freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

汽機(jī)施工組織設(shè)計(jì)(英(更新版)

2025-08-05 10:39上一頁面

下一頁面
  

【正文】 ...............................................42 Civil construction .........................................................................................................43 Environment protection.................................................................................................44 8. Manpower resource and machinery and tools allocation plan ......................................................45 Manpower resource plan ...............................................................................................45 Training ......................................................................................................................45 9. Finished product protection ....................................................................................................46 Equipment, material storage and stack ............................................................................46 The protection in installation .........................................................................................46 10. Main construction scheme and technical measures of the steam turbine ........... 錯(cuò)誤 !未定義書簽。 Work Instruction....................................................................... 錯(cuò)誤 !未定義書簽。 1439。 evaluation item lists and acceptance sheets. According to “Control Procedure of Construction Process”, take change of supervision and instruction of erection quality, procedure and safety. Help subconstrictors of ZELAND perform selfcheck and cooperate with ZELAND perform check and acceptance of erection quality. Help zeland manage general plane of erection site. Help zeland perform the safety management of erectoin site. According to the procedure of erection, help zeland arrange the time of entering construction points of erection anizations and relevant personnel. Duty of construction subcontractor Prepare work instructions, construction technical schemes and working plans of all specialties. India Amarkantak Power Plant Project Construction Engineering Rev:0 11 Perform erection working according to the approved erection plans, quality plans, erection instructions and erection task sheets and provide technical records that conform to the requirements. Take charge of quality acceptance of grade 1 and 2 specified in quality acceptance item list. Take charge of preparing the demand plan of the materials. Take charge of marking the materials and equipments in the erection process. Put forward the training requirements of welding worker, heat treatment worker special working personnel and other personnel. Prepare enough labor force with qualification and construction machines and tools to assure reaching schedule and quality target specified in advance. Take charge of protecting all the finished products in the contracting range during construction. Take charge of routine maintenance and service of construction machines and equipments. Take charge of safety and civilization construction in the construction range. India Amarkantak Power Plant Project Construction Engineering Rev:0 12 Owner Quality Supervisor amp。C electric Hoisting Oil paint heat preservation South of C axis Material High voltage Cable Spreader Steel frame Reality Onsite supervision department Onsite management department Technical design department Boiler group Turbine group Electric group Welding group Iamp。 C (b) Minimum Dry bulb temperature : 176。 Acceptance of Electric Power Construction” (For turbine, boler,electric ,Iamp。 Erection of the steam turbine body ..................................................... 錯(cuò)誤 !未定義書簽。 High pressure installation technology measures ................................... 錯(cuò)誤 !未定義書簽。C, pipe, welding and chemistry of power plant chemistry of power plant ) of electric power industry standard of P. . “Safety Work Rule of Electric Power Construction” of electric power industry standard of P. . Design drawings and technical instruction by Huadong Electric Power Design Institute of P. R. C. Design drawings and technical instructions by all manufacturers of P. R. C. Explanation of the preparation It aims at assuring quality of the project and pleting the construction tasks provided in the contract of the project safely and orderly on time with highefficiency to prepare construction engineering. This construction engineering is prepared based on the existing documents and will be perfected further according to the revised deign drawings and manufacturers’ documents. Construction anizations on the site shall perform the normative construction according to this construction India Amarkantak Power Plant Project Construction Engineering Rev:0 4 engineering and is instructed by the supervisors and technicians to be convenient for construction anization and management on the site. 2. Description of the project the scale of the project This project includes installing 300MW bustion coal unit and their auxiliary equipments and systems. Project information Location : 16 KM from Korba on KorbaChampa state Highway, Korba District Longitude : 82176。 STEAM SAMPLING SYSTEM SET 1 CONDENSER POLISHING SYSTEM SET 1 India Amarkantak Power Plant Project Construction Engineering Rev:0 8 SL. NO. NAME UNIT QUANTITY Iamp。 (5) making full use of machine and tools as well as field arrange work and rest time reasonably through anization and mand to get a high use rate of machines and tools and field. technology management Flow chart of construction technology management can see figure 4: preparing unit erection anization sche
點(diǎn)擊復(fù)制文檔內(nèi)容
研究報(bào)告相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1