freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

110kv蘇橋輸變可研報(bào)告(編輯修改稿)

2025-06-11 03:44 本頁(yè)面
 

【文章內(nèi)容簡(jiǎn)介】 ere no more mountains in sight. The aircraft was able to fly over the endless white plains without difficulty. Lesson44 Through the forest 穿過(guò)森林Mrs Anne Sterling did not think of the risk she was taking when she ran through a forest after two men. They had rushed up to her while she was having a piic at the edge of a forest with her children and tried to steal her handbag. In the struggle, the strap broke and, with the bag in their possession, both men started running through the trees. Mrs Sterling got so angry that she ran after them. She was soon out of breath, but she continued to run. When she caught up with them, she saw that they had sat down and were going through the contents of the bag, so she ran straight at them. The men got such a fright that they dropped the bag and ran away. 39。The strap needs mending,39。 said Mrs Sterling later, 39。but they did not steal anything.39。Lesson45 A clear conscience 問(wèn)心無(wú)愧The whole village soon learnt that a large sum of money had been lost. Sam Benton, the local butcher, had lost his wallet while taking his savings to the postoffice. Sam was sure that the wallet must have been found by one of the villagers, but it was not returned to him. Three months passed, and then one morning, Sam found his wallet outside his front door. It had been wrapped up in newspaper and it contained half the money he had lost, together with a note which said: 39。A thief, yes, 39。but only 5o per cent a thief!39。 Two金鄉(xiāng)110kV蘇橋輸變電工程可行性研究報(bào)告1設(shè)計(jì)依據(jù)、原則及范圍山東電網(wǎng)“十二五”規(guī)劃及2020年遠(yuǎn)景展望山東省電力工業(yè)統(tǒng)計(jì)資料匯編濟(jì)寧金鄉(xiāng)電網(wǎng)“十二五”發(fā)展規(guī)劃。 