【正文】
of of his house. He slept very well for the first two nights, but on the third night, abed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, a 22設(shè)計原則(1)根據(jù)國家現(xiàn)行的有關(guān)標準、規(guī)范要求進行消防設(shè)計。噪聲污染控制措施執(zhí)行《建筑施工場界噪聲限值》(GB1252390)對各施工階段噪聲限值的要求。(4)門窗節(jié)能:外墻立面上的所有門窗(含南、北陽臺)均采用雙層中空玻璃塑鋼門窗,具有保溫、隔熱、隔聲等多重功能。為保證項目有效實施,已成立了由教育、發(fā)改、財政、城建等部分負責(zé)人組成的新建協(xié)調(diào)領(lǐng)導(dǎo)小組,負責(zé)新建項目建設(shè)事宜。監(jiān)督方式監(jiān)督方式為經(jīng)常性監(jiān)督和階段性監(jiān)督。延時自閉式水龍頭在出水一定時間后自動關(guān)閉,可避免長流水現(xiàn)象。三、節(jié)能措施建筑節(jié)能(1)建筑總平面的布置好設(shè)計,利用冬季日照并避開冬季主導(dǎo)風(fēng)向,利用夏季自然通風(fēng)。建筑施工余泥bed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, abed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, a 24項目在開挖基礎(chǔ)、澆注混凝土等過程中,會產(chǎn)生大量的余泥,這些余泥如不能及時運走并妥善處置,亂堆亂放,將阻礙附近人員行走,車輛通行,嚴重污染環(huán)境。采用聯(lián)合接地系統(tǒng),接地裝置利用建筑物內(nèi)基礎(chǔ)鋼筋焊接成網(wǎng),接地電阻值不大于 ,大于此值時增加人工接地。排雨水系統(tǒng):屋面雨水經(jīng)落水管流經(jīng)地面于地面雨水匯集,直接排至校園內(nèi)雨水總管網(wǎng);排污水系統(tǒng):排水管道采用 UPVC 塑料管及配bed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, abed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, a 20件,粘接。建筑外裝修:外墻清水或抹灰門窗:門窗便于開啟、清潔、耐用。高中部教學(xué)實驗樓主要房間組成bed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, abed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, a 16每間使用面積 間數(shù)使用面積合計用房指標(M2) (間) (M2)備注普通教室 68 36 2448教研室 56 19 1064實驗室 96 1 96附房 48 1合堂教室 156 2 312初中部教學(xué)實驗樓主要房間組成每間使用面積 間數(shù)使用面積合計用房指標(M2) (間) (M2)備注普通教室 58 54 3132教研室 62 15 930實驗室 97 32 3104附房 36 32 1152輔助教室 54 12 64***小學(xué)綜合樓綜合樓設(shè)計包含 40 個教室,約 12 間教師辦公室和一個可容納800 人的報告大廳,其余則為衛(wèi)生間、設(shè)備用房等到。形體組合上體現(xiàn)歷史文化及地方特色,使建筑個性鮮明,富有校園氣息。本項目擬選場址與周邊地區(qū)沒有潛在的矛盾源,不存在與周邊社會關(guān)系的協(xié)調(diào)。03′到 40176。政府已成立了由教育、發(fā)改、財政、城建等部分負責(zé)人組成的新建協(xié)調(diào)領(lǐng)導(dǎo)小組,負責(zé)新建項目建設(shè)事宜。建校以來已累計培養(yǎng)中小學(xué)畢業(yè)生 6500 余名,為重點高中輸送學(xué)生近千名。資金籌措項目共需投資 萬元,全部由***市財政資金解決。bed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, abed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, a 3工程進度計劃項目計劃工期 2 年。在教學(xué)條件上,各種設(shè)施配套齊全。選址落實***中學(xué)擴建項目已完成校址選址工作,項目建設(shè)用地為***中學(xué)原校園周邊,靠近***公園,周邊以安置小區(qū)用地為主。44′之間,平均海拔1056 米。施工條件項目已完成了征地等準備工作,具備了現(xiàn)場施工條件。建筑物符合規(guī)劃、衛(wèi)生防護、日照、防火等有關(guān)規(guī)定。教學(xué)樓的二層設(shè)置一個內(nèi)庭院,可供小學(xué)生課間游玩。門窗開啟后不得影響室內(nèi)空間的實用和走廊通行的便利于安全。生活污水經(jīng)化糞池初步處理后,排入校園內(nèi)污水處理總管網(wǎng)。七、采暖設(shè)計規(guī)范《采暖通風(fēng)和空氣調(diào)節(jié)設(shè)計規(guī)范》GBJ19—20xx《民用建筑熱工設(shè)計規(guī)范》GB50176—93采暖工程冬季采用暖氣采暖的方式。