排現(xiàn)場巡查。Any transportation vehicle entering or exiting construction location should have vehicle guardian, especially when backing or unloading.? 確保在實(shí)施前所有的相關(guān)活動(dòng)和方案都已獲批準(zhǔn),否則應(yīng)立即停止。站內(nèi)露空管道系統(tǒng)安裝方案Method Statement for Installation of Exposed Pipeline in Well Pad and Gathering Station4Waste management, including use and recycle of anticorrosion paint and liquid cleaning agent. Garbage tin should be provided. The waste should be disposed at designated location according to CDB waste management requirements to ensure no pollution to the environment.? 物料的搬運(yùn),按照 CDB《安全工作規(guī)范手冊》要求,超過 20 公斤的物料或設(shè)備不能用人工搬運(yùn),應(yīng)使用機(jī)械搬運(yùn)。House keeping on site. Make plan for temporary facilities and pipe laydown area and make sure they are placed orderly.? 作業(yè)現(xiàn)場非指定區(qū)域禁止吸煙,現(xiàn)場設(shè)置吸煙點(diǎn)。Provide safety officer in a proportion of “50 workers: 1 safety officer” on worksite to ensure safety of personnel and material.? 作業(yè)過程中,每名員工有權(quán)利且有義務(wù)對不安全行為 “叫?!?。Warning sign, tag board will be set up at work area。安排專人負(fù)責(zé)管理(持證電工)發(fā)電機(jī)、配電箱等,并有日檢查記錄。Erection and dismantlement of scaffold/ platform should be worked by petent personnel. The scaffold can not be used unless it is inspected, accepted and tagged after erection.? 高處作業(yè)點(diǎn)設(shè)監(jiān)護(hù)人,工作人員必須穿戴全身式安全帶并堅(jiān)持高掛低用的原則,工作區(qū)域和安全帶系掛點(diǎn)需在作業(yè)前檢查確認(rèn)。Watch men will be set at hot work locations, as well as firefighting equipments. Certain measures will be taken to sheld welding arc. Surround
點(diǎn)擊復(fù)制文檔內(nèi)容
規(guī)章制度相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1