【正文】
cessories installation, valve installation direction and location, pipe flushing, pipe cradle painting, overburden depth of buried pipe.(5)、Indoor drainage system: drainage system pipe and accessories installation, storm pipe and accessories installation, pipe installation slop, cradle and hanging bracket fixing, drainage branch vent installation.(6)、sanitary fixture installation, sanitary fixture water supply accessories installation, sanitary fixture drainage pipe installation.(7)、Refrigeration system: chiller installation, refrigerant pipe and accessories installation ,cooling accessories installation cradle and hanging bracket fixing ,pipe and equipment corrosion, thermal insulation ,system debug.(8)、Airconditioning water system pipe and accessories, water pressure test, pipe corrosion and thermal insulation, cradle and hanging bracket fixing, system debug.(9)、Valve leak test ,valve installation direction and location(10)、Storm sewer system: siphon water bucket installation, rainwater pipes and fittings installation4.建筑電氣驗收計劃:隱檢項目:動力站屋頂照明管暗敷設(shè)焊接及接地連接、煙感感溫探測器模塊及報警器暗管敷設(shè)、屋面接閃器焊接;航站樓接地引下線焊接;接地安全。變配電室:變壓器、箱式變電所安裝,成套配電柜、控制柜(屏、臺)和動力、照明配電箱(盤)安裝,裸母線、封閉母線、插接式母線安裝,電纜溝內(nèi)和電纜豎井內(nèi)電纜敷設(shè),電纜頭制作、導(dǎo)線連接和線路電氣試驗,接地裝置安裝,避雷引下線和變配電室接地干線敷設(shè)。供電干線:裸母線、封閉母線、插接式母線安裝,橋架安裝和橋架內(nèi)電纜敷設(shè),電纜溝內(nèi)和電纜豎井內(nèi)電纜敷設(shè),電線、電纜穿管和線槽敷線,電纜頭制作、導(dǎo)線連接和線路電氣試驗電氣動力: 成套配電柜、控制柜(屏、臺)和動力、照明配電箱(盤)及安裝,低壓電動機(jī)、電加熱器及電動執(zhí)行機(jī)構(gòu)檢查、接線,低壓電氣動力設(shè)備檢測、試驗和空載試運行,橋架安裝和橋架內(nèi)電纜敷設(shè),電線、電纜導(dǎo)管和線槽敷設(shè),電線、電纜穿管和線槽敷線,電纜頭制作、導(dǎo)線連接和線路電氣試驗,插座、開關(guān)、風(fēng)扇安裝房產(chǎn)論壇,裝修論壇,業(yè)主論壇( _/ g$ ~6 s. pamp。 A$ u電氣照明安裝:成套配電柜、控制柜(屏、臺)和動力、照明配電箱(盤)安裝,電線、電纜導(dǎo)管和線槽敷設(shè),電線、電纜導(dǎo)管和線槽敷線,槽板配線,鋼索配線,電纜頭制作、導(dǎo)線連接和線路電氣試驗,普通燈具安裝,專用燈具安裝,插座、開關(guān)、風(fēng)扇安裝,建筑照明通電試運行備用和不間斷電源安裝:成套配電柜、控制柜(屏、臺)和動力、照明配電箱(盤)安裝,柴油發(fā)電機(jī)組安裝,不間斷電源的其它功能單元安裝,裸母線、封閉母線、插接式母線安裝,電線、電纜導(dǎo)管和線槽敷設(shè),電線、電纜導(dǎo)管和線槽敷線,電纜頭制作、導(dǎo)線連接和線路電氣試驗,接地裝置安裝房產(chǎn)論壇,裝修論壇,業(yè)主論壇% Y39。 G$ f) G3 N( ]防雷及接地安裝:接地裝置安裝,避雷引下線和變配電室接地干線敷設(shè),建筑物等電位連接 建筑設(shè)備監(jiān)控系統(tǒng): 空調(diào)與通風(fēng)系統(tǒng),變配電系統(tǒng),照明系統(tǒng),給排水系統(tǒng),熱源和熱交換系統(tǒng),冷凍和冷卻系統(tǒng),電梯和自動扶梯系統(tǒng),火災(zāi)報警及消防聯(lián)動系統(tǒng)。新浪樂居論壇4 u6 T R4.Building electrical engineering acceptance inspection plan:Concealed work inspection item :power house roof lighting system concealed pipe welding and earthing connection, Smoke temperature detector module and alarm concealed pipe ,roof lightning arrester welding, terminal building lighting conduction welding safety ground electric control room :transformer and box substation installation。 plete distribution cabinets, control cabinets , and power, lighting distribution box (board) installation, bare bus bar, enclosed busbar, Plugin busbar installation, laying cable in cable trench and cable shafts cable terminal fabrication, wire connection and electrical test, grounding device installation lighting downlead conduction and grounding main laying in electric control room.Power supply main:Bare busbar,enclosed busbar and plugin busbar installation,cable bridge installation and laying cable on cable bridge,cable laying in cable trench and cable silo,wire、cable protective pipe and cable trunking laying, cable terminal fabrication、wire connection and electric test .electric power :plete distribution cabinet, control cabinet , power and lighting distribution box(board) installation,low voltage motor, wire, low voltage electric equipment detection, testing and noload work trial,cable bridge installation and cable laying on cable bridge, wire, cable protective pipe and cable trunking laying, cable terminal fabrication、wire connection and electric test,socket、switch、fan electric lighting:plete distribution cabinet、control cabinet and power ,lighting distribution box。 wire ,cable protective pipe and cable trunking laying, cable terminal fabrication、wire connection and electric test, mon lighting fixture installation. special lighting installation,socket、switch、fan installation,Building lighting electricity missioning, spare and uninterruptable power output installation, diesel motor installation , uninterruptable power output anxiliarys installation, bare busbar, enclosed busbar, plugin busbar。 wire ,cable protective pipe and cable trunking laying, cable terminal fabrication, wire connection and electric test, earthing device installation.lighting prevention and earthing installation:earthing devices installation,lighting downlead conduction and electric control room power main laying and ground main line laying in electric control room,equipotential system connected to monitoring system:ventilation and airconditioning system,power distributor system,lighting system,water supply and drainage,heat source and heat exchange system,refrigeration and cooling system,elevator and escalator system,fire alarm and bined fire system。5.通風(fēng)與空調(diào)驗收計劃:(1)、送排風(fēng)系統(tǒng):風(fēng)管與配件制作;風(fēng)管系統(tǒng)安裝;空氣處理設(shè)備安裝;部件制作;消聲設(shè)備制作與安裝,風(fēng)管與設(shè)備防腐;風(fēng)機(jī)安裝;系統(tǒng)調(diào)試。 [4 j9 {(2)、防排煙系統(tǒng):風(fēng)管與配件制作;部件制作;風(fēng)管系統(tǒng)安裝;防、排煙風(fēng)口常閉正壓風(fēng)口與設(shè)備安裝;風(fēng)管與設(shè)備防腐;風(fēng)機(jī)安裝;系統(tǒng)調(diào)試。(3)、空調(diào)風(fēng)系統(tǒng):風(fēng)管與配件制作;部件制作;風(fēng)管系統(tǒng)安裝,空氣處理設(shè)備安裝;消聲設(shè)備制作與安裝;風(fēng)管與設(shè)備防腐;風(fēng)機(jī)安裝;風(fēng)管與設(shè)備絕熱;系統(tǒng)調(diào)試。39。 L5 c z% b! qB/ I: M(4)、凈化空調(diào)系統(tǒng):風(fēng)管與配件制作;部件制作;風(fēng)管系統(tǒng)安裝;空氣處理設(shè)備安裝;消聲設(shè)備制作與安裝;風(fēng)管與設(shè)備防腐;風(fēng)機(jī)安裝;風(fēng)管與設(shè)備絕熱;高效過濾器安裝;系統(tǒng)調(diào)試房產(chǎn)論壇,裝修論壇,業(yè)主論壇, i w1 ^ Y(5)、制冷系統(tǒng):制冷機(jī)組安裝;制冷劑管道及配件安裝;制冷附屬設(shè)備安裝;管道及設(shè)備的防腐與絕熱;系統(tǒng)調(diào)試空調(diào)水系統(tǒng):管道冷熱(媒)水系統(tǒng)安裝;冷卻水系統(tǒng)安裝;冷凝水系統(tǒng)安裝;閥門及部件安裝;冷卻塔安裝;水泵及附屬設(shè)備安裝;管道與設(shè)備的防腐與絕熱;系統(tǒng)調(diào)試。(6).穿墻樓板套管。5.Ventilation system and airconditioning system acceptance inspection plan:(1)、air supply and exhaust system : Vent pipe and accessories fabrication;vent pipe installation;air treatment equipment installation;auxiliary fabrication;muffler equipment fabrication,vent pipe and equipment corrosion;fan installation, system debug.(2)、Smoke control and extraction system: vent pipe and accessories fabrication;auxiliary fabrication;vent pipe installation;smoke control and extraction formly closed positive pressure tuyere and equipment installation;vent pipe and equipment corrosion;fan installation, system debug.(3)、Airconditioning wind system: vent pipe and accessories fabrication;auxiliary fabrication;vent pipe installation;air treatment equipment installation ;muffler fabrication and