freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

建筑外文翻譯---全站儀在公路導(dǎo)線和中線測(cè)量中的應(yīng)用-建筑結(jié)構(gòu)(更新版)

2025-03-12 11:11上一頁面

下一頁面
  

【正文】 tment of these coordinates, so that a higher measurement accuracy. Point set should take into account the need to take the middle lane In the set point, not only should be wire line control points, that is, to point the center line should also prepare for the release, depending on the route pass conditions, 2021 級(jí)土木工程專業(yè)英語科技 文獻(xiàn)翻譯 6 and higher terrain can be laid at a number of aircraft equipment, the benefits of doing so is to take the middle lane when there is a greater choice and do not have equipment for an additional two points to allow devices to stop several times. 1. 4 Apparatus after the operation and staffing, as the role of staff Total Station with the road generally traversing a total of 5 ~ 6 people, depending on the location of the previous 3 to 4 people, equipment operator 1, the latter depending on a person. After the total station as the staff can record more points, the center line of the latter line of measurement and design can play a very large role. Works through the following specific examples to illustrate the importance of after, as the staff. Henan Provincial Highway 23 in Nanyang City Line to Bangladesh floor habitats Dengzhou secondary roads traversing alteration works, because it is the old GM, the measurement principle is to meet the regulatory requirements under the premise of using the old as much as possible. Easy to control the general line segment, and the Department in order to bend as much as possible along the old road on the bend radius must be a very suitable choice. We measured the key is: the people, as after the after, after, as, to turn the corner along the old release 5 ~ 6 bend radius control point, so Total Station to record the coordinates of points, so within the industry to deal with wires, the Department of these bend lines such as the use of design software in Haiti through the debug radius curves make as much as possible through these points. If both sides of a longer and a lot of flat curves Housing Department, later, as in the old curve measured 12 points to control the curve, including the industry deal with the position found in the plex curve is the best option to avoid the set caused by the demolition of a multiradius curves and linear nonideal errors. Wires should be noted that the issue of measurement Total Station with the wire used to fight some of the areas in need of special attention, otherwise large errors may arise even lead to rework.. 1) When the latter, as we must pay attention to people after the legislation, as the latter point of view and coordinate with the importation of equipment and take the points Consistent standard, it is best to use walkietalkie munications with each other 2021 級(jí)土木工程專業(yè)英語科技 文獻(xiàn)翻譯 7 like dots with a prism depending on the exhausted, the used equipment after the release point of view to see whether the same location, so that error probability can be reduced to a minimum. Henan Provincial Highway 48 in line Xixia throughout the wire measurement, as firsttime coordinates, apparatus, aircraft operators will view the site and post the coordinates of the antilost, resulting in Show map on your puter when the road at this location found that the 180
點(diǎn)擊復(fù)制文檔內(nèi)容
畢業(yè)設(shè)計(jì)相關(guān)推薦
文庫(kù)吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1