【正文】
Glass Reinforcement ContainerTHANKS !!!致力為企業(yè)和個人提供合同協(xié)議,策劃案計劃書,學習課件等等打造全網(wǎng)一站式需求歡迎您的下載,資料僅供參考可編輯修改。 CatalystAttachmentEU/G GRP PIPING ORGANIZATION CHARTMaterial ManagerSUN changgenStorage ManagerHU zhongkuiQC InspectorYANG zuoxuQC SupervisorHOU manyiLaminating teamIncharge:Peng .Supervisor:Zhang .QC: Xu .Workingcrew: 4Transportation team Incharge:Ge ZaiqiaoWorkingcrew: 1Fitting team Incharge:Peng .Supervisor:Zhang .QC:Xu .Workingcrew: 2GRP ManagerLI wanjinAll manage staff, foreman and leaders for lamination have been trained by pipe vendor before starting work at site. workers who are trained and qualified shall be over 40% of all workers involved in GRP piping construction. 2 Supervisor and 1 QC inspector shall be trained before working start, and 1 coordinator may be needed together with them.AttachmentF Interior layout for Amiantit Resin amp。 Wrap Joint Procedure Page 12 to 14.13. AttachmentsAttachmentA Field Butt amp。 Portable water station can be used for eyewash.Wear resistant gloves such as: polyvinyl alcohol, butyl rubber, nitrile or neoprene. wear normal work clothing covering arms and legs. Hazard OF MATERIALS:All chemical materials must be used carefully with PPE. RESIN: Cause severe eye and skin irritation. Aspiration of material into the lungs can cause chemical pneumonitis, and other lung injury.ACCELERATOR: Do not breathe vapours and avoid contact with skin. It can cause lung damage if swallowed and cause cancer. Flammable.CATALYST: Risk of explosion by shock, friction, fire or other sources of ignition, may cause fire, Harmful if swallowed, Caused burns. Keep away from reducing agents, acids, alkalies and heavy metal pounds. Do not mix with peroxideaccelerators or reducing agents. Use only stainless steel 316, PVC, polyethylene or glasslined equipment.Mat amp。 Wrap Joint Procedure Page 8 to 11 LAMINATION ON THE PIPE JOINT of and attachment B: Installation and Handling Instructions For Rigid Joint Pipe Page 5 to 6.1 Enough catalysted resin should be prepared for about 20 –30 minutes gel time and thorough mixing it.2 Spread a thin layer of catalysted resin directly on the surfaces of the pipe joint laminating area.3 Place of chopped strand mat on the surface of wet out area smoothly and wet it out with the paint wooly roller.4 Continue building by alternating chopped strand mat and woven roving and plete wetting out each one before applying the next ply. No more than 5 plies in one layer. Covered with chopped strand mat.The paint roller roll out over the plies to release big air cavities and any excessive resin. Avoid air getting into the laminate by using steel grooved roller slightly pressed to remove out the air bubbles. The angle of groove roller shall be changed time to time in order to remove the air bubbles in all directions. Keeping in consideration that very limited time has left for the resin to start getting gel, make sure all air bubbles have been taken out prior to start the plies to bee hard. Stop rolling as soon as the resin begin to gel. 5 Continue this procedure until all the sections of the first layer been applied. Make sure that each section overlap with the others at least 5 cm. Let this lay