【正文】
B——BB seam section area[τ]——3號(hào)鋼的允許抗剪應(yīng)力, [τ]查自《重型設(shè)備吊裝手冊》附表71,冶金工業(yè)出版社出版。 。[τth]——3 steel seam allowable tensile, pressure and cutting stress, reference from Heavy Equipment Hoisting Manual attached 72, Yejin Industrial Publisher又因?yàn)樵诿總€(gè)漲圈吊耳左右都布置一塊龍門卡板,所以龍門卡板的數(shù)量為20*2=40塊;And two sides of the lifting ear should set a piece of gantry plate, so the total number of gantry plates is 20*2=24.所以每塊龍門卡板的受力為:and then the stress on each gantry plate shall be:G11=G/n=124/40==31000N式中:G11——龍門卡板的最大受力; Maximum stress on gantry plateG——整個(gè)罐體的起重重量; Total weight of whole tankn——龍門卡板的數(shù)量。According to the calculation above, the lifting ear size could meet relevant requirement. 龍門卡板的強(qiáng)度計(jì)算:Calculation for gantry plate 龍門卡板的受力圖:Stress analysis for gantry plate圖7: 龍門卡板的受力圖Fig 7: Stress Analysis of gantry plate 各主要受力剖面的承載力:major force undertaking section loadingFAA=[τ] [σ] [τ] reference from Heavy Equipment Hoist Manual attached 72, Yejin Industrial PublisherA1——AA部面的截面積;A1——AA section areaA2——BB部面的截面積; A2——BB section area 各主要受力焊縫的承載力:Major loading seamFCC=[τth] According to the calculation above, the size of the lifting ear can meet requirement 漲圈上吊耳的強(qiáng)度計(jì)算: Calculation for the lifting ear on expanding ring 漲圈上吊耳的受力圖:Strength analysis sketch of lifting ear on expanding ear 圖6:漲圈上吊耳的受力圖Fig 6: Stress Analysis of Lifting Ear on Expanding Ring 各主要受力剖面的承載力:loading on major force undertaking sectionFAA=[σ]A6=120*250*12=360000N=36tG1=FGG=[τth] [σ], [τ] are found from Heavy Equipment Hoisting Manual attached form 71A1——AA部面的截面積;A1——AA section areaA2——BB部面的截面積;A2——BB section areaA3——CC部面的截面積;A3——CC section areaA4——DD部面的截面積。A2=100*(80+80)*12=192000N==G1=FCC=[σ]4500)/4500=(*200+*4500)/4500 =[F]=Fmax/n=10/6=式中:T3——φ14㎜鋼絲繩的拉應(yīng)力; [F]——φ14㎜鋼絲繩的許用應(yīng)力; n——安全系數(shù),n=6。 ∴ adoptφ219*7 seamless pipe can meet relevant requirements.由以上可知,要是不加φ14㎜的鋼絲繩,MT2便能保證桅桿不會(huì)彎曲變形。 ∴ adoptφ219*7 seamless pipe can achieve requirements. 桅桿的抗彎矩極限承載力:Utmost load of antibending momentM=[σ] K2——refers to nonuniformity coefficient 桅桿軸向承載力的極限:Ultimate axial bearingG2=[σ]cos5176。If the hoisting height (H) is 10meters, calculation process is same as specification above, and wind load shall be smaller than that of H=20. 結(jié)論:Conclusion根據(jù)以上計(jì)算可知,在風(fēng)速為7m/s 或7m/s以下的情況下,罐體的提升工作是安全的。If wind load exists, the manual pulley at the opposite side of the stress surface impacted by the wind load will be exposed to great risk, so it is necessary to analyze whether the load of the chain block can meet the work requirements of the bined action of gravity and wind exist.F0 G1F=P*A=*400==G=mg=124*1000*=1215200N=G1=G/h=FO=(F2+G12)1/2=(+)1/2=F1=10*1000*=98000N=98KN∴FO=F1=98其中:FO在重力和風(fēng)力的共同作用下的合力;F風(fēng)載荷在罐體正面產(chǎn)生的風(fēng)力;G罐體的最大起升重力;G1單根桅桿的靜態(tài)承載力;F1手拉葫蘆倒鏈的最大承載力。 