【正文】
e semifinished products awaiting inspection shall be maintained and stored in the warehouse by zone, and be attached with the awaitinginspection labels. Make records properly. 程 序 文 件 Procedure Document 重慶英特空調(diào)有限公司 Air International Chongqing Co., Ltd. 文件名稱 (Doc Name): 檢驗(yàn)和試驗(yàn)狀態(tài)控制程序 Inspection amp。 Each use department is responsible for declaring its own labels, while the Manufacturing Department shall acplish the fabrication. 程 序 文 件 Procedure Document 重慶英特空調(diào)有限公司 Air International Chongqing Co., Ltd. 文件名稱 (Doc Name): 檢驗(yàn)和試驗(yàn)狀態(tài)控制程序 Inspection amp。程 序 文 件 Procedure Document 重慶英特空調(diào)有限公司 Air International Chongqing Co., Ltd. 文件名稱 (Doc Name): 檢驗(yàn)和試驗(yàn)狀態(tài)控制程序 Inspection amp。 The Engineering Department is responsible for identifying the test status of the products. 各使用部門負(fù)責(zé)本部門標(biāo)牌的申報(bào),制造部組織制作。 The quality records, labels and quality inspection reports must carry product name, drawing number, quantity, lot number, inspection date, production date and level. 標(biāo)識(shí)過程 Identification Process 待檢狀態(tài) AwaitingInspection Status a) 采購的原材料、協(xié)配件,待檢半成品,由倉庫保管,按指定區(qū)域存放,并分別掛上待檢 標(biāo)識(shí),并作好記錄。倉庫保管員接到通知后立即換上不合格標(biāo)識(shí),隔離存放。 Test Status Control Procedures 版次 Ver 頁次 Page 發(fā)行日期 Release Date 文件編號(hào) (Doc No): AICQ/QP1201 B/0 5 6 20xx0110 后,標(biāo)識(shí)必須隨著標(biāo)識(shí)物移置作相應(yīng)轉(zhuǎn)換。 Test Status Control Procedures 版次 Ver 頁次 Page 發(fā)行日期 Release Date 文件編號(hào) (Doc No): AICQ/QP1201 B/0 6 6 20xx0110 a) 待檢:黃色 Awaiting Inspection : Yellow b) 合格:綠色 Acceptable: Green c) 不合格:紅色 Unacceptable: Red d) 已檢待定:藍(lán)色 Inspected But Unconfirmed: Blue 6 相關(guān)文件 Specific Document AICQ/QP130100 《不合格品控制程序》 AICQ/QP130100 “Nonconforming Product Control Procedures”