freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

projectmanagement專案管理(編輯修改稿)

2024-11-12 16:37 本頁面
 

【文章內(nèi)容簡(jiǎn)介】 體延遲完成! Time Compression 1. Fast Tracking ? Split a task into smaller tasks ? and arrange them in steps and in parallel ? No additional cost 2. Compression ? Add more resources to plete a job ? Involve more cost amp。 resources All pression involve additional risk! 成本管理 : Cost Control ? Monitoring cost performance to detect and understand variances from the cost baseline ? Assuring that potential cost overruns do not exceed the authorized funding ? Preventing incorrect, inappropriate, or unapproved changes from being included in the reported cost or resource usage ? Action to bring expected cost overruns within acceptable limits CHANGE CONTROL: ? Influencing the factors that create changes to the cost baseline ? Ensuring requested changes are agreed upon ? Managing the actual changes when and as they occur ? Recording all appropriate changes accurately against the cost baseline ? Informing appropriate stakeholders of approved changes Earned Value Method 掙值分析 1. PV: Planned Value 2. EV: Earned Value 3. AC: Actual Cost ? Schedule Variance: EVPV ? Schedule Performance Index: EV/PV ? Cost Variance: EVAC ? Cost Performance Index: EV/AC Project Performance Measurement ?
點(diǎn)擊復(fù)制文檔內(nèi)容
教學(xué)課件相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖片鄂ICP備17016276號(hào)-1