freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

110kv蘇橋輸變可研報告(編輯修改稿)

2025-06-11 03:44 本頁面
 

【文章內(nèi)容簡介】 ere no more mountains in sight. The aircraft was able to fly over the endless white plains without difficulty. Lesson44 Through the forest 穿過森林Mrs Anne Sterling did not think of the risk she was taking when she ran through a forest after two men. They had rushed up to her while she was having a piic at the edge of a forest with her children and tried to steal her handbag. In the struggle, the strap broke and, with the bag in their possession, both men started running through the trees. Mrs Sterling got so angry that she ran after them. She was soon out of breath, but she continued to run. When she caught up with them, she saw that they had sat down and were going through the contents of the bag, so she ran straight at them. The men got such a fright that they dropped the bag and ran away. 39。The strap needs mending,39。 said Mrs Sterling later, 39。but they did not steal anything.39。Lesson45 A clear conscience 問心無愧The whole village soon learnt that a large sum of money had been lost. Sam Benton, the local butcher, had lost his wallet while taking his savings to the postoffice. Sam was sure that the wallet must have been found by one of the villagers, but it was not returned to him. Three months passed, and then one morning, Sam found his wallet outside his front door. It had been wrapped up in newspaper and it contained half the money he had lost, together with a note which said: 39。A thief, yes, 39。but only 5o per cent a thief!39。 Two金鄉(xiāng)110kV蘇橋輸變電工程可行性研究報告1設(shè)計依據(jù)、原則及范圍山東電網(wǎng)“十二五”規(guī)劃及2020年遠(yuǎn)景展望山東省電力工業(yè)統(tǒng)計資料匯編濟(jì)寧金鄉(xiāng)電網(wǎng)“十二五”發(fā)展規(guī)劃。 