freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

cims作業(yè)-資料下載頁

2025-01-16 18:03本頁面
  

【正文】 ComputerIntegrated Manufacturing priority Oder number critical ratio (CR) 1 1B 8/11 2 2B 0 3 3B 9/8 Solution c: The rule identifies the job that is most behind schedule (the one with the lowest ratio) and the job most ahead of schedule (the one with the highest ratio). The rank order of the jobs by ratio makes sure that those behind schedule are performed first. 39。due date today sdateCRle ad ti m e re m aini ng??1B:(118110)/11=8/11。2B: (110110)/3=0。3B: (119110)/8=9/8 ComputerIntegrated Manufacturing priority Oder number slack 1 1B 1 2 3B 3 3 2B 4 Solution d: The rule identifies the job that is most behind schedule (the smallest or most negative value) and the job most ahead of schedule (the largest or most positive value). The rank order of the jobs by slack value (smallest to largest) makes sure that the jobs with too little slack time are performed first. This priority rule addresses the sequencing of jobs based on the value of work remainaining. 1B:1181109=1。 2B:1161102=4。 3B:1191106=3 sl a c k ti m e 39。 si n r e m a ini ng tim edue date today s date proc e s g? ? ? ComputerIntegrated Manufacturing priority Oder number slack per operation 1 1B 2 3B 1 3 2B 4 Solution e: The rule identifies the job that is most behind schedule (the one with the lowest ratio) and the job most ahead of schedule (the one with the highest ratio). The rank order of the jobs by ratio makes sure that the jobs with insufficient operations slack are performed first. 1B:1/4=1/4。 2B:4/1=4。 3B:3/3=1 slack per operation (S/O) = slack time / operations remaining ComputerIntegrated Manufacturing priority Oder number slack per operation 1 1B 2 3B 3 2B 8 Solution f: The rule identifies the job that is most behind schedule (the one with the lowest ratio) and the job most ahead of schedule (the one with the highest ratio). The rank order of the jobs by ratio makes sure that the jobs with insufficient operations slack are performed first. 1B:1/4=1/4。 2B:4/=8。 3B:3/2= queue ratio (QR) = slack time / standard scheduled queue time ComputerIntegrated Manufacturing priority Oder number order due date 1 2B 116 2 1B 118 3 3B 119 Solution g: The rule schedules order priority using the order due date。 as a result, the process works to maximize the number of ontime deliveries. ComputerIntegrated Manufacturing 演講完畢,謝謝觀看!
點(diǎn)擊復(fù)制文檔內(nèi)容
范文總結(jié)相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1