freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

室外電氣照明施工方案-資料下載頁

2024-11-03 08:26本頁面

【導(dǎo)讀】膂葿螞肆芅蚅薈肅蕆蒈羆肄膇螃袂肅艿薆螈肂莁螂蚄肁蒃薄羃肀膃莇衿膀芅薃螅腿莈蒞蟻膈肇薁蚇膇芀莄羆膆莂蠆袂膅蒄蒂螈膅膄蚈蚄膄芆蒀芃荿蚆袈節(jié)蒁葿螄芁膁蚄螀袈莃薇蚆袇蒅螂羅袆膅薅袁裊芇螁螇襖荿薃蚃羃蒂莆羈膁薂袇芄蒞袃羈蒆蝕蝿羀膆蒃蚅罿羋蚈羄羈莀蒁袀羇蒃蚇螆肆膂葿螞肆芅蚅薈肅蕆蒈羆肄膇螃袂肅艿薆螈肂莁螂蚄肁蒃薄羃肀膃莇衿膀芅薃螅腿莈蒞蟻膈肇薁蚇膇芀莄羆膆莂蠆袂膅蒄蒂螈膅膄蚈蚄膄芆蒀芃荿蚆袈節(jié)蒁葿螄芁膁蚄螀袈莃薇蚆袇蒅螂羅袆膅薅袁裊芇螁螇襖荿薃蚃羃蒂莆羈膁薂袇芄蒞袃羈蒆蝕蝿羀膆蒃蚅罿羋蚈羄羈莀蒁袀羇蒃蚇螆肆膂葿螞肆芅蚅薈肅蕆蒈羆肄膇螃袂肅艿薆螈肂莁螂蚄肁蒃薄羃肀膃莇衿膀芅薃螅腿莈蒞蟻膈肇薁蚇膇芀莄羆膆莂蠆袂膅蒄蒂螈膅膄蚈蚄膄芆蒀芃荿蚆袈節(jié)蒁葿螄芁膁蚄螀袈莃薇蚆袇蒅螂羅袆膅薅袁裊芇螁螇襖荿薃蚃羃蒂莆羈膁薂袇芄蒞袃羈蒆蝕蝿羀膆蒃蚅罿羋蚈羄羈莀蒁袀羇蒃蚇螆肆膂葿螞肆芅蚅薈肅蕆蒈羆肄膇螃袂肅艿薆螈肂莁螂蚄肁蒃

  

【正文】 ickness of it should be taken into account to avoid lighting tubes and junction boxes from being embedded in the fireproof coat. The lengths of supports in one area should be equal. 22 照明支架的鉆孔直徑由管徑及所使用“ U”型卡子的直徑確定。 The drilling hole diameter of lighting support shall be decided by pipe diameter and “ U” clip used. 23 照明燈具安裝前應(yīng)進(jìn)行組裝、接線和試亮,燈頭接線采用的導(dǎo)線規(guī)格符合設(shè)計(jì)要求,接線應(yīng)采用不同顏色的導(dǎo)線來區(qū)分相線和零線,螺紋燈頭的相線應(yīng)接在中心端子上。帶電池的應(yīng)急燈應(yīng)進(jìn)行放電試驗(yàn),應(yīng)急燈的持續(xù)放電時間為 30分鐘,必須符合設(shè)計(jì)和產(chǎn)品說明書的要求。 Prior to lighting lamp installation, make assembly, connection and lighting test。 the lead specification for lamp connection should meet the design requirement。 use different colors of leads for connection to differentiate the hot wire from the neutral one. The hot wire of a thread lamp should be connected to the central terminal。 discharge test shall be made for emergency lamps with batteries. The lasting discharge time should be 30 minutes and must meet the design and description. 照明箱安裝 Lighting box installation 31 照明箱定位應(yīng)依據(jù)設(shè)計(jì)照明平面圖的要求,不得隨意移動位置。 The lighting box positions must meet the requirements the lighting plans。 don’t change the position at will。 32 照明箱安裝在框架的鋼柱上時應(yīng)留有防火層的間隙。 When lighting boxes are installed on the steel poles of frames, the clearance for fireproof coat must be reserved. 33 照明箱安裝時中心距地面 米,安裝的標(biāo)高為符合設(shè)計(jì)要求,垂直度不應(yīng)超過 ?。 as for the lighting box installation, the distance from the center to the ground shall be and the installation elevation should meet the design requirement and the perpendicularity shall be within ? . 34 照明箱安裝過程中要注意保護(hù)照明箱上的開關(guān)把手。 During the installation, pay attention to protect the switch handles of lighting boxes. 配管 Piping 鋼管切斷采用無齒鋸、鋼鋸、割管器等工具。切斷時用力均勻,切斷口用銼刀或絞刀銼光(或刮光)使管口整齊光滑。 Use speed cutters, hacksaws and pipe cutters to cut steel pipes。 the cutting force must be equal and the cut mouth shall be filed by a fire or drift.
點(diǎn)擊復(fù)制文檔內(nèi)容
環(huán)評公示相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1