設(shè)計范圍和設(shè)計原則本可研報告按照《國家電網(wǎng)公司輸變電工程可行性研究內(nèi)容深度規(guī)定(試行)》的要求,在《山東電網(wǎng)“十一五”規(guī)劃及2020年遠(yuǎn)景展望》及濟(jì)寧及金鄉(xiāng)縣電網(wǎng)“十二五”發(fā)展規(guī)劃的基礎(chǔ)上,論證110kV蘇橋輸變電工程建設(shè)的必要性和建設(shè)規(guī)模,確定其合理的投產(chǎn)年限,提出接入系統(tǒng)方案、遠(yuǎn)景規(guī)模和本期規(guī)模,提出與本工程相關(guān)的系統(tǒng)二次方案,對新建變電站進(jìn)行工程選站,新建線路提出路徑選擇及工程設(shè)想,對站址及路徑方案經(jīng)技術(shù)經(jīng)濟(jì)比較提出推薦意見。并對輸變電項目進(jìn)行投資估算。 設(shè)計水平年本工程計劃2011年10月開工,2012年6月建成投產(chǎn)。設(shè)計水平年取2010年。2電力系統(tǒng)一次金鄉(xiāng)縣位于魯西南平原,地跨東經(jīng)116176。7′至116176。30′,北緯34176。54′至35176。40′.105國道貫穿縣境南北,境內(nèi)東西最大橫距26km。,耕地面積78萬畝。全縣13個鄉(xiāng)鎮(zhèn),659個行政村(居委會),??h域電網(wǎng)有220千伏變電站1座,容量150 +180MVA;110千伏變電站5座,;35千伏變電站15座,;其中公司產(chǎn)權(quán)的公共變電站共11座。 ,;10千伏配電線路1269km。金鄉(xiāng)電網(wǎng)以220kV緡城變的110kV緡彭線、110kV緡大線,110kV寧緡線,220kV魚臺變的110kV金魚線為主供電源。四座110kV變電站為樞紐,輻射到11座35kV變電站向全縣供電。截止2010年底全縣共有一處220kV變電站,主變?nèi)萘繛?30MVA/2臺;;五處110kV變電站,;;110kV金鄉(xiāng)變、彭井變、城西變、園區(qū)變?yōu)殡p電源,110kV大義變?yōu)閱坞娫垂╇姡还局睂?5kV變電站11處,主變22臺,;用戶35kV變電站5處,主變9臺。全縣35kV線路24條,;10kV配電線路67條。;其中網(wǎng)供最大負(fù)荷165MW。2010年金鄉(xiāng)縣電網(wǎng)地理接線示意圖詳見附圖1。電網(wǎng)存在的主要問題:目前金鄉(xiāng)城區(qū)供電任務(wù)主要由110kV金鄉(xiāng)變、110kV城西變及35kV城南變承擔(dān)。110kV城西變及35kV城南變主供縣城西部、南部區(qū)域及魚山鎮(zhèn)、開發(fā)區(qū)、雞黍鎮(zhèn)北部??h城東部區(qū)域主要為金鄉(xiāng)鎮(zhèn)東部和北部、化雨鄉(xiāng)和王丕鎮(zhèn)北部、高河鄉(xiāng)西部,目前該區(qū)域大蒜種植面積較多,臨近魚臺縣大蒜種植面積大幅度增加,大蒜收獲后主要在我縣東部區(qū)域進(jìn)行倉儲、加工,該區(qū)域已成為我縣大蒜倉儲、加工、集散中心之一,用電負(fù)荷急劇增長。2009年以來新一屆縣委縣政府加大城市建設(shè)和招商引資力度,重新規(guī)劃將縣城區(qū)建設(shè),新農(nóng)村建設(shè)工作全面啟動,縣城東部將作為新農(nóng)村建設(shè)的試點,用電負(fù)荷必將有較大增長。同時隨著農(nóng)民收入提高和家電下鄉(xiāng)政策的實施,該區(qū)域的用電量也將出現(xiàn)一定程度增加。目前金鄉(xiāng)縣東部區(qū)域供電全部由110kV金鄉(xiāng)變10kV出線提供電源。金鄉(xiāng)變以220kV魚臺變?yōu)殡娫?,金魚線主供;110kV緡大線金鄉(xiāng)支線備用;110kV主變兩臺,容量63MVA;35kV出線6條;10kV出線7條。10kV線路供電半徑大,線路老化,因隨著縣城區(qū)域的不斷擴(kuò)大金鄉(xiāng)變逐浙被包圍在城市中心,配電線路出線走廊越來越困難。隨著我縣經(jīng)濟(jì)建設(shè)步伐的加快,金鄉(xiāng)縣東部地區(qū)的用電量增長將會加快,而目前承擔(dān)該區(qū)域供電的僅有運行已超過30年的金鄉(xiāng)變電站,設(shè)備容量及線路狀況已經(jīng)不能滿足負(fù)荷增長的需要,需要建設(shè)新的電源點滿足供電需要。 負(fù)荷預(yù)測蘇橋站所在區(qū)域蘇橋村、春秋莊、后臺子、東嶺子等十三個村全部拆遷完畢。