freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

淺析音視頻認證實施規(guī)則(英文版)(編輯修改稿)

2024-07-22 11:58 本頁面
 

【文章內(nèi)容簡介】 facturing premises. Conclusions of factory inspectionThe inspection team submits conclusions of factory inspection to the certification body. The factory should take correction action within the stipulated time limit when nonconformity item exists during the factory inspection. The certification body will verify the validity of the correction action with appropriate methods. Conclusions of factory inspection will be unqualified when correction action is unpleted within the time limit. Evaluation and approval of certification results Evaluation and approval of certification results The certification body is responsible for the general evaluation of type testing results and conclusions of factory inspection. The certificate will be issued when the evaluation is qualified. The certification body will disapprove and terminate the application either the type testing result or factory inspection conclusions are unqualified Time frameTime frame for certification means the working days from the acceptance of application till the issuance of the certificates, which includes the time of type testing, factory inspection, reports submission after inspection, evaluation of certification results and approval of certificates, etc.Normally, the type testing takes 30 working days, not including the time for correction actions and retest of the nonconformity item(s). If the ponents are required to be tested and the required time exceeds that of appliances, the time of type testing should be calculated according to the longest test time of the ponent, counting upon the receipt of the samples and testing fees.The inspection reports should be submitted within 5 working days after the inspection. It will be counted from the day when the inspectors plete the inspection and receive the correction action reports from the factory on nonconformities satisfying the requirements.Normally, evaluating the certification results and approving the certificates shall be pleted within 5 working days. Followup surveillance Scope of followup surveillanceThe scope of followup surveillance includes the annual followup surveillance and also the effective followup investigation to the certified products conducted by the certification body. Annual followup surveillanceThe followup surveillance will be conducted without notifying the factory beforehand in principle. The manufacturing premises contracted with different manufacturers should accept the followup surveillance respectively.The factory should assure the certified product is in normal production during the followup surveillance. The certificate holder should undertake the followup surveillance on schedule, otherwise it’ll be regarded as rejection to the followup surveillance. The frequency of followup surveillanceThe followup surveillance shall normally be implemented 12 months after the first certificate being granted with a frequency of once per 12 months.The frequency of surveillance should be increased in any of the following cases:1) If serious quality problem arises with the certified product, or the certified product is plained by clients, which has been verified to be the responsibility of the certificate holder and/or the factory.2) The certification body doubts the conformity of the certified product against the requirements of safety and EMC standards with sufficient reasons. 3) Sufficient information indicates that the conformity or the consistency of certified products might be affected due to the changes in organization structure, production condition and the quality system of the manufacturer and/or factories. Contents of followup surveillanceThe followup surveillance includes: reassessment of factory quality assurance ability + checking of consistency of certified products, and if necessary, samples may be taken and tested at the testing laboratory, refer to clause ..The certification body shall implement the factory reassessment in accordance with Requirements for Factory Quality Assurance Ability (see Appendix V). The items 3, 4, 5 and 9 specified in Requirements for Factory Quality Assurance Ability must be assessed for each followup surveillance and the rest items may be selected. All the items of the Requirements shall be covered at least every four years. The contents of consistency checking for certificated product are identical with those of the initial factory inspection basically.At the same time, the checking shall be conducted according to “Testing requirements of factory quality control of pulsory certification of Telemunication Terminal Equipment” (see Appendix IV), together with checking use of “CCC” mark and certificates. Timing of the followup surveillanceThe duration of the followup surveillance shall be determined by the amounts of units of certified products with appropriate consideration of the production scale of the factory. It will normally take about 1 to 2 working days/p. Conclusions of the followup surveillanceThe inspection team submits the conclusion of the followup inspection to the certification body. When the followup inspection conclusion is unqualified, the inspection team submits directly to the certification body. The factory should take correction action within 40 working days when nonconformity item exists. The certification body will verify the validity of the correction action with appropriate methods. The conclusions of followup inspection will be unqualified when the correction action is unpleted within the time limit. Sampling amp。 testing after certified If necessary, the certified products should be sampled and tested. The samples shall be taken randomly from the qualified products of the factory (including those from the product line, the stock, and the market/sales agency). For the same category of product, only one sample is needed to be taken.The desi
點擊復制文檔內(nèi)容
化學相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖片鄂ICP備17016276號-1