freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

建筑外文翻譯---全站儀在公路導(dǎo)線和中線測量中的應(yīng)用-建筑結(jié)構(gòu)-文庫吧

2024-12-30 11:11 本頁面


【正文】 、這中間全站儀隨時可以通過對講機來復(fù)核中線組自己用“穿桿法”放的點位。另外非常重要的一點是 :全站儀搬站的時間最好選在直線段上 ,這樣的好處是不讓中線組等著儀器搬站而停工。我們用這 種方法在省道豫 23 線南陽市境鄧州至孟樓段 (平原微丘區(qū) )二級公路改建工程的中線測量中 ,創(chuàng)出了一天敷設(shè) 10km 的速度。 3 結(jié) 束 語 全站儀在我國出現(xiàn)只是近幾年的事 ,大面積的普及應(yīng)用才剛剛開始 ,但它給我們帶來的方便已經(jīng)是非常顯著了。在全站儀的使用過程中 ,都會有自己的心得體會、經(jīng)驗技巧 ,如果每一個使用者都能將自己的經(jīng)驗奉獻(xiàn)出來 ,對我們大家來說都將是一筆不小的財富。 參 考 文 獻(xiàn) [1] JTJ061— 99, 公路勘測規(guī)范 [S]. 北京 :人民交通出版社 ,1999 [2] 聶 讓 .全站儀與高等級公路測量 [M].北京 : 人民交通出版社 ,~ 300 —— 出處:《交通科技》 2021年第 5期 2021 級土木工程專業(yè)英語科技 文獻(xiàn)翻譯 5 Total station in the highway center line conductors and Measurement Li chunsheng Zhao Bing Yang chun long (Nanyang City Planning Survey and Design Institute of Highway Traffic Nanyang 473003) Abstract: The total station in the highway center line conductors and the application of measurement techniques, the Total Station use matters needing attention. Key words: Total Station Road measuring techniques 1 Total station in the wire measurement Total Station Coordinate the advantages of Total Station can be used directly with the measuring point coordinate method, rather than polar coordinates law required, so that heavy equipment operators from the calculation of the data out. Outside the industry are now virtually no records, only a simple mind and the next point with the point of the relationship between the finishing industry for the reference period, but also do not have staff with a record of the calculation. Finishing in a time when the industry as long as the data transmission from the total station to PC2E500 calculator, or directly to the data input to a puter, after coordinate adjustment, on the puter using Auto CADdrawing software such as points, cutoff point, and calculated the angle value of each curve, the distance between the point of intersection as well as the coordinates of each pile and so. Note and the application of statecontrolled threedimensional coordinates of points Coordinates method used before, as far as possible the country to find control points and control points of these threedimensional coordinates, and these control points through the joint test, not only can test their measurement accuracy, and erroryun Xu scope can be carried out through the adjustment of these coordinates, so that a higher measurement accuracy. Point set should take into account the need to take the middle lane In the set point, not only should be wire line control points, that is, to point the center line should also prepare for the release, depending on the route pass conditions, 2021 級土木工程專業(yè)英語科技 文獻(xiàn)翻譯 6 and higher terrain can be laid at a number of aircraft equipment, the benefits of doing so is to take the middle lane when there is a greater choice and do not have equipment for an additional two points to allow devices to stop several times. 1. 4 Apparatus after the operation and staffing, as the role of staff Total Station with the road generally traversing a total of 5 ~ 6 people, depending on the location of the previous 3 to 4 people, equipment operator 1, the latter depending on a person. After the total station as the staff can record more points, the center line of the latter line of measurement and design can play a ver
點擊復(fù)制文檔內(nèi)容
畢業(yè)設(shè)計相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1