【文章內(nèi)容簡介】
STA確定了節(jié)拍生產(chǎn)的數(shù)量 (總成 ),默認(rèn) 300件 。 。 Job 1 Location (final site line) Production parts are manufactured at the production site using the production tooling, gauging, process, material, operators, environment, and process settings (. feeds/speeds/cycle times/pressures/temperature). All process parameters must be previously identified before the RunatRate event via specific trial runs Required Input 批量生產(chǎn)的場地 ※ ,并且和批量生產(chǎn)一致 。 ,包括:生產(chǎn)線 /模具 /檢具 /輔具 /過程 /材料 /操作工 /環(huán)境 /過程配置(如進(jìn)刀量、速度、 CT、壓力、溫度等等) 。 RunRate之前的供應(yīng)商內(nèi)部試生產(chǎn)中被驗證達(dá)到預(yù)定要求。 Required Input Production Process including control plan, flow diagram instructions process parameters [PPAP 5,6,7] 1) Supplier shall have a process flow diagram that clearly describes the production process steps and sequence. 2) Supplier shall have a Process FMEA (consistent with Ford FMEA Handbook current edition) developed in accordance with and pliant with ISO/TS 16949 current edition. 生產(chǎn)過程 ※ /物料流向圖 ,清楚地描述了實際的生產(chǎn)步驟和順序 ,并和實際一致 。 ※ 。 ※ ( Prelaunch Controp Plan)計劃已經(jīng)完成且為最新狀態(tài),與 ProductionControl Plan區(qū)別一般僅在檢查頻次 。 \模具 \工裝 \夾具 \量具 \檢具 \輔具已經(jīng)具備,同量產(chǎn)狀態(tài)完全一致。 生產(chǎn)過程 ,所有工位的檢測指導(dǎo)書已經(jīng)完成 。 \流程圖 \控制計劃 \作業(yè)指導(dǎo)書能夠體現(xiàn)鏈接關(guān)系。且于實際生產(chǎn)過程相符 。 。 。標(biāo)準(zhǔn) /頻次等和控制計劃一致 。 。 Production Tools, Facilities Gauging [PPAP 8,16,17] Supplier shall identify facility tool and gauges that are additional, new, refurbished or relocated and the resources required to produce the product at