maximum weight, expanding ring and manual pulley. Therefore, TXX12 (124t) with maximum weight is adopted to carry out this calculation. Detailed tank data is shown in Table 1(TXX12A,5412B,5412C, 5410). 計(jì)算過程:Calculation Process 風(fēng)載荷計(jì)算:確定以φ20*20m的儲(chǔ)罐來計(jì)算所有直徑φ20m的儲(chǔ)罐的風(fēng)載荷。Before every lifting, inspect and make sure the section area of the weld to meet the WPS amp。When hoisting with manual pulleys, the main potential safety hazard is that if the chain of one of the manual pulleys is broken down, the tank body will tilted to the side with broken chain due to the weight of tank body, which will thus cause other adjacent manual pulleys to be broken down due to the added weight and produce a serial of chain reaction and safety accident.,即使在斷一條鏈時(shí),另外臨近兩個(gè)手拉葫蘆仍能承受相應(yīng)增加的罐體重量,以此符合HSE要求??v縫和環(huán)縫焊完后,應(yīng)按設(shè)計(jì)要求對壁板的幾何尺寸和焊縫質(zhì)量進(jìn)行檢驗(yàn)。 A person specially assigned shall conduct the pulley operators. When the tank body is lifted every 30mm height, the person shall be responsible for checking the hoisting of tank wall to ensure that the lifting speed is consistent in all directions and to keep the lifting as consistent as possible. The time spent on lifting individual ring depends on tank size, weight. Generally speaking: if the tank diameterφ≤16 meters, and each pulley loading smaller than 1/3 of maximum loading, it shall cost 2 hours for hoisting one ring。One gantry plate shall be set up at each side of post, 500mm away from the center of post. Other gantry plates shall be set at 1500mm intervals.Installation and lifting of tank shell plates。脹緊后在脹圈千斤頂接頭的兩側(cè)各用一個(gè)傳力筋板(龍門板)扣住分別焊在罐壁上,并用銷子與罐壁打?qū)?。After all the following work has been done and checked out: base plate of the tank has been surface treated for anticorrosion and laid out, welded and installed。墊板與底板點(diǎn)焊,在其上表面劃出壁板安裝線,在線兩側(cè)點(diǎn)焊擋板。這樣布置既可使單個(gè)立柱有足夠的剛度,又使所有立柱形成封閉系統(tǒng),充分保證立柱組成的提升系統(tǒng)的穩(wěn)定性。――手拉葫蘆起重折減系數(shù),取167。Prepare tools used in the construction such as gantry plates, pins, small hammer, large hammer, sample plates, etc. The specification of liner plate for post is 400x400x12. 手拉葫蘆數(shù)量的確定Decide the quantity of manual pulleys 選用各儲(chǔ)罐所需要的手拉葫蘆載荷量Select the load of manual pulley required by each tank 手拉葫蘆數(shù)量的確定主要依據(jù)手拉葫蘆的承載能力和提升儲(chǔ)罐最后提升的最大載荷。各大段之間采用手壓千斤頂脹緊在罐壁上。The numbers of tanks using flip chip construction with manual pulley hoisting are in the order of: TXX6TXX6TXX70、TXX0TXX0TXX0TXX0TXX0TXXTXX1TXX12A、TXX12B、TXX12C 、TXX1TXX1TXX1TXX2TXX01A、TXX01B、TXX0TXX0TXX0TXX5TXXTXXTXX50 Total 26。手拉葫蘆提升倒裝施工方案Chain Block Inverse Installation Construction Procedure目錄Contents1. 工程概述 3Project profile 32. 工程內(nèi)容 3Project contents 33. 手拉葫蘆提升倒裝法施工技術(shù)施工順序 3Construction order of flip chip construction technology with manual pulley hoisting 34. 手拉葫蘆提升裝置的準(zhǔn)備 5The preparation of manual pulley hoisting device 55. 手拉葫蘆立柱的平面布置說明 9Plane layout instructions of manual pulley posts 9……………………………………………………………..10 Installation