【正文】
80.[5] Alexia Nalewaik,Valerie Benefits of Building Green[J].Cost Engineering, 2009, 50(1):2935.[6] Jia Zu, ZhenYu Zhao. Green building research–current status and future agenda: A review [J].Renewable and Sustainable Energy Reviews, 2014(30):271281.[7] Hadas Gabay, Isaac A. Meir,Moshe Schwartz,Elia Werzberger. Costbenefit analysis of green buildings: An Israeli office buildings case study[J].Energy and Buildings, 2014, 76(6):558564.[8] Fabricio Bianchini, Kasun Hewage. Probabilistic social costbenefit analysis for green roofs: A lifecycle approach[J].Building and Environment, 2012(58):152162.[9] . Issa, . Rankin, . Christian. Canadian practitioners’ perception of research work investigating the cost premiums, longterm costs and health and productivity benefits of green buildings[J].Building and Environment, 2010(45):16981711.[10] Abdelrahman Osman Elfaki, Saleh Alatawi, Eyad Abushandi. Using Intelligent Techniques in Construction Project Cost[J].Advances in Civil Engineering, 2014(2014):111.[11] Gwang Hee Kim, JaeMin Shin, Sangyong Kim, Yoonseok Shin. Comparison of School Building Construction Costs Estimation Methods Using Regression Analysis, Neural Network, and Support Vector Machine[J].Journal of Building Construction and Planning Research, 2013(01):17.[12] Minh Tu, Cao,Min Yuan and YuWei Wu. Cheng, Hybrid Computational Model for Forecasting Taiwan Construction Cost Index [J].Constr. Eng. Manage, 2015, 141(4):111.[13] Bilin Shao, Jieqiong Wu. The Implicit Cost Function Model Research Based on ABC in Construction Engineering[C].2010 3rd International Conference on Information Management, Innovation Management and Industrial Engineering. IEEE Conference Publications, 2010:417420.[14] Yuan Fang and S. Thomas Ng. Applying activitybased costing approach for construction logistics cost analysis[J]. Construction Innovation, 2011, 11(3):259281.[15] Phuwadol Samphaongoen. A VISUAL APPROACH TO CONSTRUCTION COST ESTIMATING [D]. Marquette University, 2010.[16] Abdelhak Challal, Mohamed Tkiouat. The Design of Cost Estimating Model of Construction Project: Application and Simulation[J].Open Journal of Accounting, 2012(1):1526.[17] 馬素貞,孫大明,[J].建筑科學(xué),2010, (6):9194.[18] 孫大明,[N].中國房地產(chǎn)報, (D04).[19] 閆晶,鄭朝鋒,王梓霖,[J].建筑節(jié)能, 2013(9):7274.[20] [J].建筑施工, 2011(3):208209.[21] 郭慶軍,[J].建筑經(jīng)濟, 2012(10):9396.[22] 吳 [J].建筑, 2014(12):2629.[23] 李攀,李宴慶,—長安萬科中心項目[J].價值工程, 2015(17):9195.[24] *[J].計算機與數(shù)字工程, 2009(11):5457.[25] 宋紅賓,劉志勇,[J].河北建筑工程學(xué)院學(xué)報, 1999, 17(4):1215.[26] 錢穎,李立新,[J].價值工程, 2010(34):7576.[27] [J].當(dāng)代建設(shè), 2010(12):2829.[28] 張洋,李明, 在工程項目成本計算中的應(yīng)用[J].北京交通大學(xué)學(xué)報, 2013, 40(2):4749.[29] BonGang Hwang, Zong Bao Yeo. Perception on benefits of construction waste management in the Singapore construction industry [J]. Engineering, Construction and Architectural Management, 2011, 18(4):394406.[30] Michail Soutos David J. Lowe. Elemental cost estimating: current UK practice and procedure[J].Journal of Financial Management of Property and Construction, 2011, 16(2):147162.[31] 孫 簡,[J].施工企業(yè)管理, 2013(8):2023.[32] 劉楊,范永法,[J].施工技術(shù), 2010, 44(10):6971.[33] [J].成本管理, 2014(27):2832.[34] [J].成本控制, 2008(1):2225.[35] [J].大連工學(xué)院學(xué)報, 1985(3):9396.[36] 許家雄,[J].科技廣場, 2010(9):192194.[37] 程衛(wèi)國,馮峰,姚東, [M]., 1999.第 18頁