設(shè)計(jì)范圍和設(shè)計(jì)原則本可研報(bào)告按照《國(guó)家電網(wǎng)公司輸變電工程可行性研究?jī)?nèi)容深度規(guī)定(試行)》的要求,在《山東電網(wǎng)“十一五”規(guī)劃及2020年遠(yuǎn)景展望》及濟(jì)寧及金鄉(xiāng)縣電網(wǎng)“十二五”發(fā)展規(guī)劃的基礎(chǔ)上,論證110kV蘇橋輸變電工程建設(shè)的必要性和建設(shè)規(guī)模,確定其合理的投產(chǎn)年限,提出接入系統(tǒng)方案、遠(yuǎn)景規(guī)模和本期規(guī)模,提出與本工程相關(guān)的系統(tǒng)二次方案,對(duì)新建變電站進(jìn)行工程選站,新建線(xiàn)路提出路徑選擇及工程設(shè)想,對(duì)站址及路徑方案經(jīng)技術(shù)經(jīng)濟(jì)比較提出推薦意見(jiàn)。并對(duì)輸變電項(xiàng)目進(jìn)行投資估算。 設(shè)計(jì)水平年本工程計(jì)劃2011年10月開(kāi)工,2012年6月建成投產(chǎn)。設(shè)計(jì)水平年取2010年。2電力系統(tǒng)一次金鄉(xiāng)縣位于魯西南平原,地跨東經(jīng)116176。7′至116176。30′,北緯34176。54′至35176。40′.105國(guó)道貫穿縣境南北,境內(nèi)東西最大橫距26km。,耕地面積78萬(wàn)畝。全縣13個(gè)鄉(xiāng)鎮(zhèn),659個(gè)行政村(居委會(huì)),。縣域電網(wǎng)有220千伏變電站1座,容量150 +180MVA;110千伏變電站5座,;35千伏變電站15座,;其中公司產(chǎn)權(quán)的公共變電站共11座。 ,;10千伏配電線(xiàn)路1269km。金鄉(xiāng)電網(wǎng)以220kV緡城變的110kV緡彭線(xiàn)、110kV緡大線(xiàn),110kV寧緡線(xiàn),220kV魚(yú)臺(tái)變的110kV金魚(yú)線(xiàn)為主供電源。四座110kV變電站為樞紐,輻射到11座35kV變電站向全縣供電。截止2010年底全縣共有一處220kV變電站,主變?nèi)萘繛?30MVA/2臺(tái);;五處110kV變電站,;;110kV金鄉(xiāng)變、彭井變、城西變、園區(qū)變?yōu)殡p電源,110kV大義變?yōu)閱坞娫垂╇姡还局睂?5kV變電站11處,主變22臺(tái),;用戶(hù)35kV變電站5處,主變9臺(tái)。全縣35kV線(xiàn)路24條,;10kV配電線(xiàn)路67條。;其中網(wǎng)供最大負(fù)荷165MW。2010年金鄉(xiāng)縣電網(wǎng)地理接線(xiàn)示意圖詳見(jiàn)附圖1。電網(wǎng)存在的主要問(wèn)題:目前金鄉(xiāng)城區(qū)供電任務(wù)主要由110kV金鄉(xiāng)變、110kV城西變及35kV城南變承擔(dān)。110kV城西變及35kV城南變主供縣城西部、南部區(qū)域及魚(yú)山鎮(zhèn)、開(kāi)發(fā)區(qū)、雞黍鎮(zhèn)北部??h城東部區(qū)域主要為金鄉(xiāng)鎮(zhèn)東部和北部、化雨鄉(xiāng)和王丕鎮(zhèn)北部、高河鄉(xiāng)西部,目前該區(qū)域大蒜種植面積較多,臨近魚(yú)臺(tái)縣大蒜種植面積大幅度增加,大蒜收獲后主要在我縣東部區(qū)域進(jìn)行倉(cāng)儲(chǔ)、加工,該區(qū)域已成為我縣大蒜倉(cāng)儲(chǔ)、加工、集散中心之一,用電負(fù)荷急劇增長(zhǎng)。2009年以來(lái)新一屆縣委縣政府加大城市建設(shè)和招商引資力度,重新規(guī)劃將縣城區(qū)建設(shè),新農(nóng)村建設(shè)工作全面啟動(dòng),縣城東部將作為新農(nóng)村建設(shè)的試點(diǎn),用電負(fù)荷必將有較大增長(zhǎng)。