規(guī)劃有:誠信花園、九星花園、春秋社區(qū)、高尚社區(qū)、莎嶺社區(qū)五個居住區(qū);人防、公檢法、銀行、醫(yī)院、學(xué)校、電力等企事業(yè)單位;商貿(mào)物流中心及其它服務(wù)業(yè)。目前九星花園三期已完工,其它商業(yè)開發(fā)也迅速展開,用電負(fù)荷大幅增長。附金鄉(xiāng)縣城市規(guī)劃圖附圖12。 蘇橋變區(qū)域網(wǎng)供用電量預(yù)測表 單位:億千瓦時、MW蘇橋變供電范圍2010年2011年2012年2013年2014年2015年“十二五”平均增長率網(wǎng)供最大負(fù)荷20. 3% 網(wǎng)供電量% 35kV及近期新增主要負(fù)荷情況   單位:MW序號建設(shè)項目項目內(nèi)容預(yù)計投產(chǎn)日期用電負(fù)荷一35kV負(fù)荷2010年負(fù)荷135kV高河變變電站235kV化雨變變電站335kV金橋礦變電站二新增負(fù)荷1九星花園住宅2東湖國際大酒店酒店3高尚社區(qū)住宅4春秋社區(qū)住宅5莎嶺社區(qū)住宅6商貿(mào)物流中心商業(yè)物流7人防中心事業(yè)28公檢法、農(nóng)信社事業(yè)9金宇建材市場商業(yè)110新醫(yī)院、保健院衛(wèi)生411一中、育才中學(xué)學(xué)校12誠信花園住宅13其它服務(wù)新增小計 工程建設(shè)必要性1)滿足用電負(fù)荷快速增長的需要目前我縣縣城東部、高河鄉(xiāng)西部、化雨鄉(xiāng)西部及臨近區(qū)域主要由運行30年之久的110kV金鄉(xiāng)變供電。近幾年來隨著金鄉(xiāng)縣城區(qū)向東部的不斷擴(kuò)張,蘇橋村周圍十三個村莊全部拆除,規(guī)劃建設(shè)誠信花園、九星花園兩處;春秋、高尚、莎嶺新農(nóng)村社區(qū)三處,建筑面積47萬平方米;人防中心建筑面積3萬平方米;人民醫(yī)院東院建筑面積15萬平方米;一中及育才中學(xué)建筑面積16萬平方米;商貿(mào)物流多家,下一步蘇橋用電負(fù)荷增長速度較快,,原有的供電設(shè)施已不能滿足負(fù)荷增長的需要。2)加強蘇橋發(fā)展區(qū)域電網(wǎng)網(wǎng)架結(jié)構(gòu)新規(guī)劃的蘇橋變計劃供電范圍:壽河以東、萊河以西、北至王杰路兩側(cè)萬福湖以南地區(qū)、南至南外環(huán)路以北,供電區(qū)域約8 km,這樣西與金鄉(xiāng)變、南與城南變的線路形成手拉手供電,實現(xiàn)城區(qū)手拉手供電比率100%。隨著金鄉(xiāng)縣城區(qū)的不斷發(fā)展建設(shè),金鄉(xiāng)變逐浙被包圍在城市中心,金鄉(xiāng)變周圍商居區(qū)越來越多,規(guī)劃高壓線路走廊越來越狹窄,出線越來越困難,金鄉(xiāng)變向東已沒有出線走廊,目前僅有金魯線、金城I線兩條10 kV線路供電。同時城南變沒有了出線間隔并且向蘇橋變區(qū)域供電線路較長超出供電半徑,電壓質(zhì)量較差,所以蘇橋變計劃供電區(qū)域位置已經(jīng)是供電發(fā)展的瓶頸區(qū)域。2010年開始,人防指揮中心、公檢法、體育中心、學(xué)校、醫(yī)院等公共事業(yè)的建設(shè),將帶動周圍房地產(chǎn)、商貿(mào)及服務(wù)業(yè)的快速發(fā)展,所以蘇橋變的建設(shè)是十分必要的。綜上所述,為滿足蘇橋變區(qū)域負(fù)荷迅速增長的需求;優(yōu)化該區(qū)域10kV電網(wǎng)結(jié)構(gòu)、提高安全供電可靠性,在蘇橋發(fā)展區(qū)建設(shè)110kV蘇橋站是十分必要的?!∽冸姴糠忠?guī)劃規(guī)模:三圈有載調(diào)壓變壓器3臺,容量350MVA,電壓等級110/35Kv/,110kV進(jìn)線2回,采用擴(kuò)大內(nèi)橋接線方式;35kV出線12回,單母線四分段;10kV出線24回單母線分段,+。本期規(guī)模:本期建設(shè)2臺50MVA有載調(diào)壓變壓器,電壓等級為110/35/10kV,110kV進(jìn)線二回,一回由金魚線T接接入,另一回由220kV緡城變出110kV蘇橋線,35kV出線8回,10kV出線16回。