freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

新產(chǎn)品導(dǎo)入程序管理(編輯修改稿)

2025-03-29 00:37 本頁面
 

【文章內(nèi)容簡介】 i ECR/ECO plan: PDM and product engineer should control this plan. PM have to concern about once the engineering change would cause cost change. So, to define an ECR/ECO handling procedure and cost control process are necessary. j CPM analysis and backup solution consideration: CPM:Critical Path Method When all plans were ready, PM should have a review to all these activities as a bystage eout. We title the review meeting as “planning review” or “startup review”. The purpose is to make sure all activities are under control and running as what we expected. Following here are some Items which are critical and need high attention in the review meeting: NO. Critical Items a General Information b Supply chain management c Production line setting d Quality e Other problem ? General Information: customer milestone capacity volume dedicated project personnel ? Supply Chain Management: the focus is on procurement management and ponent coding (or BOM coding). Before the meeting, Material people should review the BOM and check out which ones are critical ponents. The critical ponent mainly means suppliercontrolled market and/or highvalue unique ponent. ? Production Line Setting: SMT package (Gerber, XY, PCN drawing) assembly process packing requirement (domestic and export) traceability testing software and hardware tooling preparation delivery method cosmetic specification and checking method plant layout operator training and shift arrangement ? Quality: control plan and flow chart, environment audit process audit GRR golden sample trial run premises process qualification requirement
點(diǎn)擊復(fù)制文檔內(nèi)容
教學(xué)課件相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖片鄂ICP備17016276號-1