同時(shí)隨著農(nóng)民收入提高和家電下鄉(xiāng)政策的實(shí)施,該區(qū)域的用電量也將出現(xiàn)一定程度增加。目前金鄉(xiāng)縣東部區(qū)域供電全部由110kV金鄉(xiāng)變10kV出線(xiàn)提供電源。金鄉(xiāng)變以220kV魚(yú)臺(tái)變?yōu)殡娫?,金魚(yú)線(xiàn)主供;110kV緡大線(xiàn)金鄉(xiāng)支線(xiàn)備用;110kV主變兩臺(tái),容量63MVA;35kV出線(xiàn)6條;10kV出線(xiàn)7條。10kV線(xiàn)路供電半徑大,線(xiàn)路老化,因隨著縣城區(qū)域的不斷擴(kuò)大金鄉(xiāng)變逐浙被包圍在城市中心,配電線(xiàn)路出線(xiàn)走廊越來(lái)越困難。隨著我縣經(jīng)濟(jì)建設(shè)步伐的加快,金鄉(xiāng)縣東部地區(qū)的用電量增長(zhǎng)將會(huì)加快,而目前承擔(dān)該區(qū)域供電的僅有運(yùn)行已超過(guò)30年的金鄉(xiāng)變電站,設(shè)備容量及線(xiàn)路狀況已經(jīng)不能滿(mǎn)足負(fù)荷增長(zhǎng)的需要,需要建設(shè)新的電源點(diǎn)滿(mǎn)足供電需要。 負(fù)荷預(yù)測(cè)蘇橋站所在區(qū)域蘇橋村、春秋莊、后臺(tái)子、東嶺子等十三個(gè)村全部拆遷完畢。規(guī)劃有:誠(chéng)信花園、九星花園、春秋社區(qū)、高尚社區(qū)、莎嶺社區(qū)五個(gè)居住區(qū);人防、公檢法、銀行、醫(yī)院、學(xué)校、電力等企事業(yè)單位;商貿(mào)物流中心及其它服務(wù)業(yè)。目前九星花園三期已完工,其它商業(yè)開(kāi)發(fā)也迅速展開(kāi),用電負(fù)荷大幅增長(zhǎng)。附金鄉(xiāng)縣城市規(guī)劃圖附圖12。 蘇橋變區(qū)域網(wǎng)供用電量預(yù)測(cè)表 單位:億千瓦時(shí)、MW蘇橋變供電范圍2010年2011年2012年2013年2014年2015年“十二五”平均增長(zhǎng)率網(wǎng)供最大負(fù)荷20. 3% 網(wǎng)供電量% 35kV及近期新增主要負(fù)荷情況   單位:MW序號(hào)建設(shè)項(xiàng)目項(xiàng)目?jī)?nèi)容預(yù)計(jì)投產(chǎn)日期用電負(fù)荷一35kV負(fù)荷2010年負(fù)荷135kV高河變變電站235kV化雨變變電站335kV金橋礦變電站二新增負(fù)荷1九星花園住宅2東湖國(guó)際大酒店酒店3高尚社區(qū)住宅4春秋社區(qū)住宅5莎嶺社區(qū)住宅6商貿(mào)物流中心商業(yè)物流7人防中心事業(yè)28公檢法、農(nóng)信社事業(yè)9金宇建材市場(chǎng)商業(yè)110新醫(yī)院、保健院衛(wèi)生411一中、育才中學(xué)學(xué)校12誠(chéng)信花園住宅13其它服務(wù)新增小計(jì) 工程建設(shè)必要性1)滿(mǎn)足用電負(fù)荷快速增長(zhǎng)的需要目前我縣縣城東部、高河鄉(xiāng)西部、化雨鄉(xiāng)西部及臨近區(qū)域主要由運(yùn)行30年之久的110kV金鄉(xiāng)變供電。近幾年來(lái)隨著金鄉(xiāng)縣城區(qū)向東部的不斷擴(kuò)張,蘇橋村周?chē)齻€(gè)村莊全部拆除,規(guī)劃建設(shè)誠(chéng)信花園、九星花園兩處;春秋、高尚、莎嶺新農(nóng)村社區(qū)三處,建筑面積47萬(wàn)平方米;人防中心建筑面積3萬(wàn)平方米;人民醫(yī)院東院建筑面積15萬(wàn)平方米;一中及育才中學(xué)建筑面積16萬(wàn)平方米;商貿(mào)物流多家,下一步蘇橋用電負(fù)荷增長(zhǎng)速度較快,,原有的供電設(shè)施已不能滿(mǎn)足負(fù)荷增長(zhǎng)的需要。