【正文】
s anticipating the crack that reaction crack and reinforcing bar rust eclipse cause is the most familiar in the reinforced concrete structure of because of chemical reaction but cause of crack. The concrete blend a future reunion creation some alkalescence ion, these ion with some activity the bone anticipate creation chemical reaction and absorb surroundings environment in of water but the physical volume enlarge, make concrete crisp loose, inflation open this kind of crack general emergence concrete structure usage period, once appear very difficult remediable, so should at under construction adopt valid the measure carry on of prevention measure:While being to choose to anticipate with the alkali activity small freestone is the in addition which choose to use low lye mire with low alkali or have no is the Chan which choose to use acmodation with anticipate to repress an alkali bone to anticipate reaction. Because the concrete sprinkle to build, flap Dao bad perhaps is a reinforcing bar protection layer thinner, the harmful material get into concrete to make reinforcing bar creation rust eclipse, the reinforcing bar physical volume of the rust eclipse inflation, cause concrete bulge crack, the crack of this kind type much is a crack lengthways, follow the position of reinforcing bar of prevent measure from have:One is assurance reinforcing bar protection the thickness of the is a concrete class to go together with to want is a concrete to sprinkle to note and flap Dao airtight is a reinforcing bar surface layer Tu2 Shua antisepsis coating.From《CANADIAN JOURNAL OF CIVIL ENGINEERING》。Thorough with pierce through sex of temperature crack general and short side direction parallelism or close parallelism, crack along long side cent the segment appear, in the center more width the size be different, be subjected to temperature variety influence more obvious, winter pare breadth, summer more concrete temperature crack that the heat inflation cause is usually in the center the thick both ends be thin, but cold Suo crack of thick thin variety not too emergence of the this kind crack will cause the rust eclipse of reinforcing bar, the carbonization of concrete, the anti jelly which lower concrete melt, anti tired and anti Shen ability etc.. Main prevention measure:One is as far as possible choose to use low hot or medium hot water mire, like mineral residue cement, powder ash from stove cement...etc..Two is a decrease cement dosage, cement dosage as far as possible the control is in the 450 kg/m 3 is to lower water ash ratio, water ash of the general concrete ratio control below is improvement the bone anticipate class to go together with, the Chan add powder ash from stove or efficiently reduce water etc. to e to reduce cement dosage and lower water to turn is an improvement concrete of mix blend to process a craft, lower sprinkle of concrete to build is the in addition that the Chan add a have of fixed amount to reduce water and increase Su, slow Ning etc. function in the concrete, improvement the concrete mix to match a thing of mobility, protect water, lower water to turn hot, postpone hot Feng of emergence is the heat season sprinkle to build can the adoption take to establish to hide sun plank etc. assistance measure control concrete of Wen Sheng, lower to sprinkle temperature of build the is the temperature of big physical volume concrete should the dint relate to structure size, concrete structure size more big, temperature should dint more big, so want reasonable arrangement construction work preface, layering, cent the piece sprinkle to build, for the convenience of in spread hot, let up is at great inner part constitution of the physical volume concrete cool off piping, cold water perhaps cold air cool off, let up concrete of inside outside difference in is the supervision which strengthen concrete temperature, adopt to cool off in time, protection is to reserve temperature constringency to is to let up to control, sp