freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

美國(guó)鋼鐵工業(yè)大氣污染物排放標(biāo)準(zhǔn)subparteeeee—nationalemissionstandardsforhazardousairpollutantsforironandsteel(編輯修改稿)

2024-09-19 13:45 本頁面
 

【文章內(nèi)容簡(jiǎn)介】 ction, or prepare and implement a plan for the selection and inspection of scrap according to the requirements in paragraph (c) of this section. You may have certain scrap subject to paragraph (b) of this section and other scrap subject to paragraph (c) of this section at your facility provided the scrap remains segregated until charge makeup.(b) You must prepare and operate at all times according to a written certification that the foundry purchases and uses only metal ingots, pig iron, slitter, or other materials that do not include postconsumer automotive body scrap, postconsumer engine blocks, postconsumer oil filters, oily turnings, lead ponents, mercury switches, plastics, or free organic liquids. For the purpose of this paragraph (b), “free organic liquids” is defined as material that fails the paint filter test by EPA Method 9095A, “Paint Filter Liquids Test” (Revision 1, December 1996), as published in EPA Publication SW–846 “Test Methods for Evaluating Solid Waste, Physical/Chemical Methods” (incorporated by reference—see 167。). Any postconsumer engine blocks, postconsumer oil filters, or oily turnings that are processed and/or cleaned to the extent practicable such that the materials do not include lead ponents, mercury switches, chlorinated plastics, or free organic liquids can be included in this certification.(c) You must prepare and operate at all times according to a written plan for the selection and inspection of iron and steel scrap to minimize, to the extent practicable, the amount of organics and HAP metals in the charge materials used by the iron and steel foundry. This scrap selection and inspection plan is subject to approval by the Administrator. You must keep a copy of the plan onsite and readily available to all plant personnel with materials acquisition or inspection duties. You must provide a copy of the material specifications to each of your scrap vendors. Each plan must include the information specified in paragraphs (c)(1) through (3) of this section.(1) A materials acquisition program to limit organic contaminants according to the requirements in paragraph (c)(1)(i) or (ii) of this section, as applicable.(i) For scrap charged to a scrap preheater, electric arc metal melting furnace, or electric induction metal melting furnace, specifications for scrap materials to be depleted (to the extent practicable) of the presence of used oil filters, chlorinated plastic parts, organic liquids, and a program to ensure the scrap materials are drained of free liquids。 or(ii) For scrap charged to a cupola metal melting furnace, specifications for scrap materials to be depleted (to the extent practicable) of the presence of chlorinated plastic, and a program to ensure the scrap materials are drained of free liquids.(2) A materials acquisition program specifying that the scrap supplier remove accessible mercury switches from the trunks and hoods of any automotive bodies contained in the scrap and remove accessible lead ponents such as batteries and wheel weights. You must either obtain and maintain onsite a copy of the procedures used by the scrap supplier for either removing accessible mercury switches or for purchasing automobile bodies that have had mercury switches removed, as applicable, or document your attempts to obtain a copy of these procedures from the scrap suppliers servicing your area.(3) Procedures for visual inspection of a representative portion, but not less than 10 percent, of all ining scrap shipments to ensure the materials meet the specifications.(i) The inspection procedures must identify the location(s) where inspections are to be performed for each type of shipment. Inspections may be performed at the scrap supplier39。s facility. The selected location(s) must provide a reasonable vantage point, considering worker safety, for visual inspection.(ii) The inspection procedures must include recordkeeping requirements that document each visual inspection and the results.(iii) The inspection procedures must include provisions for rejecting or returning entire or partial scrap shipments that do not meet specifications and limiting purchases from vendors whose shipments fail to meet specifications for more than three inspections in one calendar year.(iv) If the inspections are performed at the scrap supplier39。s facility, the inspection procedures must include an explanation of how the periodic inspections ensure that not less than 10 percent of scrap purchased from each supplier is subject to inspection.(d) For each furan warm box mold or core making line in a new or existing iron and steel foundry, you must use a binder chemical formulation that does not contain methanol as a specific ingredient of the catalyst formulation as determined by the Material Safety Data Sheet. This requirement does not apply to the resin portion of the binder system.(e) For each scrap preheater at an existing iron and steel foundry, you must meet either the requirement in paragraph (e)(1) or (2) of this section. As an alternative to the requirement in paragraph (e)(1) or (2) of this section, you must meet the VOHAP emissions limit in 167。(a)(9).(1) You must operate and maintain a gasfired preheater where the flame directly contacts the scrap charged。 or(2) You must charge only material that is subject to and in pliance with the scrap certification requirement in paragraph (b) of this section.(f) For each scrap preheater at a new iron and steel foundry, you must charge only material that is subject to and in pliance with the scrap certification requirement in paragraph (b) of this section. As an alternative to this requirement, you must meet the VOHAP emissions limit in 167。(a)(9).[69 FR 21923, Apr. 22, 2004, as amended at 70 FR 29404, May 20, 2005。 73 FR 7218, Feb. 7, 2008]Operation and Maintenance Requirements167。What are my operation and maintenance requirements?(a) As required by 167。(e)(1)(i), you must always operate and maintain your iron and steel foundry, inclu
點(diǎn)擊復(fù)制文檔內(nèi)容
公司管理相關(guān)推薦
文庫(kù)吧 www.dybbs8.com
備案圖片鄂ICP備17016276號(hào)-1