2)加強(qiáng)蘇橋發(fā)展區(qū)域電網(wǎng)網(wǎng)架結(jié)構(gòu)新規(guī)劃的蘇橋變計(jì)劃供電范圍:壽河以東、萊河以西、北至王杰路兩側(cè)萬(wàn)福湖以南地區(qū)、南至南外環(huán)路以北,供電區(qū)域約8 km,這樣西與金鄉(xiāng)變、南與城南變的線(xiàn)路形成手拉手供電,實(shí)現(xiàn)城區(qū)手拉手供電比率100%。隨著金鄉(xiāng)縣城區(qū)的不斷發(fā)展建設(shè),金鄉(xiāng)變逐浙被包圍在城市中心,金鄉(xiāng)變周?chē)叹訁^(qū)越來(lái)越多,規(guī)劃高壓線(xiàn)路走廊越來(lái)越狹窄,出線(xiàn)越來(lái)越困難,金鄉(xiāng)變向東已沒(méi)有出線(xiàn)走廊,目前僅有金魯線(xiàn)、金城I線(xiàn)兩條10 kV線(xiàn)路供電。同時(shí)城南變沒(méi)有了出線(xiàn)間隔并且向蘇橋變區(qū)域供電線(xiàn)路較長(zhǎng)超出供電半徑,電壓質(zhì)量較差,所以蘇橋變計(jì)劃供電區(qū)域位置已經(jīng)是供電發(fā)展的瓶頸區(qū)域。2010年開(kāi)始,人防指揮中心、公檢法、體育中心、學(xué)校、醫(yī)院等公共事業(yè)的建設(shè),將帶動(dòng)周?chē)康禺a(chǎn)、商貿(mào)及服務(wù)業(yè)的快速發(fā)展,所以蘇橋變的建設(shè)是十分必要的。綜上所述,為滿(mǎn)足蘇橋變區(qū)域負(fù)荷迅速增長(zhǎng)的需求;優(yōu)化該區(qū)域10kV電網(wǎng)結(jié)構(gòu)、提高安全供電可靠性,在蘇橋發(fā)展區(qū)建設(shè)110kV蘇橋站是十分必要的。 變電部分規(guī)劃規(guī)模:三圈有載調(diào)壓變壓器3臺(tái),容量350MVA,電壓等級(jí)110/35Kv/,110kV進(jìn)線(xiàn)2回,采用擴(kuò)大內(nèi)橋接線(xiàn)方式;35kV出線(xiàn)12回,單母線(xiàn)四分段;10kV出線(xiàn)24回單母線(xiàn)分段,+。本期規(guī)模:本期建設(shè)2臺(tái)50MVA有載調(diào)壓變壓器,電壓等級(jí)為110/35/10kV,110kV進(jìn)線(xiàn)二回,一回由金魚(yú)線(xiàn)T接接入,另一回由220kV緡城變出110kV蘇橋線(xiàn),35kV出線(xiàn)8回,10kV出線(xiàn)16回。無(wú)功自動(dòng)補(bǔ)償電容器2(+)Mvar。對(duì)側(cè)間隔:110kV金魚(yú)線(xiàn)T接進(jìn)蘇橋變一回,220kV緡城變出線(xiàn)間隔一回。對(duì)側(cè)保護(hù):220kV緡城變110kV出線(xiàn)間隔線(xiàn)路保護(hù)一套。規(guī)劃規(guī)模:110kV蘇橋規(guī)劃進(jìn)線(xiàn)二回,另一回由220kV緡城變出線(xiàn)一回。本期規(guī)模:本期兩回:由110kV金魚(yú)線(xiàn)T接新建金魚(yú)線(xiàn)蘇橋支線(xiàn)一回,另一回由220kV緡城變出線(xiàn)一回。110kV金魚(yú)線(xiàn)17桿T接110kV金魚(yú)線(xiàn)蘇橋支線(xiàn)進(jìn)蘇橋變,新建支線(xiàn)線(xiàn)路一回,采用LGJ300導(dǎo)線(xiàn)。另一回由220kV緡城變出線(xiàn)一回采用同塔雙回線(xiàn)路。220kV魚(yú)臺(tái)變至110kV金鄉(xiāng)變的110kV金魚(yú)線(xiàn)ADSS光纜在1314之間加桿開(kāi)斷,沿新建金魚(yú)線(xiàn)蘇橋支線(xiàn)線(xiàn)路架設(shè)1根24芯OPGW光纜至蘇橋變,利用原110kV金魚(yú)線(xiàn)ADSS光纜金鄉(xiāng)變段接入公司光通信網(wǎng)絡(luò)。