【文章內(nèi)容簡介】
ing days/man.(4)the second technical service shall start during the verification of b shall send a specialist to party as factory to providetechnical servicefor18 working days/man.(5)party b shall, for its specialists, bear their travelling expensee. parthashall be responsible for boarding and lodging and affording the means of conveyance fromthe lodgingplace to the factoty. training(1)party b shall train party as technical personnel so as to enable them tomasterparty bs design, performance test and technology in machining, erection andinspection of the contracted products, so that party a can use the technical documentsand knowhow supplied by p arty b toproducethe same products in the contract factory. party b shall do its best to arrange for party as personnel to visit the majorusersand the manufacturing process of the ponents from other countries of the contractedproducts.(2)party a shall send twice its technical personnel to party bs factory fortraining, andthe total number of the participants shall not exceed 320 days/man (excluding the interpreter).(3)the first training shall be from the third to the fourth month after thecontract es into effect. there shall be 4 technical persons and an interpreterto besent to party b for training for 16o working days/man (5 days week). the training shallcover the design of the contracted products and manufacturing technology.(4)the second training shall be from the eighth to the nineth month. party a shallsent 4 technical persons and an interpreter to party bs factory for training for 160working days/man(5 days per week). the training shall cover the designing, themanufacturing technology,erection and adjustment of the contracted products.(5)party a shall bear the travelling expenses of its trainees。 party b shallprovide party as trainees free of charge with boarding, lodging and means ofconveyance for travel ling between the lodging place and the e 6technical documents b shall, according to the delivery schedule and details stpulated inappendix 2to the contract, deliver the documents at_________. date stamped by the air transportation ageney at_________,shll be takenas the actual date of delivery paryt a shall send to party b a photostat copy of theairconsignment note shwing the stampde date of arrival. twentyfour hours after the despatch of each lot of the technical documente,party b shal1 notify party a by cable or telex of the contract number, number and dateof the air consignment note, items of the documents, number of pieces, airmail toparty a two copies of each of the air consignment note and detaikled list of thetechnical documents. the technical documents are foumd lost, damaged or mutilated during airtransportation, party b shall supply party a free of charge with a second lot ofdocuments within thechortest possible time but not later than thirty days after it hasreceived from party a the writtennotice. within sixty days after party a has receivedthe documents from party b,if party a does not declare the shortage and request tocover the same, it is considered asacepted. technical documents shall be in english and based on metric system e 7verification and acceptance verification test on the first samplemachine of the contractedamp。nbs p。product shallbe carried out by the joint group consisting of party as and party bs representativesaccordingto the schedule and contents stipulated in appendix 7 to the contract. lf theperformance of the contracted product is in conformity with the technical specificationsstipulated in appendix 1, such testshall be considersd as qualified and therepresentatives of both parties shll sign the inspection and testing certificate for theproper performance of the contracted product in quadruplicate, 2copies for each party. the verification test demonstrates that the performance of the contractedproduct isnot in conformity with prescribed technical specifications, both partiesshall, throughamicable negotiations,make a joint study of and analyse the cause andtake measures to eliminate the defects and carry out asecond test. when the second testdemonstuates tha the performance is qualified, both parties shall sign a testingcertificate for the proper perfot mance party b is responsible for the failure of the first test, party b shall sendat ist own expense technical ersonnel for the second test. the second test fails again and the failure is attributed to party b, party bshallindemnify party a for any losses sustained and shall take effective measures toeliminate thedefects and carry out a third test. the third test again fails, and if party b is responsible for the failure,party a has the right to terminate the contract at its discretion and lodge claims asstipulated ih the responsibility for the failure lies with party a, the twoparties shall negotiate as tohow to further implement the e 8technical improvements the technical documents provided by party b are not applicable to party asactualproduction condidions (such as design standards, raw materials, purchased partsfor the machine, production facilitie), party b is obliged to assist party a inmodifying the technicaldocuments and confirm the same. upon the condition that theproperties of the contracted products are not affected, raw materials, fittings andequipmint of chinese origin may be used. the currency of the contract. if eithet of the two parties effets improvements on or developments of the products within the xcope stipulated in the contract,thd said party shall submit, free of charge, to the other party the technologicalinformation concernign such improvements or developments. ownership of such improvements on or developments of the ontracted productshall belong to the party who has effected such improvements or develpments. the otheparyt shall not apply for patent ortransfer the same to any third e 9guarantees and claims b guarantees that the technicalamp。 nbsp。documents to be supplied by party b