freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

站內(nèi)露空管道系統(tǒng)安裝方案k-免費(fèi)閱讀

  

【正文】 pipe prefabrication yard and temporary laydown area see Temporary Facilities Method Statement for Temporary Facilities of Individual Constrution of all well pads and gathering stations. B 集氣站: 埋地管道材料堆放Mat er i al pi le u p o f un der g ro un d塔架材料堆放與加工Mat er i al pi l e up a n d pr o ces sin g ar ea o f tower str u ct u r e臨時(shí)廁所(已建)Temp o rar y rest r oom (h ave bee n b uil t )防腐噴砂區(qū)域(已建)Area fo r sand b la ston g and d er usting ( h ave bee n b uil t )擬定的 庫(kù)房(未建 )The sto ck area (plan to b uil d)鋼結(jié)構(gòu)與工藝管道預(yù)制場(chǎng)地(已建 )Fab rica tio n y ard fo r stee l structu re a nd p ipe s ( h ave b ee n built ) C 井站: C 井站管道預(yù)制區(qū)設(shè)在凈化廠集氣末站區(qū)域內(nèi),預(yù)制完成后拉運(yùn)至 C 井站進(jìn)行安裝; 站內(nèi)露空管道系統(tǒng)安裝方案 Method Statement for Installation of Exposed Pipeline in Well Pad and Gathering Station 8 ? 組裝 Fitting ( 1) 預(yù)制管道組裝前,管道主管應(yīng)檢查以下內(nèi)容: Prior to fitting the prefabricated pipes, the following checks shall be carried out by the Piping Foreman: A對(duì)比圖紙檢查 管段 的長(zhǎng)度 Length of spool against the drawing(s) B 材料 應(yīng) 符合 設(shè)計(jì)圖紙要求的規(guī)格和等級(jí) 。 材料的檢查 及驗(yàn)收 Acceptance inspection of materials 管段預(yù)制 Prefabrication 運(yùn)到現(xiàn)場(chǎng) Delivery to the site 現(xiàn)場(chǎng)組裝焊接 Assembly amp。 Carry out site water and power supply, construction site preparation and construction area cleaning etc. . 流程 Process Flow 管道 系統(tǒng) 施工流程如下: Construction flow of pipeline system is as below: 站內(nèi)露空管道系統(tǒng)安裝方案 Method Statement for Installation of Exposed Pipeline in Well Pad and Gathering Station 6 . 材料 檢查及驗(yàn)收 Acceptance Inspection of Check 材料到場(chǎng)后, SPC 會(huì)同 SPCS、 CDB 質(zhì)量工程師進(jìn)行驗(yàn)收檢驗(yàn),如下列材料: When materials arriving on site, SPC, SPCS and CDB quality engineers jointly inspect and accept them. Materials are as following: ( 1) 鋼管 Steel Pipe 鋼管尺寸和形位應(yīng)符合其產(chǎn)品標(biāo)準(zhǔn)的要求,抽查比例為 10%,且不少于 1件,若有不合格,應(yīng)全 部檢查。 Operator should attend the HSE training by CDB and obtain relevant vouchers before operation. ? 為了提高所有人員的環(huán)保意識(shí),將進(jìn)行班前講話和必要的培訓(xùn)課程。 Execute emergency response in accordance with General Plan of Emergency Rescue CDB0000HESPLN SC20000000100. ? 如遇到任何醫(yī)療、安保意外或安全事件、事故,工作人員應(yīng)按照相關(guān)程序聯(lián)系以下人員。 The site should arrange full time safety inspectors, set up warning line and warning signs. Site patrol inspection is required. ? 檢查 施工 的電源線應(yīng)完好無(wú)損,布置合理,固定牢固。 During working, every employee has right and responsibility to ―STOP‖ the unsafe behaviors. ? 現(xiàn)場(chǎng)文明施工管理,需要規(guī)劃臨時(shí)設(shè)施、管道堆放地點(diǎn)并有序擺放。腳手架 /平臺(tái)搭設(shè)完畢經(jīng)檢查驗(yàn)收,掛牌后才能使用。 All individual tasks mentioned in this method statement will be subject to individual JSA, risk assessments and toolbox talks by CONTRACTOR InSitu before work mences on a daily basis. . HSE要求 HSE Requirements ? 作業(yè)前應(yīng)根據(jù)作業(yè)內(nèi)容辦理相關(guān)許可,如綜合作業(yè)許可、熱工作業(yè)許可、受限空間作業(yè)許可、射線作業(yè)許可、開(kāi)挖作業(yè)許可等。 WELDING ................................................................................................................ 13 . 閥門(mén)安裝 VALVE INSTALLATION ............................................................................................................................ 14 . 與設(shè)備管嘴的連接 CONNECTION TO EQUIPMENT NOZZLE ................................................................................ 15 . 法蘭連接 FLANGE CONNECTION ........................................................................................................................... 15 . 管道支吊架安裝 PIPING SUPPORT AND HANGER INSTALLATION......................................................................... 16 . 吹掃試壓 BLOWING AND PRESSURE TEST ............................................................................................................. 17 6. 質(zhì)量監(jiān)視 QUALITY SURVEILLANCE ................................................................................................................... 17 . 一般性檢驗(yàn) GENERAL INSPECTION ....................................................................................................................... 17 . 質(zhì)量控制及檢查應(yīng)根據(jù)以下文件進(jìn)行: QC/QA SHALL REFER TO THE THE FOLLOWING DOCUMENTS: ........ 18 7. HSE 管理 HSE MANAGEMENT.............................................................................................................................. 18 . 安全教育 SAFETY EDUCATION............................................................................................................................... 18 . 施工現(xiàn)場(chǎng) CONSTRUCTION SITE ............................................................................................................................. 19 . 吊裝 LIFTING .......................................................................................................................................................... 19 . 電、氣焊作業(yè) ELECTRICAL, GAS WELDING OPERATION..................................................................................... 19 . 用電安全 ELECTRICAL SAFETY ............................................................................................................................. 20 . 主要參考文件 MAIN REFERENCES........................................................................................................................ 20 8. 人員安排 PERSONNEL ARRAGEMENT................................................................................................................ 20 . 人員 PERSONNEL..................................................................................................................................................... 20 . 溝通 COMMUNICATION ........................................................................................................................................... 21 9. 設(shè)備 EQUIPMENTS ..................................................................................................................................................... 21 10. 材料 MATERIALS ................................................................................................................................................... 22 11. 報(bào)告和記錄 REPORTING AND RECORDS ..............................................................................................
點(diǎn)擊復(fù)制文檔內(nèi)容
環(huán)評(píng)公示相關(guān)推薦
文庫(kù)吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1