freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

contract合同-全文預(yù)覽

2025-01-12 17:03 上一頁面

下一頁面
  

【正文】 ternational Chamber of Commerce by three arbitrators appointed in accordance with said Rules: Proceedings and the award shall be in the English language. The Arbitration shall take place in Zurich, Switzerland and the decision of the Arbitration Committee shall be final and binding upon both parties, neither party shall seek recourse to a law court or other authorities to appeal for revision of the decision. Arbitration fee shall be borne by the losing party.18. Effectiveness of This Contract:The contract shall e into force when signed by the three parties.19. Limitation of LiabilitySeller shall in on case be liable for any indirect, incidental or consequential damages including, but not limited to loss of profits, loss of revenue, cost of capital, damage which does not arise at Equipment itself and claims of third parties suffered or incurred by Buyer.20 Note:1) The attachment 1 to 2 of contract shall from an integral part of the contract and have the same effectiveness as the contract.2) With the exception of what expressed and indicated in the contract, the trade terms hereof are subject to ICC INCOTERMS 2000.3) Any original document(s) made by rephotographic system, automated or puterized system or carton copied shall not be acceptable unless they are clearly marked as “ORIGINAL” and certified with signature in hand writing by authorized officers of the issuing pany of corporation.4) Stale bills of loading and Short Form of loading shall not be acceptable.5) AttachmentsAttachment 1: Additional Articles for contract Attachment2: Technical Agreement.The contract is signed by three parties in three original.BUYER: SELLER:Evergreen industries group A/SZhejiang Shipbuilding Co.,Ltd.第 6 頁 共 6 頁。b. Within 30 days after arrival of the goods at the port of destination, the buyer shall apply to Ningbo Import amp。 Otherwise Seller is released from its warranty obligations.With the engine package, the lifting device should be delivered which shall remain property of Seller and be returned DDU Seller’s premises in due time after installation of the engine.Following documents shall be enclosed in each package:Detail packing list in 2 copies issued by the Manufacturers/ Seller indicating the number, content, measurement, net and gross weight of each package.8. Insurance:To be covered by the Sellers for 110% of Delivered Goods Value.9. Payment:As per the attachment 1 of this contract.10. Documents:1) 3 original mercial invoice and 3 copies indicating sold to Evergreen industries group, indication contract number L/C number and shipping mark mad out in details as per the related contract.The sellers should supply an additional set of original mercial invoice to Zhejiang Shipbuilding Co., Ltd.2) Bill of Lading2/3 sets of on board ocean bills of lading in original and copies marked “Freight Prepaid” made ou
點(diǎn)擊復(fù)制文檔內(nèi)容
合同協(xié)議相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1