【正文】
Excel, PDI, FTT … 13 Convoy Yard Review每日品質(zhì)會議 Review Vehicle Quality Review Concern Actions 14 QOSQuality Operating System ? Variability Reduction VRT/VFG ?a structured process to drive quality improvement focused on customer expectations. It ensures that plant controllable customer concerns are acted upon quickly and permanently. ? Tool Verification ?ensure regular inspection and certification of plant test equipment, tools, and gages is being conducted per the corporate guidelines. 15 QOSQuality Operating System ? Ining Material ?measures plant effectiveness in improving and controlling the quality of material entering the plant. A working relationship with the plant, suppliers, purchasing, and other key activities is essential for quality improvement. ? Process Control / Build Inspection Process ?identify requirements for controlling specific operations and inspections. Those requirements e from practices and/or procedures that are the infrastructure of the assembly Vehicle Operations QOS. ?CC’s, SC’s, CTQ… 16 QOSQuality Operating System ? Repair System ?a formalized repair process assuring the preparation, repair, material, and tooling/equipment used are in accordance with established/approved repair standards. ? Quality Acceptance Criteria ?established level of standards to be used for inspection. ?the criteria must then be cascaded throughout the plants. ?to assure that every inspection/check/test is performed to the same standards throughout the entire system. 17 QOSQuality Operating System ? Weld Surveillance ?In process checks of welded assemblies, when coupled with periodic tear down of welded bodies and assemblies, provide a positive method of determining weld quality. ?ensure that all weld production operations are being effectively performed. ? Dimensional Control ?a prehensive body sheet metal construction strategy that takes into account all key body sheet metal ponents and their relationships to each other and bodylines. ?to identify, track, and reduce dimensional variation from ponent to ponent and vehicle to vehicle 18 QOSQuality Operating System ? Torque Assurance ?to assure that Fastening Control System implementation is standardized and effective across all assembly plants. ? FCPA ?to identify manufacturing imperfections through a series of a Static/Dynamic/Full (bination of static dynamic) audits of finished units. ?使顧客導(dǎo)向所發(fā)現(xiàn)的問題直接回饋到生產(chǎn)線,以求獲得迅速對策及改善方案。 ? 2023年起廠內(nèi)開始推動 Six Sigma品質(zhì)改善專案活動 。水準(zhǔn) ,程度 ) 4 2. 福特六和品質(zhì)管理之發(fā)展演進(jìn) 1/4 ~1986 Introduction/Localization ? 引入福特原廠產(chǎn)品開發(fā)標(biāo)準(zhǔn)如 Worldwide Design Requirement 及 Worldwide Product Acceptance Specifications 。 ? 1990年 引擎鑄造廠 獲頒象徵福特品質(zhì)最高榮譽(yù)的 Q1獎 ? 1991年 裝配廠 獲頒象徵福特品質(zhì)最高榮譽(yù)的 Q1獎 。t make it and don39。無法達(dá)到對品質(zhì)的期望值。 ? 共 27個 QOS單元要求, 62個評分項目 。 7 福特六和品質(zhì)管理之發(fā)展演進(jìn) 4/4 1996~now Transformation/ Internationalization ? 1996年起開始推動福特生產(chǎn)系統(tǒng) FPS(Ford Production System)。不接收不良 ,不傳送不良 Chairman of the board (口徑 。 6 福特六和品質(zhì)管理之發(fā)展演進(jìn) 3/4 1991~1996 Upgrading/ Standardization ? 建置 QIS(Quality Information System)系統(tǒng),在生產(chǎn)線上直接反應(yīng)品質(zhì)問題並於第一時間即時改善 。t pass it on. 3. Culture: A relentless daily focus on quality. 4. Training: Ensuring people have the necessary skills and tools to do their jobs. 5. Accountability: Effective measurement and feedback for continuous improvement accountability and performance metrics. 6. Cooperation: Help suppliers help us succeed. 7. Joint Leadership Commitment: Effective Quality Leade