P facilities. The plant will prises Process Units, Utilities, Offsites including tankfarm, road loading/unloading, infrastructure facilities including Control Building and Administrative Buildings and Buildings for other services. A site Jetty is to be setup with 600 Ton unloading / 聚四氫呋喃 裝置是一個(gè)獨(dú)立設(shè)施,但一些公用和輔助設(shè)施是和 SCIP 的設(shè)施相關(guān)的。 METHOD STATEMENT OF BASF INTERMEDIA THF / POLYTHF PROJECT 巴斯夫中間體 四氫呋喃 /聚四氫呋喃項(xiàng)目 CIVIL, UNDERGROUND PIPING AND BUILDING WORKS 土建、地下管道和建筑 工程 Civil Works, Underground Piping amp。 Building Works. 中國 上海 漕涇 巴斯夫中間體 四氫呋喃 / 聚四氫呋喃項(xiàng)目 的土建、地下管道和建筑工程 . Name of Owner and Contractor 業(yè)主和承包商名稱 Owner: BASF Chemicals Company Limited 業(yè)主: 巴斯夫 化學(xué)有限公司 Contractor: Technip Tianchen Chemical Engineering Company Limitted 承包商: 德希尼布 天辰化學(xué)工程有限公司 The Contractor is entrusted by Owner to represent and act on behalf of Owner, with the engineering, procurement, and construction management of the project. 業(yè)主委托承包商代表業(yè)主 負(fù)責(zé) 項(xiàng)目的設(shè)計(jì)、采購和施工管理。 The Project site is about 56 km away from the Shanghai City and 60 km from Pudong International Airport. It is about 15 km from the Shanghai Petrochemical Corporation. Its geographic location is 120o28’E and 30o46’N. The site is a reclaimed 56Civil Works, Underground Piping amp。場地屬于填海再造 地區(qū)。 Building Works Method Statement 6/66 Concrete Supply System Concrete shall be bought from local concrete batching plants with enough capacity to meet the demand of continuous concrete supply. Mixer truck and concrete pump will be used for concrete delivery. Rebar Processing Shop A rebar processing shop with two process lines will be located in the working area, which is capable to meet the demand of site construction. Prefabrication Yard of Structural Steel in Small Size Manufacture or process of small steel ponents needed during the construction of the project in a certain place shall be provided within the working area. Site Laboratory Installing and providing the laboratory with the facilities on site for testing and required items shall be approved by the Contractor for its conformity to specification prior to putting it into use. Temporary Store Set up a temporary store with the area of 180m2 to have the material and semiproduct in stock indoors. Another open storage area about 3000 m2 shall be used. Construction Power Supply Power supply to site shall be connected with the main power supplied by the Owner and Contractor. During the construction period, it shall be the provision of a generator. Construction Water Supply Water shall be provided from the main water system for temporary facilities camp, working site respectively by installing pipe with pumps led to each connection. Pipe pressure and flow shall also meet the demands of fire fighting consumption. Communication System Each of working site shall be installed and provided with telemunication system allowing for mobile phones and walkietalkies. Civil Works, Underground Piping amp。 Building Works Method Statement 10/66 Contract Department Deputy Project Manager Project Manager QA/QC Department Technical Department Construction Department HSE Department M. amp。 d) To deal with financial settlement with the Owner and Contractor as well。 c) Technical preparation for unit work before its mencement。 b) To be responsible for the settlement and coordination of the relations of the other Construction contractors。 f) To be responsible for the progress of the Works。 d) To guard against thefts for all materials, equipment, etc. on site。 Building Works Method Statement 3/66 c) To purchase miscellany materials and gadgets。 d) To keep in contract with local authorities。 d) Supervising sampling and testing of materials。 d) Prepare the main materials and equipment procurement schedule。 c) Assist the Design Institute in implementation and optimization of Civil Works, Underground Piping amp。 3) Construction Department Manager a) In charge of the management of the construction works of the site under guidance of the project manager. To deal with the problems related to the project through negotiating with the relevant panies. b) Organize professional members to control the construction works including progress, quality, cost control, anize and correspond contracts and concerned information, safety and civilization work site, etc. c) Prepare the weekly and monthly schedules for site construction, and keep the construction progress according to the schedules。 g) Be responsible for protection of the finished and semimanufactured work on site。 d) Set up and implement the personnel HSE training schedule。 Civil Works, Underground Piping amp。 e) Be responsible for the fixed asset management including check, acceptance, custody, releasing and maintenance. 6) Administration Department Manager a) Establish the document management system, be responsible for the receiving, dispatching, transferring, printing, registration, filing。 d) Be responsible for the external affairs and public relationship。 h) Keep in close touch with the local government, public security, and fire protection, industrial and merce authorities to get the support. 7) QA/QC Department Manager a) With the leading of home office and project manager, be in charge of site construction quality control。 Civil Works, Underground Piping amp。 Building Works Method Statement 3/66 Where the excavation reveals a bination of suitable and unsuitable materials, the excavation shall be carried out in such a manner that the suitable materials are excavated separately for use in the Wo