【正文】
ffness. Factors that affect the quality of many roads, there are design factors, quality factors are building materials, and construction factors, and construction quality construction personnel with a sense of responsibility, technical quality, as well as machinery, construction techniques and so on. In short, the road quality is the ultimate issue of a prehensive, quality is good or bad is a prehensive reflection of various factors. 2 preparatory phase Asphalt pavement construction in the preparation phase of the main tasks are: familiar with the design drawings, staffing, concrete mix design, mixing field settings, and other material prepared. Familiar with the design drawings, tender documents and the terms of the contract. Familiar with the design drawings, tender documents and contract preparation phase is a primary task, usually by the technical staff and project manager who is mainly responsible for the Department to do. Cement Concrete Pavement in front of a lot of preparatory work, baseline setting, the work of watering and discharge, and is familiar with the design of paper, the tender documents and the terms of the contract is the primary task of the preparatory phase. This is normally by the technical staff and project manager who is mainly responsible for the Department to do so through a detailed analysis and research, you can grasp the scale of the project and calculate an accurate number of asphalt concrete. Asphalt concrete mix for juice. Laboratory is prepared by the site of raw materials, to the owners of the professional laboratory designated to do ahead of time to do a good job as far as possible, preferably before the pletion of reserve materials. Mixing field settings need to be fully considered in the transport site on the location of economic rationality, the venue should be large, flat, and the surrounding environment and residents of no effect, and not subject to flooding intrusive. To minimize the production area and living area separated from the living area and the wind in the E Department. Road transport to site formation, convenient access to vehicles of all kinds of machinery to facilitate the Uturn, reduce mutual interference, at the same time to fuel and asphalt, such as flammable liquids and a variety of heating and power settings separated. Power consumption is selfor grid access must also consider the power sector. Materials preparation. Required to do a good job in all kinds of asphalt pavement materials procurement is very important to take the quality of materials is the quality of asphalt Concrete pavement of the most important factor in good or bad. Equipment installation and debugging. Mixture of asphalt concrete mixing an