同時(shí),蘇橋變安裝一套點(diǎn)對(duì)點(diǎn)無(wú)線(xiàn)以太網(wǎng)橋及VPN設(shè)備,經(jīng)過(guò)VPN設(shè)備加密處理后,作為自動(dòng)化或數(shù)據(jù)業(yè)務(wù)的無(wú)線(xiàn)備用通道。沿蘇橋變至220kV緡城變110kV線(xiàn)路,架設(shè)24芯OPGW光纜一根。 等效電路圖1)35kV母線(xiàn)三相短路時(shí),35kV母線(xiàn)最大運(yùn)行方式下三相短路電流:+==1560/=8077(A) 35kV母線(xiàn)最小運(yùn)行方式下三相短路電流為主變分裂時(shí)的阻抗較大的變壓器計(jì)算(兩臺(tái)主變分裂運(yùn)行):=+==1560/=3580(A)2)10kV母線(xiàn)三相短路時(shí),10kV母線(xiàn)最大運(yùn)行方式下三相短路電流(主變并列運(yùn)行):+==5500/=20136(A) 10kV母線(xiàn)最小運(yùn)行方式下三相短路電流為主變分裂時(shí)計(jì)算:=++==5500/=9241(A)無(wú)功補(bǔ)償應(yīng)滿(mǎn)足系統(tǒng)各種正常及事故運(yùn)行方式下電壓水平的需要,原則上應(yīng)使無(wú)功就地分區(qū)分電壓基本平衡。變電站無(wú)功補(bǔ)償以補(bǔ)償變壓器無(wú)功損耗為主,適當(dāng)兼顧負(fù)荷側(cè)的無(wú)功補(bǔ)償。根據(jù)蘇橋變供電區(qū)域內(nèi)經(jīng)濟(jì)發(fā)展及負(fù)荷增長(zhǎng)的實(shí)際情況,蘇橋變主變?nèi)萘窟x擇為350MVA(110/35kV /10kV)。按照《國(guó)家電網(wǎng)公司電力系統(tǒng)無(wú)功補(bǔ)償配置技術(shù)原則》蘇橋變無(wú)功補(bǔ)償裝置每臺(tái)主變按(+)Mvar配置。.計(jì)算機(jī)監(jiān)控及保護(hù)系統(tǒng) 采用開(kāi)放式分層分布式系統(tǒng), 由站控層和間隔層構(gòu)成。 優(yōu)化簡(jiǎn)化網(wǎng)絡(luò)結(jié)構(gòu), 統(tǒng)一建模, 統(tǒng)一組網(wǎng), 信息共享,通信規(guī)約統(tǒng)一采用 DL/T860 通信標(biāo)準(zhǔn),實(shí)現(xiàn)站控層、 間隔層二次設(shè)備互操作。 變電站內(nèi)信息宜具有共享性和唯一性, 保護(hù)故障信息、 遠(yuǎn)動(dòng)信息不重復(fù)采集。 110kV 變電站網(wǎng)絡(luò)結(jié)構(gòu)拓?fù)湟瞬捎脝涡切汀?站控層宜配置 1 臺(tái)中心交換機(jī),間隔層側(cè)二次設(shè)備室網(wǎng)絡(luò)交換機(jī)宜按照設(shè)備室或按電壓等級(jí)配置, 每臺(tái)交換機(jī)端口數(shù)量滿(mǎn)足應(yīng)用需求。 . 系統(tǒng)繼電保護(hù)配置方案. 1 110kV線(xiàn)路保護(hù)110kV本期進(jìn)線(xiàn)2回,不配置保護(hù),配測(cè)控裝置三相操作箱. 2 110kV橋保護(hù)配置原則擴(kuò)大內(nèi)橋斷路器配置備用電源自動(dòng)投入裝置。 二次設(shè)備布置 監(jiān)控系統(tǒng):主變壓器測(cè)控:按3臺(tái)變壓器配置3套測(cè)控裝置,完成主變的遙測(cè)、遙信、遙控、遙調(diào)功能。110kV線(xiàn)路、分段開(kāi)關(guān)間隔:測(cè)控裝置按斷路器配置;完成本間隔的遙測(cè)、遙信、遙控功能。110kV:配置PT并列裝置及進(jìn)線(xiàn)、分段備自投裝置。
點(diǎn)擊復(fù)制文檔內(nèi)容
外語(yǔ)相關(guān)推薦
文庫(kù)吧 www.dybbs8.com
備案圖片鄂ICP備17016276號(hào)-1