【文章內(nèi)容簡介】
authorization of certified National Plant quarantine authorities/protection organization of exporting country or region. The sample of the “IPPC” mark and number shall be showed on this Beneficiary’s certificate.11. Shipment: CIF Terms The sellers shall the modity from the port of shipment within the shipment time for shipment to the port of destination. Transshipment is not allowed. Partial shipment is not allowed. The contracted modity shall not be carried by a vessel flying the flag of a country which the Buyers cannot accept.12. Inspection and Claims: a. Under the presence of the classification society’s representative Seller will carry out an Acceptance Test Run of the engine on its test bed to verify the data as specified in this Contract. Sellers has to inform Buyer about the date of this Acceptance Test Run twenty days in advance and to provide a corresponding testing program. Buyer is entitled to attend the Acceptance Test Run at his own expense.Seller shall issue a test certificate. To the extent not covered by the test, Manufacturer shall, before making delivery, make a precise and prehensive inspection of the goods as regards their quantity, quality and weight and issue a Certificate certifying that the goods are in conformity with stipulation of this Contract。b. Within 30 days after arrival of the goods at the port of destination, the buyer shall apply to Ningbo Import amp。Export modity Inspection amp。quarantine Bureau of P. R. China for the final inspection of the goods in respect of their quality, quantity and weight. If any discrepancies are found by the inspection bureau regarding the quality, quantity and weight expect those for which the Seller is responsible, the buyers shall have right to claim shall be regarded as accepted if the sellers fail to reply within 30 days after receipt of the Buyers’ claim.13. Settlement of Claims:In case a claim is lodged by the Buyers within the period of claim as stipulated in clause 12 of this Contract, which is based on failures in design, workmanship or material, the Sellers shall settle the claim by:Repair or replace the defective goods with new ones which conform to the specifications, quality and performance as stipulated in this Contract and bear all expenses incurred for repair/replacement incl. dispatch, as well as reasonable costs of removal and installation of Equipment, further, if under consideration of the individual case this can be reasonably demanded, the costs of necessary services of his mechanics and assistants. The guarantee period of repair or replacement goods shall also be 13 months as specified in Clause 12 of this Contract from the date on which the newbuilt ship be delivered to the ship owner or 26 months counting from the date on which the modity arrives at the port of destination, whichever is earlier. In case the defective goods are found, the Seller must replace it within 30 days after receiving the Buyer’s written notice, unless th