無功自動補償電容器2(+)Mvar。對側(cè)間隔:110kV金魚線T接進(jìn)蘇橋變一回,220kV緡城變出線間隔一回。對側(cè)保護(hù):220kV緡城變110kV出線間隔線路保護(hù)一套。規(guī)劃規(guī)模:110kV蘇橋規(guī)劃進(jìn)線二回,另一回由220kV緡城變出線一回。本期規(guī)模:本期兩回:由110kV金魚線T接新建金魚線蘇橋支線一回,另一回由220kV緡城變出線一回。110kV金魚線17桿T接110kV金魚線蘇橋支線進(jìn)蘇橋變,新建支線線路一回,采用LGJ300導(dǎo)線。另一回由220kV緡城變出線一回采用同塔雙回線路。220kV魚臺變至110kV金鄉(xiāng)變的110kV金魚線ADSS光纜在1314之間加桿開斷,沿新建金魚線蘇橋支線線路架設(shè)1根24芯OPGW光纜至蘇橋變,利用原110kV金魚線ADSS光纜金鄉(xiāng)變段接入公司光通信網(wǎng)絡(luò)。同時,蘇橋變安裝一套點對點無線以太網(wǎng)橋及VPN設(shè)備,經(jīng)過VPN設(shè)備加密處理后,作為自動化或數(shù)據(jù)業(yè)務(wù)的無線備用通道。沿蘇橋變至220kV緡城變110kV線路,架設(shè)24芯OPGW光纜一根。 等效電路圖1)35kV母線三相短路時,35kV母線最大運行方式下三相短路電流:+==1560/=8077(A) 35kV母線最小運行方式下三相短路電流為主變分裂時的阻抗較大的變壓器計算(兩臺主變分裂運行):=+==1560/=3580(A)2)10kV母線三相短路時,10kV母線最大運行方式下三相短路電流(主變并列運行):+==5500/=20136(A) 10kV母線最小運行方式下三相短路電流為主變分裂時計算:=++==5500/=9241(A)無功補償應(yīng)滿足系統(tǒng)各種正常及事故運行方式下電壓水平的需要,原則上應(yīng)使無功就地分區(qū)分電壓基本平衡。變電站無功補償以補償變壓器無功損耗為主,適當(dāng)兼顧負(fù)荷側(cè)的無功補償。根據(jù)蘇橋變供電區(qū)域內(nèi)經(jīng)濟(jì)發(fā)展及負(fù)荷增長的實際情況,蘇橋變主變?nèi)萘窟x擇為350MVA(110/35kV /10kV)。按照《國家電網(wǎng)公司電力系統(tǒng)無功補償配置技術(shù)原則》蘇橋變無功補償裝置每臺主變按(+)Mvar配置。.計算機監(jiān)控及保護(hù)系統(tǒng) 采用開放式分層分布式系統(tǒng), 由站控層和間隔層構(gòu)成。 優(yōu)化簡化網(wǎng)絡(luò)結(jié)構(gòu), 統(tǒng)一建模, 統(tǒng)一組網(wǎng), 信息共享,通信規(guī)約統(tǒng)一采用 DL/T860 通信標(biāo)準(zhǔn),實現(xiàn)站控層、 間隔層二次設(shè)備互操作。 變電站內(nèi)信息宜具有共享性和唯一性, 保護(hù)故障信息、 遠(yuǎn)動信息不重復(fù)采集。 110kV 變電站網(wǎng)絡(luò)結(jié)構(gòu)拓?fù)湟瞬捎脝涡切汀?站控層宜配置 1 臺中心交換機,間隔層側(cè)二次設(shè)備室網(wǎng)絡(luò)交換機宜按照設(shè)備室或按電壓等級配置, 每臺交換機端口數(shù)量滿足應(yīng)用需求。 . 系統(tǒng)繼電保護(hù)配置方案. 1 110kV線路保護(hù)110kV本期進(jìn)線2回,不配置保護(hù),配測控裝置三相操作箱. 2 110kV橋保護(hù)配置原則擴(kuò)大內(nèi)橋斷路器配置備用電源自動投入裝置。 二次設(shè)備布置 監(jiān)控系統(tǒng):主變壓器測控:按3臺變壓器配置3套測控裝置,完成主變的遙測、遙信、遙控、遙調(diào)功能。110kV線路、分段開關(guān)間隔:測控裝置按斷路器配置;完成本間隔的遙測、遙信、遙控功能。110kV:配置PT并列裝置及進(jìn)線、分段備自投裝置。
點擊復(fù)制文檔內(nèi)容
外語相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖片鄂ICP備17016276號-1