freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

美國鋼鐵工業(yè)大氣污染物排放標(biāo)準(zhǔn)subparteeeee—nationalemissionstandardsforhazardousairpollutantsforironandsteel(留存版)

2025-10-07 13:45上一頁面

下一頁面
  

【正文】 plicable, according to the requirements in 167。 and each operation and maintenance requirement in 167。 and(ii) Mold vents that do not ignite automatically and cannot be ignited in the presence of an auxiliary ignition source more than 25 percent of the time are considered to be not ignitable.[69 FR 21923, Apr. 22, 2004, as amended at 73 FR 7218, Feb. 7, 2008]General Compliance Requirements167。s facility. The selected location(s) must provide a reasonable vantage point, considering worker safety, for visual inspection.(ii) The inspection procedures must include recordkeeping requirements that document each visual inspection and the results.(iii) The inspection procedures must include provisions for rejecting or returning entire or partial scrap shipments that do not meet specifications and limiting purchases from vendors whose shipments fail to meet specifications for more than three inspections in one calendar year.(iv) If the inspections are performed at the scrap supplier39。(g).(b) You must meet each operating limit in paragraphs (b)(1) through (5) of this section that applies to you.(1) You must install, operate, and maintain a capture and collection system for all emissions sources subject to an emissions limit for VOHAP or TEA in paragraphs (a)(8) through (11) of this section.(i) Each capture and collection system must meet accepted engineering standards, such as those published by the American Conference of Governmental Industrial Hygienists.(ii) You must operate each capture system at or above the lowest value or settings established as operating limits in your operation and maintenance plan.(2) You must operate each wet scrubber applied to emissions from a metal melting furnace, scrap preheater, pouring area, or pouring station subject to an emissions limit for PM or total metal HAP in paragraphs (a)(1) through (6) of this section such that the 3hour average pressure drop and scrubber water flow rate does not fall below the minimum levels established during the initial or subsequent performance test.(3) You must operate each bustion device applied to emissions from a cupola metal melting furnace subject to the emissions limit for VOHAP in paragraph (a)(8) of this section, such that the 15minute average bustion zone temperature does not fall below 1,300 degrees Fahrenheit ( 176。What is the purpose of this subpart?This subpart establishes national emission standards for hazardous air pollutants (NESHAP) for iron and steel foundries. This subpart also establishes requirements to demonstrate initial and continuous pliance with the emissions limitations, work practice standards, and operation and maintenance requirements in this subpart.167。When do I have to ply with this subpart?(a) Except as specified in paragraph (b) of this section, if you have an existing affected source, you must ply with each emissions limitation, work practice standard, and operation and maintenance requirement in this subpart that applies to you no later than April 23, 2007. Major source status for existing affected sources must be determined no later than April 23, 2007.(b) If you have an existing affected source, you must ply with the work practice standards in 167。F). Periods when the cupola is off blast and for 15 minutes after going on blast from an off blast condition are not included in the 15minute average.(4) You must operate each bustion device applied to emissions from a scrap preheater subject to the emissions limit for VOHAP in paragraph (a)(9) of this section or from a TEA cold box mold or core making line subject to the emissions limit for TEA in paragraph (a)(11) of this section, such that the 3hour average bustion zone temperature does not fall below the minimum level established during the initial or subsequent performance test.(5) You must operate each wet acid scrubber applied to emissions from a TEA cold box mold or core making line subject to the emissions limit for TEA in paragraph (a)(11) of this section such that:(i) The 3hour average scrubbing liquid flow rate does not fall below the minimum level established during the initial or subsequent performance test。s facility, the inspection procedures must include an explanation of how the periodic inspections ensure that not less than 10 percent of scrap purchased from each supplier is subject to inspection.(d) For each furan warm box mold or core making line in a new or existing iron and steel foundry, you must use a binder chemical formulation that does not contain methanol as a specific ingredient of the catalyst formulation as determined by the Material Safety Data Sheet. This requirement does not apply to the resin portion of the binder system.(e) For each scrap preheater at an existing iron and steel foundry, you must meet either the requirement in paragraph (e)(1) or (2) of this section. As an alternative to the requirement in paragraph (e)(1) or (2) of this section, you must meet the VOHAP emissions limit in 167。 that applies to you where initial pliance is not demonstrated using a performance test, you must demonstrate initial pliance no later than 30 calendar days after the pliance date that is specified for your iron and steel foundry in 167。(e)(1) and the conditions specified in paragraphs (b) through (i) of this section.(b) To determine pliance with the applicable emissions limit for PM in 167。(a)(2)(ix).(d) If you menced construction or reconstruction between December 23, 2002 and April 22, 2004, and you chose to ply with the proposed emissions limit when demonstrating initial pliance, you must conduct a second performance test to demonstrate pliance with the promulgated emissions limit by October 19, 2007 or after startup of the source, whichever is later, according to 167。 or(2) You must charge only material that is subject to and in pliance with the scrap certification requirement in paragraph (b) of this section.(f) For each scrap preheater at a new iron and steel foundry, you must
點擊復(fù)制文檔內(nèi)容
公司管理相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1