【正文】
slope using dual slope, slope respectively % %. The lining of tunnel with posite lining, cross section form curved wall arch section, portal for the end walls of the portal, and dark tunnel lining of the same form, carried by opencut method, dark hole using the new Austrian tunneling method, tunnel ventilation and lighting design in accordance with the speed of100km/h design. The main elements of design include: the tunnel location, vertical and horizontal tunnel level design, portal design and Myeongdong, lining and support the design, construction design, drainage design, lighting design, such as ventilation. Operator experience, the tunnel design is reasonable, feasible, to meet the Suifenhe Highway qiqihar service levels. Keywords: Tunnel。......................................................................................................................................... I Abstract ............................................................................................................................. II 第 1章 緒論 ....................................................................................................................... 1 ................................................................................................... 1 ....................................................................................................... 1 ....................................................................................................... 1 .國內(nèi)外研究狀況 ...................................................................................................... 2 ................................................................................................... 2 ................................................................................................... 2 ................................................................................................................... 3 技術(shù)標(biāo)準(zhǔn) .......................................................................................................... 3 設(shè)計(jì)標(biāo)準(zhǔn) .......................................................................................................... 3 . 建筑材料選用 ......................................................................................................... 3 . 擬解決的主要問題 ................................................................................................. 3 第 2章 大奧山隧道總體設(shè)計(jì) ....................................................................................... 4 .大奧山隧道工程概況 .............................................................................................. 4 大奧山隧道水文地質(zhì)概況 ...................................................................................... 4 地形、地貌 ...................................................................................................... 4 工程地質(zhì) .......................................................................................................... 4 水文地質(zhì) .......................................................................................................... 5 地震烈度等級的確定 ...................................................................................... 5 ........................................................................................................... 5 大奧山隧道選址 ...................................................................................................... 5 隧道選址原則 .................................................................................................. 5 大奧山隧道選址 .............................................................................................. 6 隧道洞口選擇及線型設(shè)計(jì) ...