of unit project, branch project, subentry project, establish starting report program of all levels, on the one hand, it is convenient for reviewing starting condition, on the other hand, it is good to take charge of schedule. Start construction for the one that should be started while prohibit starting the one that should not be started。C electric Hoisting Oil paint heat preservation South of C axis Material High voltage Cable Spreader Steel frame Reality Onsite supervision department Onsite management department Technical design department Boiler group Turbine group Electric group Welding group Iamp。C SYSTEM Distributed Control System (DCS) SET 1 DEH (turbine digital electrohydraulic control system) SET 1 ETS (turbine protection system) SET 1 Turbine Supervisory Instrument( TSI) SET 1 Boiler furnace gas temperature probe control system SET 1 Boiler Soot Blowing Control System SET 1 Boiler Power Control Valve (PCV) Control Device SET 1 Required construction time limit According to the special clauses of the contract signed by China and Iran, the first generator unit is put into operation in the fortyfourth month after the contract execution of contract (Date of execution of contract is Janauryr 11, 20xx)。 C (b) Minimum Dry bulb temperature : 176。 4339。 Acceptance of Electric Power Construction” (For turbine, boler,electric ,Iamp。 Turbine auxiliary equipment and machinery installation measures ......... 錯(cuò)誤 !未定義書(shū)簽。 Erection of the steam turbine body ..................................................... 錯(cuò)誤 !未定義書(shū)簽。 India Amarkantak Power Plant Project Construction Engineering Rev:0 2 Check and repair of equipment before erection .................................... 錯(cuò)誤 !未定義書(shū)簽。 High pressure installation technology measures ................................... 錯(cuò)誤 !未定義書(shū)簽。 India Amarkantak Power Plant Project Construction Engineering Rev:0 3 1. Basis of Preparation and Explanation Thermal power plant project of india 1200MW LANCO AMARKANTAK takes Zeland Project PVT LTD as general contractor and DONGFANF ELECTRIC CORPORATION the subcontractors of the equipments. For construction, civil work and installation is taken charge of by construction subcontractor, DEC take charge of supervision and necessary technical instruction on construction. It aims at assuring quality of the project and pleting the construction tasks provided in the contract of the project safely and orderly on time with highefficiency to prepare construction engineering, which can be provided to DEC for reference of anizing construction. According to the contract of the LANCO AMARKANTAK THERMAL POWER STATION 2 300 MW– UNIT 1 thermal power plant and the construction technology and manyyear supervision experience of our pany, we prepare this construction engineering as one of the documents of installation, supervision and technology instruction of erection plant project. Basis of preparation The contract of the India LANCO AMARKANTAK thermal power plant “Technical Specification of Construction amp。C, pipe, welding and chemistry of power plant chemistry of power plant ) of electric power industry standard of P. . “Safety Work Rule of Electric Power Construction” of electric power industry standard of P. . Design drawings and technical instruction by Huadong Electric Power Design Institute of P. R. C. Design drawings and technical instructions by all manufacturers of P. R. C. Explanation of the preparation It aims at assuring quality of the project and pleting the construction tasks provided in the contract of the project safely and orderly on time with highefficiency to prepare construction engineering. This construction engineering is prepared based on the existing documents and will be perfected further according to the revised deign drawings and manufacturers’ documents. Construction anizations on the site shall perform the normative construction according to this construction India Amarkantak Power Plant Project Construction Engineering Rev:0 4 engineering and is instructed by the supervisors and technicians to be convenient for construction anization and management on the site. 2. Description of the project the scale of the project This project includes installing 300MW bustion coal unit and their auxiliary equipments and systems. Project information Location : 16 KM from Korba on KorbaChampa state Highway, Korba District Longitude : 82176。 30 N Altitude : 285 M above MSL Seismic data (a) Seismic intensity : As per IS: 18931984 (b) Zone : II (c) Importance factor : (d) Basic Horizontal Seismic Coefficient factor : .2 Ambient Temperature (a) Maximum Dry bulb temperature : 176。 STEAM SAMPLING SYSTEM SET 1 CONDENSER POLISHING SYSTEM SET 1 India Amarkantak Power Plant Project Construction Engineering Rev:0 8 SL. NO. NAME UNIT QUANTITY Iamp。 instructor Figure 1 construction anization diagram ZELAND DEC project department Debugging technical guide and supervision department Files Technology Schedule Safety Construction subcontractor C Construction subcontractor A Construction subcontractor B Chemistry Pipeline Spreader Speed adjustment Reality Equipment Others Turbine Periphery Boiler Iamp。 (5) making full use of machine and tools as well as field arrange work and rest time reasonably through anization and mand to get a high use rate of machines and tools and field. technology management Flow chart of construction technology management can see figure 4: preparing unit erection anization sche