【正文】
%。境內(nèi)地下礦藏還有鐵、銅、鋁、鋅、磷以及石灰石、云母、石墨、大理石、花崗石等。33′,北緯 39176。(2)學(xué)校不宜與市場、公共娛樂場所、生產(chǎn)貯藏易燃易爆物品的車間庫房等不利于學(xué)生學(xué)習(xí)、身心健康和危及學(xué)生安全的場所毗鄰。三、項目建設(shè)的可行性政策支持市委、市政府政府對教育的高度重視,使***中學(xué)擴建項目在政策扶持和投資上有更多的優(yōu)惠和方便。20xx 年,學(xué)校又榮獲“全國青少年愛國主義讀書教育活動示范學(xué)?!惫鈽s稱號,bed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, abed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, a 8校長***在全省優(yōu)秀少先隊工作表彰活動中,被省委、省政府授予“全省十佳校長”榮譽稱號。其中:中學(xué)特級教師 1 人,中學(xué)高級教師 21 人,中學(xué)一級和小學(xué)高級bed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, abed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, a 7教師共 75 名,教師中現(xiàn)有省級學(xué)科帶頭人和骨干教師 15 人,省級模范教師 2 人,省級教學(xué)能手 5 名,省級優(yōu)秀班主任 8 名;中小學(xué)專任教師學(xué)歷合格率為 100%。(4)建筑設(shè)計整體做到功能布局合理,配套設(shè)施齊全,外觀簡潔、大方。bed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, abed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, a 2建筑內(nèi)容一覽表表 11序號 建筑物、構(gòu)筑物名稱層數(shù) 單位 數(shù)量結(jié)構(gòu)形式1 主要建筑物 54060 高中部教學(xué)樓 五 M2 8054 框架 高中部實驗樓 五 M2 7405 框架 科技圖書樓 四 M2 5957 框架 文體綜合樓 二 M2 5320 框架 師生食堂 三 M2 6470 框架 學(xué)生公寓 五 M2 9114 框架 行政樓 六 M2 4293 框架 小學(xué)綜合樓 三 M2 7447 框架2 其他輔助性工程 原有初中教學(xué)實驗樓擴建 M2 2135 框架 遠(yuǎn)期規(guī)劃建筑 M2 4715 框架 報告廳 M2 1654 鋼架 室外運動場 M2 18497 道路及硬化 M2 31573 綠化 M2 20342 圍墻用大門 M 1270 磚 室外配套安裝工程 54060 項目總投資項目總投資 萬元,其中:建筑工程費 萬元,工程建設(shè)其他費用 萬元,基本預(yù)備費 萬元。建設(shè)目標(biāo)及內(nèi)容項目以原***中學(xué)為基礎(chǔ),結(jié)合新的城市總體規(guī)劃,將***中學(xué)擴展為包括初中和高中部的完全中學(xué),同時將***小學(xué)遷至中學(xué)北側(cè),形成該區(qū)域內(nèi)一個完整的教學(xué)中心目標(biāo)。二、編制的依據(jù) 《國家教育事業(yè)發(fā)展“十一五”規(guī)劃綱要》 ; 《***市城市規(guī)劃行政技術(shù)規(guī)定》 (試行稿) ; 《建設(shè)項目經(jīng)濟評價方法與參數(shù)》(第三版); 《**省中小學(xué)教職工編制標(biāo)準(zhǔn)意見》 ; 《城市普通中小學(xué)校校舍建設(shè)標(biāo)準(zhǔn)》 ;項目單位提供的相關(guān)資料三、編制原則及研究范圍編制原則(1)科學(xué)規(guī)劃、合理布局的原則。四、主要技術(shù)經(jīng)濟指標(biāo)主要技術(shù)經(jīng)濟指標(biāo)表表 1—2序號 項目名稱 單位 數(shù)量 備注1 占地面積 平方米 bed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, abed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, a 52 建筑面積 平方米 高中部教學(xué)樓 平方米 高中部實驗樓 平方米 科技圖書樓 平方米 文體綜合樓 平方米 師生食堂 平方米 學(xué)生公寓 平方米 行政樓 平方米 小學(xué)綜合樓 平方米 原有初中教學(xué)實驗樓擴建 平方米 遠(yuǎn)期規(guī)劃建筑 平方米 3 投資 萬元 建筑工程費 萬元 工程建設(shè)其他費用 萬元 基本預(yù)備費 萬元 4 配套工程 水 立方米/ 天 新增 電 千瓦 新增 暖 千瓦 新增五、研究結(jié)論經(jīng)過對本項目的背景與需求分析,工程技術(shù)方案、環(huán)境、組織管理等多方面的可行性研究,結(jié)合項目建設(shè)的實際情況,本報告認(rèn)為,bed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, abed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, a 6***市***中學(xué)擴建項目是可行的,也是十分迫切需要的。 “四機一幕”完全進入教室,理化生實驗室規(guī)范達標(biāo),有多媒體網(wǎng)絡(luò)教室、電子備課室、語音室、電教室、閱覽室、音樂和美術(shù)專用教室,這些先進的教學(xué)設(shè)備為全面落實素質(zhì)教育奠定了良好的基礎(chǔ)?,F(xiàn)有的教學(xué)條件與日益擴大的教育需求存在著以下矛盾:一是校園面積過小,生均占有的活動空間不多,不利于學(xué)生的身心健康發(fā)展;二是由于教室數(shù)量少,班級學(xué)生容量大(平均每班超過 70 人) ,另一方面,多媒體教室、實驗室又相對匱乏,不利于達到最佳教學(xué)效果;三是教師辦公室及生活用房緊缺,難以為廣大教職工提供有力的后勤保障。設(shè)計方案完成***中學(xué)擴建項目已完成總體規(guī)劃設(shè)計方案,校園整體建設(shè)風(fēng)格、高中部綜合教學(xué)樓、實驗樓、圖書樓、辦公樓、學(xué)生宿舍、餐廳、體育場、小學(xué)教學(xué)綜合樓等具體設(shè)計方案已經(jīng)完成。***小學(xué)項目用地總面積 平方米,用地四至為:東鄰居住區(qū),南鄰規(guī)劃路,西、北均鄰居住區(qū),場地東西與南北長度均約為100 多米。北以外長城為界,與內(nèi)蒙古自治區(qū)豐鎮(zhèn)、涼城縣毗鄰,西、南與本省朔州市、忻州地區(qū)相連,東與河北省陽原、淶源、蔚縣相接。社會環(huán)境條件***市位于省境北部,介于內(nèi)外長城之間, 是***盆地的中心。城市自來水管網(wǎng)直接接入學(xué)校建設(shè)的蓄水池,然后再利用加壓泵提升,送入各用水建筑物,院內(nèi)供水管網(wǎng)設(shè)計管徑和流量均能滿足新建項目的生活用水及消防用水要求。注重校園室外空間環(huán)境的設(shè)計,為師生提供不同層次、不同形式的交往聚合場所和活動空間。建筑材料和結(jié)構(gòu)形式的選擇,應(yīng)符合建筑耐久年限、防火、抗震、防洪、建筑節(jié)能、保溫隔熱等方面的要求。每層設(shè)置多個自習(xí)室作為學(xué)習(xí)場所。小學(xué)綜合樓主要房間組成bed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, abed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, a 17每間使用面積 間數(shù)使用面積合計用房指標(biāo)(M2) (間) (M2)備注普通教室 66 36 2376自然教室 54 2 108計算機教室 146 1 146地理教室 55 1 55大報告廳 726 1 726辦公室 20 11 2文體綜合館體育比賽大廳為長方形,可利用活動看臺調(diào)節(jié)比賽場地,滿足各種球類、體操等體育項目的比賽需要,并可進行大型集會和文藝演出。裝飾:普通房間及內(nèi)墻面采用抹灰面,106 涂料。外門窗為鋁合金窗或塑鋼復(fù)合窗,內(nèi)門窗為木門窗。景觀綠化系統(tǒng):充分體現(xiàn)周邊的自然景觀;入口廣場等開敞空間綠地景觀、建筑小品的塑造;既滿足教學(xué)也滿足觀賞的生態(tài)植物景點;學(xué)校的廣場是學(xué)校的主要集聚空間;建筑單體和道路之間亦因地制宜,進行敞開式綠化。雨水及污水總管網(wǎng)直接排入市政雨水和排污管網(wǎng)。設(shè)有一般照明、事故照明、應(yīng)急標(biāo)志照明。熱負(fù)荷計算供熱指標(biāo):建筑物:75W/m 2新增采暖面積:60910m 2,采暖熱負(fù)荷 。(4)室內(nèi)各層均根據(jù)《建筑滅火器配置設(shè)計規(guī)范》規(guī)定設(shè)置滅火器。(2)主要控制措施廢氣污染控制措施施工期間的料堆、土堆等應(yīng)加防起塵的措施,挖出的土壤等固體廢棄物應(yīng)及時清運,運輸車輛要采用防止散落和塵土飛揚的措施;工地周圍用圍墻或防護板圍護,減少工地?fù)P塵對環(huán)境的影響;保持出入口的路面清潔、濕潤,以減少汽車車輪滾動引起的揚塵。廢物處理本項目平均日產(chǎn)固體廢物,為生活垃圾。(2)圍護結(jié)構(gòu)熱工設(shè)計參數(shù)圍護結(jié)構(gòu)熱工設(shè)計符合《公共建筑節(jié)能設(shè)計標(biāo)準(zhǔn)》GB50189—20xx和《民用建筑節(jié)能設(shè)計標(biāo)準(zhǔn)(采暖居住建筑部分)***地區(qū)實施細(xì)則》(DBJ04—216—20xx)規(guī)定。大力推廣實用節(jié)水型衛(wèi)生器具和配水器材是建筑節(jié)水的一個重要方面。采暖供熱系統(tǒng),嚴(yán)格按設(shè)計符合設(shè)置。項目管理組項目負(fù)責(zé)人資料整理 后勤保障 質(zhì)量監(jiān)督 外部協(xié)調(diào) 投資控制bed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, abed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, a 31項目財務(wù)管理設(shè)立項目專用賬戶,