建筑垃圾在施工期間產(chǎn)生的建筑垃圾具有產(chǎn)生量大、時間集中等特點,雖對環(huán)境的污染是暫時的,如果處理不當(dāng),不但影響景觀,還會影響周圍環(huán)境。結(jié)合現(xiàn)有場地,總圖規(guī)劃設(shè)計中盡可能將建筑的主朝向選擇最佳朝向或接近最佳朝向。bed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, abed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, a 29供熱節(jié)能供熱管網(wǎng)采用地溝敷設(shè),并加保溫層,保溫層厚度嚴格計算。bed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, abed which had sp。第七章 項目組織與管理一、組織機構(gòu)項目管理組織本項目由***市***中學(xué)負責(zé)組織實施。(3)選擇高性能的建筑材料產(chǎn)品,是高效率利用資源的前提,建筑結(jié)構(gòu)材料要有足夠的強度和耐久性,圍護結(jié)構(gòu)要有良好的保溫隔熱性能,防水、隔聲、涂料、管道等專用功能性材料,都要具有相應(yīng)的高性能。并盡量減緩行駛速度;加強施工人員的環(huán)保教育,提高其環(huán)保素質(zhì),提倡文明施工。采暖熱源采用城市集中供熱方式采暖。六、供電工程設(shè)計規(guī)范《供配電系統(tǒng)設(shè)計規(guī)范》GB50052—95《低壓配電設(shè)計規(guī)范》GB50054—95《建筑照明設(shè)計標準》GB50034—20xx《建筑物防雷設(shè)計規(guī)范》GB50057—94(20xx 年版)《民用建筑電器設(shè)計規(guī)范》JGJ/T16—92用電負荷建筑物用電指標:教學(xué)樓 20w/m2;實驗樓 18 w/m2;圖書樓 18 w/m2;報告廳 20 w/m2;辦公樓 16 w/m2;食堂 15 w/m2;宿舍 15 w/m2。門廳及走廊:門廳宜適度寬敞,有利于人流集散通行和短暫停留。建筑結(jié)構(gòu)結(jié)構(gòu)類型:所有建筑物均采用框架結(jié)構(gòu)。二、設(shè)計規(guī)范bed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, abed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, a 14《中小學(xué)校建筑設(shè)計規(guī)范》 (GBJ99—86)《建筑結(jié)構(gòu)荷載規(guī)范》GB50009—20xx(20xx 年版)《混凝土結(jié)構(gòu)設(shè)計規(guī)范》 (GB50010—20xx)《砌體結(jié)構(gòu)設(shè)計規(guī)范》 (GB50003—20xx)《建筑地基基礎(chǔ)設(shè)計規(guī)范》 (GB50007—20xx)《建筑抗震設(shè)計規(guī)范》 (GBJ50011—20xx)《建筑抗震設(shè)防分類標準》 (GB50223—20xx)《建筑地面設(shè)計規(guī)范》 (GB50037—96)《建筑防火設(shè)計規(guī)范》 (GB50016—20xx)《公共建筑節(jié)能設(shè)計標準》 (GB50189—20xx)《**省建筑節(jié)能設(shè)計標準》 (DBJ04—216—20xx)三、建設(shè)內(nèi)容和規(guī)模新建學(xué)校設(shè)計軌制為高中 12 軌 36 個教學(xué)班,容納在校生 1980 人,初中部 18 軌 54 個教學(xué)班,容納在校生 3240 人,小學(xué)部 6 軌 36 個教學(xué)班,容納在校生 1800 人,中小學(xué)共計 7020 人。主要為生活污水,經(jīng)管道排入學(xué)校院內(nèi)化糞池集中處理后排入城市排水系統(tǒng)。地處晉、冀、蒙交界處,是聞名全國的煤都。四、總結(jié)綜上所述,***市***中學(xué)擴建項目必要可行,項目的實施有利于***中學(xué)學(xué)校的管理教育和教學(xué)水平的大幅提升,對推動全市中小學(xué)校的建設(shè)步伐、進一步改善辦學(xué)條件、優(yōu)化教育資源、促進全市教育持續(xù)健康發(fā)展有著十分重要的意義。***中學(xué)始終堅持“德育為首,教學(xué)為主,全面發(fā)展”的辦學(xué)思想,規(guī)范教育行為,優(yōu)化育人過程。結(jié)合當(dāng)?shù)亟?jīng)濟社會發(fā)展實際,充分考慮城市建設(shè)規(guī)劃、人口增長和密度、學(xué)齡人口變化趨勢、寄宿學(xué)生實際需求、教育資源布局、地理環(huán)境及水電等基礎(chǔ)條件是否滿足寄宿學(xué)校長遠發(fā)展需要等因素,確定項目學(xué)校。詳見下表?,F(xiàn)有在校中小學(xué)生近 4300 名;有教職員工 232 人。本項目建設(shè),完善了教學(xué)設(shè)施,不僅優(yōu)化了辦學(xué)條件,提高了辦學(xué)水平,而且有利于***中學(xué)擴大高中招生規(guī)模,為高一級院校輸送合bed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for t