freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

土木工程外文翻譯---建筑混凝土裂縫的預(yù)防與處理-建筑結(jié)構(gòu)(參考版)

2025-05-17 14:08本頁面
  

【正文】 s withdrawing a method, alkalescence to recover a method is a chemistry protection method in three kinds of in mon use but valid advantage of this kind of method is a protection method under the influence of environment factor smaller, apply reinforcing bar, concrete of longterm antisepsis, since can used for crack structure already can also used for new set up structure. Imitate to living from legal more Imitate to living from heal the method be a kind of new crack treatment, its mimicry living creature organization secrete a certain material towards suffering wound part auto, but make the wound part heal of function, join some and special position(such as contain to glue knot of the liquid Xin fiber or capsule) in the concrete of the tradition the position, at concrete inner part formation the intelligence type imitate to living from heal nerve work system, be the concrete appear crack secrete a parts of liquid Xin fiber can make the crack re heal. 4 Conclusion The crack is widespread in the concrete structure existence of a kind of phenomenon, it of emergence not only will lower the anti Shen of building ability, influence building of usage function, and will cause the rust eclipse of reinforcing bar, the carbonization of concrete, lower the durable of material, influence building of loading ability, so want to carry on to the concrete crack earnest research, differentiation treat, adoption reasonable of the method carry on processing, and at under construction adopt various valid of prevention 浙江大學(xué)城市學(xué)院畢業(yè)設(shè)計 外文翻譯 measure to prevention crack of emergence and development, assurance building and Gou piece safety, stability work. 。t have the surface crack of influence and deep enter crack of processing measure that is usually is a surface in crack daubery cement syrup, the wreath oxygen gum mire or at concrete surface Tu2 Shua paint, asphalt etc. antisepsis material, at protection of in the meantime for keeping concrete from continue under the influence of various function to open crack, usually can adoption the surface in crack glue to stick glass fiber cloth etc. measure. Infuse syrup, the Qian sew method Infuse a syrup method main the concrete crack been applicable to have influence or have already defend Shen request to the structure whole of repair, it is make use of pressure equipments gum knot the material press into the crack of concrete, gum knot the material harden behind and concrete formation one be whole, thus reinforce of in mon use gum knot material has the cement the syrup, epoxy, A Ji C Xi sour ester and gather ammonia ester to equalize to learn material. The Qian sew a method is that the crack be a kind of most in mon use method in, it usually is follow the crack dig slot, the Qian fill Su in the slot or rigid water material with attain closing crack of in mon use Su material has PVC gum mire, plastics ointment, the D Ji rubber etc.。s etc. overlay, and attention sprinkle water to protect, appropriate extension protect time, assurance the concrete surface be slowmoving cool off. At the cold season, concrete surface should constitution heat preservation measure, in order to prevent cold wave is the allocation be a little amount in the concrete of reinforcing bar perhaps add fiber material concrete of temperature crack control at certain of scope inside. Crack and prevention that the chemical reaction cause Alkali bone39。The size bigger structure of the beam plank length, the crack run parallel with short side more。 Cape direction development, bigger sink to sink crack, usually have certain of wrong, crack width usually with sink to decline quantity direct proportion width under the influence of temperature variety foundation after transform stability sink to sink crack also basic tend in stability. Main prevention measure:One is rightness loose soft soil, return to fill soil foundation a construction at the upper part structure front should carry on necessity of Hang solid with is the strength that assurance template is enough and just degree, and prop up firm, and make the foundation be subjected to dint is keep concrete from sprinkle infusing the foundation in the process is soak by is time that template tore down to can39。Perhaps because of template just degree 浙江大學(xué)城市學(xué)院畢業(yè)設(shè)計 外文翻譯 shortage, the template propped up to once be apart from big or prop up bottom loose move etc. to cause, especially at winter, the template prop up at jelly soil up, jelly the soil turn jelly empress creation asymmetry to sink to decline and cause concrete structure creation kind crack many is deep enter or pierce through sex crack, it alignment have something to do with sinking to sink a circumstance, general follow with ground perpendicular or present 30 176。s much presenting in the center breadth, both ends be in the centerthin and the length be different, with each other not coherent crack general long 2030 cm, the longer crack can reach to a 23 m, breadth 15 creation of main reason is:The concrete is eventually almost having no strength or strength before the Ning very small, perhaps concrete just eventually Ning but strength very hour, be subjected to heat or pare strong wind dint of influence, t
點擊復(fù)制文檔內(nèi)容
畢業(yè)設(shè)計相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1